{"id":64996,"date":"2026-03-24T00:10:00","date_gmt":"2026-03-23T18:40:00","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=64996"},"modified":"2026-03-23T13:38:15","modified_gmt":"2026-03-23T08:08:15","slug":"tipco-engineering-ipo-subscription-status-day-2","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/","title":{"rendered":"Tipco Engineering IPO Subscription Status Day 2"},"content":{"rendered":"<p>Here, the Tipco Engineering IPO launched on 23rd March 2026. Bidding for the issue will close today, 25th March 2026. The primary aim of the <strong>Tipco Engineering IPO<\/strong> is to raise \u20b960.55 crores from the market. Also, the Tipco Engineering IPO has received an impressive level of subscription, indicating that the shares will be listed at an impeccable premium. Scroll down to check the Tipco Engineering IPO subscription and details.&nbsp;<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Tipco_Engineering_IPO_Details\" title=\"Tipco Engineering IPO Details&nbsp;\">Tipco Engineering IPO Details&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Tipco_Engineering_IPO_Subscription_Status\" title=\"Tipco Engineering IPO Subscription Status\">Tipco Engineering IPO Subscription Status<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Tipco_Engineering_IPO_GMP_Today\" title=\"Tipco Engineering IPO GMP Today\">Tipco Engineering IPO GMP Today<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#About_Tipco_Engineering_Limited\" title=\"About Tipco Engineering Limited\">About Tipco Engineering Limited<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Tipco_Engineering_Limited_Financials\" title=\"Tipco Engineering Limited Financials\">Tipco Engineering Limited Financials<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Explanation\" title=\"Explanation\">Explanation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Technical_Indicators\" title=\"Technical Indicators\">Technical Indicators<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Tipco_Engineering_IPO_Listing_Expectations\" title=\"Tipco Engineering IPO Listing Expectations\">Tipco Engineering IPO Listing Expectations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Tipco_Engineering_IPO_Dates\" title=\"Tipco Engineering IPO Dates\">Tipco Engineering IPO Dates<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/tipco-engineering-ipo-subscription-status-day-2\/#Recent_Articles\" title=\"Recent Articles\">Recent Articles<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tipco_Engineering_IPO_Details\"><\/span><strong>Tipco Engineering IPO Details&nbsp;<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>23rd March 2026<\/td><\/tr><tr><td><strong>Face Value&nbsp;<\/strong><\/td><td>\u20b910 per share<\/td><\/tr><tr><td><strong>Price Band<\/strong><\/td><td>\u20b984 to \u20b989<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>1,600 Shares&nbsp;<\/td><\/tr><tr><td><strong>Issue Type<\/strong><\/td><td>Bookbuilding IPO<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td>BSE &amp; SME<\/td><\/tr><tr><td><strong>IPO Close Date&nbsp;<\/strong><\/td><td>25th March 2026<\/td><\/tr><tr><td><strong>Listing Date&nbsp;<\/strong><\/td><td>1st April 2026<\/td><\/tr><\/tbody><\/table><\/figure><p>The price band for the Tipco Engineering IPO has been set at \u20b984 to \u20b989 per share. Let&#8217;s segregate the share quota fixed for different categories of investors.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Investor Categories<\/strong><\/td><td><strong>Shares Offered&nbsp;<\/strong><\/td><td><strong>% of Shares offered<\/strong><\/td><\/tr><tr><td><strong>Market Maker Shares Offered<\/strong><\/td><td>10,20,800<\/td><td>15.00%<\/td><\/tr><tr><td><strong>QIB Shares Offered&nbsp;<\/strong><\/td><td>28,76,800<\/td><td>42.29%<\/td><\/tr><tr><td><strong>NII (HNI) Shares Offered<\/strong><\/td><td>8,73,600<\/td><td>8,73,600<\/td><\/tr><tr><td><strong>Retail Shares Offered&nbsp;<\/strong><\/td><td>20,32,000<\/td><td>20,32,000<\/td><\/tr><tr><td><strong>Total Shares Offered<\/strong><\/td><td>68,03,200<\/td><td>68,03,200<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tipco_Engineering_IPO_Subscription_Status\"><\/span><strong>Tipco Engineering IPO Subscription Status<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>As of now, the Tipco Engineering IPO has been subscribed to 0.00 times. Of these, 0.00 times are subscribed by retail investors, 0.00 times by non-institutional investors, and 0.00 times by QII (Qualified Institutional Investors).&nbsp;&nbsp;<\/p><p>The healthy subscription status indicates that investors are expecting higher returns at the time of Tipco Engineering&#8217;s IPO listing on 1st April 2026. Tipco Engineering also has a positive outlook behind the fresh issue of 0.54 crore shares, which will raise around Rs 60.55 crores.