McNally Bharat vs Bondada Engineering vs Ramky Infrastructure: Which Stock Should You Track
- October 14, 2026
- Posted by: Neeraj Pandey
- Category: Market
McNally Bharat Engineering PE 0.41, mkt cap Rs 1,488 crore. Bondada Engineering PE 14.91, mkt cap Rs 3,330 crore. Ramky Infrastructure PE 7.59, mkt cap Rs 1,856 crore.
Quick Answer
McNally Bharat Engineering vs Bondada Engineering vs Ramky Infrastructure is a side-by-side comparison of three companies from the engineering and EPC space. On this comparison, McNally Bharat Engineering carries a market capitalisation of about Rs 1,488 crore, against Rs 3,330 crore for Bondada Engineering and Rs 1,856 crore for Ramky Infrastructure, with return on equity of -77.42%, 29.32% and 10.38% respectively. Each company’s numbers are presented here without a declared preference, since the right stock depends on an investor’s own criteria.
McNally Bharat Engineering vs Bondada Engineering vs Ramky Infrastructure starts with the core numbers most investors compare within the engineering and EPC segment: market capitalisation, valuation multiples, profitability, dividend yield and the latest quarterly results. Figures below are sourced as of October 2026 and will shift with daily price moves.
All three names sit in the engineering and EPC bucket, which makes them a natural set to place side by side rather than a random trio of unrelated businesses. The sections below cover the company profiles, a valuation table, the latest quarter and a five-quarter trend for revenue and net profit.
Click Here – Get Free Investment Predictions
McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure: Company Overview
McNally Bharat Engineering is a listed Indian company in the engineering and EPC space, tracked here on book value, return ratios and valuation alongside its peers in this comparison. It has a market capitalisation of about Rs 1,488 crore, a return on equity of -77.42% and a book value of Rs 171.24 per share. Its quarterly revenue moved from Rs 14.96 crore in June 2025 to Rs 15.20 crore in June 2026, a change of +1.6%.
Bondada Engineering is a listed Indian company in the engineering and EPC space, tracked here on book value, return ratios and valuation alongside its peers in this comparison. It has a market capitalisation of about Rs 3,330 crore, a return on equity of 29.32% and a book value of Rs 62.15 per share. Its quarterly revenue moved from Rs 559.62 crore in June 2025 to Rs 698.90 crore in June 2026, a change of +24.9%.
Ramky Infrastructure is a listed Indian company in the engineering and EPC space, tracked here on book value, return ratios and valuation alongside its peers in this comparison. It has a market capitalisation of about Rs 1,856 crore, a return on equity of 10.38% and a book value of Rs 312.50 per share. Its quarterly revenue moved from Rs 440.37 crore in June 2025 to Rs 543.32 crore in June 2026, a change of +23.4%.
McNally Bharat Engineering vs Bondada Engineering vs Ramky Infrastructure: Valuation and Profitability Snapshot
| Metric | McNally Bharat Engineering | Bondada Engineering | Ramky Infrastructure |
|---|---|---|---|
| Market Cap (approx.) | Rs 1,488 crore | Rs 3,330 crore | Rs 1,856 crore |
| PE Ratio (TTM) | 0.41 | 14.91 | 7.59 |
| PB Ratio | 2.61 | 4.80 | 0.86 |
| Return on Equity (ROE) | -77.42% | 29.32% | 10.38% |
| EPS (TTM, Rs) | 1096.36 | 20.00 | 35.34 |
| Dividend Yield | 0.00% | 0.09% | 0.37% |
| Debt to Equity | 0.17 | 0.42 | 0.27 |
| Book Value per Share (Rs) | 171.24 | 62.15 | 312.50 |
Check the Univest Screener for Live Data
On valuation, McNally Bharat Engineering trades at a PE of 0.41 and a PB of 2.61, Bondada Engineering at a PE of 14.91 and a PB of 4.80, while Ramky Infrastructure trades at a PE of 7.59 and a PB of 0.86. On return on equity, the three post -77.42%, 29.32% and 10.38% respectively, and on dividend yield they stand at 0.00%, 0.09% and 0.37%. Bondada Engineering has the highest market capitalisation of the three at Rs 3,330 crore, while McNally Bharat Engineering has the lowest at Rs 1,488 crore. Bondada Engineering has the highest PE ratio of the three at 14.91, while McNally Bharat Engineering has the lowest at 0.41. Bondada Engineering has the highest return on equity of the three at 29.32%, while McNally Bharat Engineering has the lowest at -77.42%. Bondada Engineering has the highest debt to equity ratio of the three at 0.42, while McNally Bharat Engineering has the lowest at 0.17. Debt to equity is 0.17, 0.42 and 0.27 for the three respectively.
