
Sattva Engineering Construction IPO GMP & Review: Apply or Avoid?
Posted by : sachet | Mon Aug 25 2025

The Sattva Engineering Construction IPO is open for bidding from 26th August 2025 to 29th August 2025. It is a bookbuilding IPO of ₹35.38 crore, comprising a fresh issue of 0.47 crore shares. The issue will be listed on NSE and SME on its tentative listing date, 3rd September 2025.
Sattva Engineering Construction IPO Details
The Sattva Engineering Construction IPO date is fixed between 26th August 2025 and 29th August 2025. The face value of Sattva Engineering Construction IPO shares stands at ₹10 per share, and the IPO price is set at ₹70 to ₹75 per share.
MUFG Intime India Private Limited is the registrar of the Sattva Engineering Construction IPO and is responsible for managing the allotment process and initiating refunds. Check out the latest IPO details in the table below.
IPO Open Date | 26th August 2025 |
IPO Close Date | 29th August 2025 |
IPO Allotment Date | 1st September 2025 |
Refund Initiation | 2nd September 2025 |
Issue Size | 47,16,800 shares(aggregating up to ₹35.38 Cr) |
Face Value | ₹10 per share |
Lot Size | 1,600 shares |
Issue Price Band | ₹70 to ₹75 per share |
Issue Type | Bookbuilding IPO |
Listing At | NSE & SME |
Listing Date | 3rd September 2025 |
Sattva Engineering Construction IPO Share Reservation
Sattva Engineering Construction IPO is a bookbuilding IPO of ₹35.38 crores, comprising a fresh issue of 0.47 crore shares. Sattva Engineering Construction shares will be listed on the NSE and SME. Furthermore, SEBI has specified the share reservation criteria for different investor categories.
Investor Categories | Shares Offered |
QIB Shares Offered | Not more than 50% of the Net Issue |
Retail Shares Offered | Not less than 35.00% of the Net Issue |
NII (HNI) Shares Offered | Not Less than 15% of the Net Issue |
Sattva Engineering Construction IPO GMP Grey Market Premium
GMP is the gap between the price band of the issue and the price at which company shares are currently trading in the grey market. Do you want to get live updates on the Sattva Engineering Construction IPO? If yes, then you’ve reached the right spot. Check the table below to learn about the GMP trends.
GMP Date | IPO Price | GMP | Estimated Listing Price | Estimated Listing Gains |
24-08-2025 | ₹75.00 | ₹15.00 | ₹90.00 | 20.00% |
23-08-2025 | ₹75.00 | ₹15.00 | ₹90.00 | 20.00% |
22-08-2025 | ₹75.00 | ₹15.00 | ₹90.00 | 20.00% |
21-08-2025 | ₹75.00 | ₹0.00 | ₹75.00 | 0.00% |
20-08-2025 | ₹75.00 | ₹0.00 | ₹75.00 | 0.00% |
19-08-2025 | ₹75.00 | ₹0.00 | ₹75.00 | 0.00% |
As of 24th August 2025, Sattva Engineering Construction IPO GMP stands at ₹15 per share, which means the share will likely show a listing at ₹90 on its tentative listing date, 3rd September 2025.
GMP data is subject to change based on market trends and sentiments. You should check the live GMP status before applying for the Sattva Engineering Construction GMP. Stay informed with Univest to know about real-time insights on IPOs and their GMP trends.
Sattva Engineering Construction IPO GMP Review

Check out the detailed Sattva Engineering Construction GMP IPO review for a thorough understanding of its potential to report listing gains on 3rd September 2025. The Sattva Engineering Construction IPO review below will help you invest effectively to avoid significant losses. Explore more to make informed investment decisions on this IPO.
Financial Health
Assess a company’s financial performance to know about its ability to sustain a competitive edge. Thus, it is essential to understand the growth margins and declines of the business’s financials before applying for the Sattva Engineering Construction IPO.
Sattva Engineering Construction Limited’s revenue increased by 17.49% from ₹77.73 crores in March 2024 to ₹91.33 crores in March 2025. Moreover, the company’s PAT rose by 85.652% from ₹5.09 crores to ₹9.45 crores.
Sattva Engineering Construction Limited’s IPO has shown consistent revenue growth, indicating that the company is financially stable. Moreover, the brokers, investors, and RAs have a positive outlook for the Sattva Engineering Construction IPO for its tentative listing day, 2nd September 2025.