McNally Bharat Engineering vs Bondada Engineering vs Ramky Infrastructure: Latest Quarterly Results
| Company | Latest Quarter Revenue | Latest Quarter Net Profit | YoY Change (Revenue) | QoQ Change (Revenue) | YoY Change (Net Profit) |
|---|---|---|---|---|---|
| McNally Bharat Engineering | Rs 15.20 crore | -Rs 25.27 crore | +1.6% | -0.5% | NA |
| Bondada Engineering | Rs 698.90 crore | Rs 53.94 crore | +24.9% | -23.7% | +29.3% |
| Ramky Infrastructure | Rs 543.32 crore | Rs 38.80 crore | +23.4% | +4.2% | -49.6% |
Quarterly figures above are the most recent reported quarter for each company (Q1 FY27, quarter ended June 2026), compared with the year-ago and preceding quarter. A percentage change in net profit is shown as NA where the comparison quarter was a loss or the latest quarter is a loss, since the percentage is not meaningful in that case.
McNally Bharat Engineering vs Bondada Engineering vs Ramky Infrastructure: Five-Quarter Revenue and Net Profit Trend
The five-quarter view below shows how revenue and net profit moved from June 2025 to June 2026 for each company in McNally Bharat Engineering vs Bondada Engineering vs Ramky Infrastructure, which helps separate a one-quarter move from a steadier pattern.
Quarterly revenue (Rs crore)
| Quarter | McNally Bharat Engineering | Bondada Engineering | Ramky Infrastructure |
|---|---|---|---|
| June 2025 | Rs 14.96 crore | Rs 559.62 crore | Rs 440.37 crore |
| September 2025 | Rs 19.54 crore | Rs 660.77 crore | Rs 528.80 crore |
| December 2025 | Rs 24.90 crore | Rs 716.90 crore | Rs 550.70 crore |
| March 2026 | Rs 15.27 crore | Rs 916.20 crore | Rs 521.67 crore |
| June 2026 | Rs 15.20 crore | Rs 698.90 crore | Rs 543.32 crore |
Quarterly net profit (Rs crore)
| Quarter | McNally Bharat Engineering | Bondada Engineering | Ramky Infrastructure |
|---|---|---|---|
| June 2025 | -Rs 230.26 crore | Rs 41.71 crore | Rs 77.04 crore |
| September 2025 | Rs 3,810.17 crore | Rs 52.32 crore | Rs 75.63 crore |
| December 2025 | -Rs 61.23 crore | Rs 54.16 crore | Rs 78.00 crore |
| March 2026 | -Rs 69.13 crore | Rs 62.88 crore | Rs 52.11 crore |
| June 2026 | -Rs 25.27 crore | Rs 53.94 crore | Rs 38.80 crore |
McNally Bharat Engineering reported revenue of Rs 14.96 crore in June 2025 and Rs 15.20 crore in June 2026, a change of +1.6% across the period. Its highest quarterly revenue in this window was Rs 24.90 crore in December 2025. Net profit stood at -Rs 25.27 crore in June 2026, which is a net profit margin of -166.25% (a net loss for the quarter). McNally Bharat Engineering reported a net loss in June 2025, December 2025, March 2026 and June 2026.