Technical Analysis
Several technical indicators are available to assess a company’s potential to deliver returns. Use the parameters mentioned below to analyse the technical aspects of the Sattva Engineering Construction IPO.
Key Indicators | Value |
PE Ratio (Price-to-Earnings) | 10.46 |
EPS (Earnings Per Share) | 7.17 |
RoNW | 27.10% |
ROCE | 28.58% |
ROE | 27.10% |
EBITDA Margin | 19.82% |
Price to Book Value | 2.20 |
Market Capitalisation | ₹131.01 Cr. |
The P/E ratio of Sattva Engineering Construction Limited’s share is 10.46, and its Earnings Per Share (EPS) stands at 7.17. Thus, the Sattva Engineering Construction Limited IPO can deliver gains on its tentative listing date, 3rd September 2025.
Note: The data, as mentioned above, is taken from authentic sources and highlights pre-issue information. The PE ratio and EPS of Sattva Engineering Construction Limited are subject to change after the IPO. Explore the table below to get post-issue updates on these two metrics.
Sattva Engineering Construction Limited IPO Peer Comparison
Company Name | EPS | P/E Ratio | RoNW | Face value | Revenue |
Sattva Engineering & construction Limited | 7.64 | 10.46 | 27.10 | ₹10 | 77.44 |
EMS Limited | 33.05 | 18.23 | 20.66 | ₹10 | 809.00 |
Enviro Infra Engineers Limited | 11.76 | 21.50 | 27.58 | ₹10 | 738.00 |
Va Tech Wabag Limited | 47.48 | 33.40 | 14.86 | ₹2 | 2,900 |
Sattva Engineering Construction IPO Subscription Status
The Sattva Engineering Construction IPO is to be opened for bidding on 26th August 2025. The subscription status for this IPO is yet to be announced. Stay informed on this passage to check the live Sattva Engineering Construction IPO subscription status.
Investor Category | Shares Offered | Shares Subscribed | Subscription to the Times |
QIB Shares Offered | Not more than 50% of the Net Issue | Yet to be announced | Yet to be announced |
Retail Shares Offered | Not less than 35.00% of the Net Issue | Yet to be announced | Yet to be announced |
NII (HNI) Shares Offered | Not Less than 15% of the Net Issue | Yet to be announced | Yet to be announced |
About Sattva Engineering Construction Limited

Sattva Engineering Construction Limited was incorporated in December 2005, a Chennai-based construction company with over 40 years of experience in construction. It is the leading contractor collaborating with the government bodies specialising in water infrastructure, wastewater management, and industrial construction projects.
- Operational Excellence by an in-house designing, engineering and construction team.
- Strong order management.
- Skilled professional and management team.
- Use of modern technology in the construction and maintenance
Sattva Engineering Construction Limited Financials
The company’s financial analysis is essential before applying for the Sattva Engineering Construction IPO. Look at the table to learn about Sattva Engineering Construction Limited’s financials.
Year Ended | 31st March 2025 (in cr.) | 31st March2024 (in Cr) | 31st March 2025 (in Cr) |
Assets | 114.82 | 87.48 | 83.38 |
Revenue | 94.85 | 77.44 | 83.93 |
Profit After Tax | 9.14 | 4.56 | 1.04 |
EBITDA | 18.56 | 11.72 | 7.28 |
Net Worth | 43.42 | 24.03 | 19.47 |
Reserve and surplus | 30.67 | 23.03 | 18.47 |
Total Borrowing | 36.17 | 32.20 | 32.24 |
Explanation
Sattva Engineering Construction Limited’s revenue increased by 22% from ₹77.44 crores in March 2024 to ₹94.85 crores in March 2025. Moreover, the company’s PAT rose by 100% from ₹4.56 crores to ₹9.14 crores.
Sattva Engineering Construction IPO Bidding Requirements
Investors can bid for a minimum of 3,200 shares and in multiples of 1,600 shares thereof. The following table represents the minimum and maximum investments by individual investors (retail) and HNI in terms of shares and amount.
Application | Lots | Shares | Amount |
Individual Investors (Retail) (Min) | 2 | 3,200 | ₹2,56,000 |
Individual Investors (Retail) (Max | 2 | 3,200 | ₹2,56,000 |
S-HNI (Min) | 3 | 4,800 | ₹3,84,000 |
S-HNI (Max) | 8 | 12,800 | ₹9,60,000 |
B-HNI (Min) | 9 | 14,400 | ₹10.80,000 |
Sattva Engineering Construction IPO has reserved lot sizes for different investor categories. Look at the table below to see the requirements for applying for this IPO.
Use the lot size calculator to find how many shares you should apply for!
Sattva Engineering Construction IPO Promoter Holding
Have a look at the table below to check the holdings of Sattva Engineering Construction Limited’s promoters: Santhanam Seshadri, R Sekar and Jagachchandarr Sekar Uthra.
Share Holding Pre-Issue | 86.18% |
Share Holding Post-Issue | – |
Note: The value will be calculated using Equity Dilution = Share Holding Pre-Issue – Share Holding Post-Issue.
Aim of the Sattva Engineering Construction IPO
The primary aim of the Sattva Engineering Construction IPO is to raise ₹35.38 crores. On the other hand, Sattva Engineering Construction has decided to utilise these funds in different ways. Explore some of the secondary objectives for the Sattva Engineering Construction IPO.
- To meet the general corporate purpose.
- To fund the working capital of the company.
Should I Invest in the Sattva Engineering Construction IPO?
Explore the pros and cons of Sattva Engineering Construction to know whether you should apply or avoid the issue. These pros and cons might help you know about the IPO’s efficiency in delivering profits in the coming decades.
Pros of Sattva Engineering Construction IPO
- Strong domain and specialisation
- Robust technology advancement and operation excellence
- Collaborating with government bodies
- Strong management and leadership skills
- Offers a broad range of EPC services.
Cons of Sattva Engineering Construction IPO
- High risk of customer concentration.
- High reliant on governemnt funded projects.
- Strong competion from established and large companies.
- Delays in project or cost overruns due to environmental concerns.
How to Apply for the Sattva Engineering Construction IPO?

Check the steps mentioned below to apply for Sattva Engineering Construction Limited.
- Step 1: Conduct thorough research on the Sattva Engineering Construction IPO GMP, subscription status, issue size, lot size, and other details.
- Step 2: Open a demat account on Univest to learn about real-time insights on GMP and subscription status. You can also use your previous demat account by navigating to the IPO section.
- Step 3: Make a bid for two lots of 3,200 shares worth ₹2,40,000.
- Step 4: You will receive a mandate request after making a bid. Approve the request to proceed further.
Note: You can apply for the Sattva Engineering Construction IPO from more than one demat account to increase your chances of allotment.
How to Check Sattva Engineering Construction IPO Allotment Status?
You can check whether the Sattva Engineering Construction IPO allotment has been completed in different ways. These include NSE and the registrar portal. Look at the steps mentioned below to check your allotment status online.
Check On BSE
- Visit the NSE Official Website.
- Navigate to the IPO Allotment Section.
- Select Equity as the issue type.
- Choose the Sattva Engineering Construction IPO.
- Choose whether to proceed with the PAN number or the application number.
- Submit your details to get the allotment status online.
Check On the Registrar Portal
- Visit the registrar portal.
- Click on the allotment option.
- Fill in the required details.
- Click on the submit button to know your Sattva Engineering Construction IPO allotment status.
Let’s Wrap
Sattva Engineering Construction IPO is a bookbuilding issue of shares worth ₹35.38 crores. The shares of Sattva Engineering Construction Limited will be listed on NSE and SME on its tentative listing date of 3rd September 2025. Researching the Sattva Engineering Construction IPO GMP and reviews is highly suggested to book your ideal profitability. Brokers and investors have highlighted their pros and cons, so one must analyse them and decide accordingly.
Open a demat account on Univest now to initiate your investment journey!
Also Read : ARC Insulation & Insulators IPO GMP: Day 1 IPO Live Updates
FAQs on Sattva Engineering Construction IPO
How is the Sattva Engineering Construction IPO?
Ans. Currently, on 24th August 2025, the Sattva Engineering Construction IPO GMP (Grey Market Premium) stands at ₹15. It indicates that the estimated listing price could be ₹90 per share. It is a bookbuilding IPO of ₹35.38 crores, comprising a fresh issue of 0.47 crore shares. The face value of each share of Sattva Engineering Construction Limited is ₹10 per share.
What is the Sattva Engineering Construction IPO price?
Ans. The Sattva Engineering Construction IPO price is set at ₹70.00 to ₹75.00 per share. Retail investors can apply for a minimum of 2 lots consisting of 3,200 shares worth ₹2,40,000. Moreover, HNIs are required to bid for a minimum of 3 lots (4,800 shares) worth ₹3,60,000.
Is the Sattva Engineering Construction IPO good?