Bondada Engineering reported revenue of Rs 559.62 crore in June 2025 and Rs 698.90 crore in June 2026, a change of +24.9% across the period. Its highest quarterly revenue in this window was Rs 916.20 crore in March 2026. Net profit stood at Rs 53.94 crore in June 2026, which is a net profit margin of 7.72%.
Ramky Infrastructure reported revenue of Rs 440.37 crore in June 2025 and Rs 543.32 crore in June 2026, a change of +23.4% across the period. Its highest quarterly revenue in this window was Rs 550.70 crore in December 2025. Net profit stood at Rs 38.80 crore in June 2026, which is a net profit margin of 7.14%.
Download the Univest iOS App or Univest Android App to track McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure live prices.
What Should Investors Look at Beyond These Numbers?
Beyond the metrics above, investors comparing these three engineering and EPC names should track quarter-on-quarter revenue and margin trends, management commentary on demand and cost drivers, and factors specific to the segment such as order book size, execution pace, receivable cycles, working capital needs and debt levels. A single-quarter snapshot can shift quickly, and smaller companies in particular can show wide swings from one quarter to the next.
It also helps to read the latest quarterly filings and investor presentations of McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure directly, since the figures here come from standardised data and do not capture company-specific context such as one-time items, order timing or promoter actions.
Conclusion
McNally Bharat Engineering vs Bondada Engineering vs Ramky Infrastructure highlights how differently three companies in the same engineering and EPC segment can look across valuation, profitability and dividend metrics, even when operating in a similar space. This comparison does not declare a winner; investors should weigh these figures against their own research and risk appetite. Please read the disclaimer below before making any investment decision.
Disclaimer: Data and figures in this article are sourced from publicly available information as of October 2026 and may not reflect real-time prices. Please verify all data independently before making any investment decision. This comparison does not recommend or endorse any single stock over another; investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).
FAQs on McNally Bharat Engineering vs Bondada Engineering vs Ramky Infrastructure
What is the market cap difference between McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure?
Ans. As of October 2026, McNally Bharat Engineering has a market cap of approximately Rs 1,488 crore, Bondada Engineering is at approximately Rs 3,330 crore, and Ramky Infrastructure is at approximately Rs 1,856 crore.
What are the PE and PB ratios of McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure?
Ans. As of October 2026, the PE ratios stand at 0.41, 14.91 and 7.59 respectively, and the price to book ratios stand at 2.61, 4.80 and 0.86 respectively.
Which of the three has the highest ROE?
Ans. McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure post ROE of -77.42%, 29.32% and 10.38% respectively as of October 2026. Bondada Engineering has the highest return on equity of the three at 29.32%, while McNally Bharat Engineering has the lowest at -77.42%.
Which of these three stocks pays the highest dividend yield?
Ans. McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure carry dividend yields of 0.00%, 0.09% and 0.37% respectively.
What is the debt to equity ratio for McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure?
Ans. McNally Bharat Engineering carries a debt to equity of 0.17, Bondada Engineering of 0.42, and Ramky Infrastructure of 0.27.
What were the latest quarterly revenue and net profit of McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure?
Ans. For Q1 FY27 (quarter ended June 2026), McNally Bharat Engineering reported revenue of Rs 15.20 crore and net profit of -Rs 25.27 crore, Bondada Engineering reported revenue of Rs 698.90 crore and net profit of Rs 53.94 crore, and Ramky Infrastructure reported revenue of Rs 543.32 crore and net profit of Rs 38.80 crore.
Does this comparison recommend one of McNally Bharat Engineering, Bondada Engineering and Ramky Infrastructure?
Ans. This comparison does not declare one stock ahead of another; each company scores differently across valuation, profitability and dividend metrics, and the right fit depends on an individual investor’s own criteria and research.