Ans. Sattva Engineering Construction Limited’s revenue increased by 22% from ₹77.44 crores in March 2024 to ₹94.85 crores in March 2025. Moreover, the company’s PAT rose by 100% from ₹4.56 crores to ₹9.14 crores.
Who is the registrar of the Sattva Engineering Construction IPO?
Ans. MUFG Intime India Private Limited is the registrar of the Sattva Engineering Construction IPO, responsible for managing the IPO allotment procedure and refund initiation. For any queries regarding the Sattva Engineering Construction allotment and refund, you can contact MUFG Intime India Private Limited at ipo.helpdesk@linkintime.co.in, +91-22-4918 6270.
What is the issue size of the Sattva Engineering Construction IPO?
Ans. Sattva Engineering Construction IPO is a bookbuilding IPO for 0.47 crore shares worth ₹35.38 crores. Moreover, the IPO is set to open on 26th August 2025 and will be closed on 29th August 2025.
Disclaimer: The above information is compiled from authentic sources and is just for informational purposes. To have detailed information about the Sattva Engineering Construction IPO, download the Sattva Engineering Construction IPO RHP and Sattva Engineering Construction IPO DRHP. Conduct your research before investing in IPOs to avoid significant losses. You can also consult your financial advisor.
Upcoming IPOs
IPO Names | Expected Year of IPO |
PhonePe IPO | 2025 |
Bajaj Energy IPO | 2025 |
OYO IPO | 2025 |
Sattva Engineering Construction IPO | 2025 |
Flipkart IPO | 2025 |
Zepto IPO | 2025 |
boAt IPO | 2025 |
Meesho IPO | 2025 |
Jio IPO | 2026 |
NSE IPO | 2025 |
Current & Previous IPOs
Company | IPO Open | IPO Close | Type |
ARC Insulation & Insulators IPO | 21st August 2025 | 25th August 2025 | SME |
Mangal Electricals Industries IPO | 20th August 2025 | 22nd August 2025 | Mainboard |
Patel Retail IPO | 19th August 2025 | 21st August 2025 | Mainboard |
Vikram Solar IPO | 19th August 2025 | 21st August 2025 | Mainboard |
Gem Aromatics IPO | 19th August 2025 | 21st August 2025 | Mainboard |
Shreeji Shipping Global IPO | 19th August 2025 | 21st August 2025 | Mainboard |
LGT Business Connextions IPO | 19th August 2025 | 21st August 2025 | SME |
Studio LSD IPO | 18th August 2025 | 20th August 2025 | SME |
Regaal Resources IPO | 12th August 2025 | 14th August 2025 | Mainboard |
Bluestone Jewellery IPO | 11th August 2025 | 13th August 2025 | Mainboard |
JSW Cement IPO | 7th August 2025 | 11th August 2025 | Mainboard |
Read Our Articles on the Best Stocks
Tech Stocks in India to Invest in 2025 | Tech Sector Stocks
Best Battery Stocks in India to Invest in 2025 | Battery Sector Stocks
Best Shipping Stocks in India to Invest in 2025 | Shipping Sector Stocks
Paint Stocks in India to Invest in 2025 | Paint Sector Stocks
Paper Stocks in India to Invest in 2025 | Paper Sector Stocks
Best Semiconductor Stocks in India 2025
Best Large Cap Stocks in India 2025
Best Cement Stocks To Invest in India
Also Explore
Best Stocks | Multibagger Stocks | Penny Stocks | Fundamentally Strong Stocks | Sector-Wise Stocks | PSU /Government Stocks |
For the Next 10 Years | For the Next 5 Years | Solar Penny Stocks | On BSE | Solar Energy Sector | PSU Stocks List |
Long Term | Below 100 Rs | Top 5 Penny Stocks | For Long-Term | Hospitality Sector | PSU Stocks in 2025 |
Best Bike Stocks | For 2025 | Best Penny Stocks in India | Penny Shares | Hotel Sector | Government Stocks in 2024 |
Best Liquor Stocks | High-Growth Stocks | For 2025 | Agriculture Sector | Government Stocks List | |
Best Railway Stocks | Under 500 | Penny Stocks | Pharma Sector | Government Stocks in 2025 | |
Best Auto Stocks | For 2026 | Oil and Gas Sector |
Univest Screeners
Explore Webstories on Univest
1. Best Time To Buy Dividend Stocks
2. How RBI Policies Affect Dividend Stocks
3. Can Dividend Stocks Beat Inflation
4. What Is The Dividend Aristocrat List