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tipco_Engineering_IPO_GMP_Today\"><\/span><strong>Tipco Engineering IPO GMP Today<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1-1024x536.jpg\" alt=\"Tipco Engineering India IPO GMP\" class=\"wp-image-64997\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1-1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1-300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1-768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1-900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1-600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1-150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>We know that higher subscription levels drive grey-market premiums for IPOs. Let\u2019s explore the Tipco Engineering IPO GMP for 24th March 2026.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>GMP DATE<\/strong><\/td><td><strong>IPO Price<\/strong><\/td><td><strong>GMP Price<\/strong><\/td><td><strong>Estimated Listing Price<\/strong><\/td><td><strong>Estimated Gain<\/strong><\/td><\/tr><tr><td><strong>24-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>23-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>22-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>21-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>20-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>19-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>18-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>17-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>16-3-2026<\/strong><\/td><td>\u20b989.00<\/td><td>\u20b90.00<\/td><td>\u20b989.00<\/td><td>0.00%<\/td><\/tr><\/tbody><\/table><\/figure><p>The grey market premium for this IPO rises to \u20b90.00 per share. It indicates that the estimated listing price per share is Rs 98.00. Numerous factors played a pivotal role in this jump in Tipco Engineering&#8217;s GMP ahead of its IPO. These include higher subscription rates, favourable market sentiment, and investors&#8217; positive attitude towards IPOs.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"About_Tipco_Engineering_Limited\"><\/span><strong>About Tipco Engineering Limited<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Tipco Engineering is engaged in manufacturing and supplying industrial machinery for various industries, including paint and coatings, chemicals, printing and packaging, metal, construction, and infrastructure. The company operates two units located at Rai Industrial Estate, Sonipat, Haryana, each covering about 1,012.50 sq. meters. The facilities are equipped with advanced CNC machines, laser cutting equipment, welding units, polishing machines, and quality testing systems.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tipco_Engineering_Limited_Financials\"><\/span><strong>Tipco Engineering Limited Financials<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>The company&#8217;s financial analysis is essential before applying for the<strong> Tipco Engineering IPO. <\/strong>See the table for Tipco Engineering Limited&#8217;s financials.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Year Ended<\/strong><\/td><td><strong>31st Dec 2025 (in cr.)<\/strong><\/td><td><strong>31st March 2025 (in cr.)<\/strong><\/td><td><strong>31st March 2024 (in cr.)<\/strong><\/td><td><strong>31st March 2023<\/strong><\/td><\/tr><tr><td><strong>Assets<\/strong><\/td><td>114.55<\/td><td>100.96<\/td><td>65.72<\/td><td>28.04<\/td><\/tr><tr><td><strong>Total Income<\/strong><\/td><td>86.25<\/td><td>133.37<\/td><td>101.36<\/td><td>35.98<\/td><\/tr><tr><td><strong>Profit After Tax<\/strong><\/td><td>13.19<\/td><td>15.61<\/td><td>8.45<\/td><td>2.56<\/td><\/tr><tr><td><strong>EBITDA<\/strong><\/td><td>20.89<\/td><td>23.85<\/td><td>12.14<\/td><td>3.47<\/td><\/tr><tr><td><strong>Net Worth<\/strong><\/td><td>46.41<\/td><td>33.23<\/td><td>12.51<\/td><td>2.57<\/td><\/tr><tr><td><strong>Reserves and Surplus<\/strong><\/td><td>31.09<\/td><td>33.21<\/td><td>12.50<\/td><td>2.56<\/td><\/tr><tr><td><strong>Total Borrowings<\/strong><\/td><td>37.52<\/td><td>37.23<\/td><td>25.68<\/td><td>8.42<\/td><\/tr><\/tbody><\/table><\/figure><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Explanation\"><\/span><strong>Explanation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Tipco Engineering Limited&#8217;s revenue increased by 26%, from \u20b9101.36 crore in March 2024 to \u20b915.61 crore in March 2025. Moreover, the company&#8217;s PAT increased by 8% from \u20b98.45 crore in March 2024 to \u20b915.61 crore in March 2025.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Technical_Indicators\"><\/span><strong>Technical Indicators<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Several technical indicators are available to assess a company&#8217;s potential to deliver returns. Use the parameters mentioned below to analyse the technical aspects of the <strong>Tipco Engineering IPO.<\/strong><\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Key Indicators<\/strong><\/td><td><strong>Value<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/price-to-earnings-ratio-p-e-ratio\"><strong>PE Ratio (Price-to-Earnings)<\/strong><\/a><strong>&nbsp;<\/strong><\/td><td>8.73<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/earnings-per-share-eps-formula\"><strong>EPS (Earnings Per Share)<\/strong><\/a><\/td><td>10.19<\/td><\/tr><tr><td><strong>RoNW<\/strong><\/td><td>28.41%<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/return-on-capital-employed\"><strong>ROCE<\/strong><\/a><\/td><td>24.76%<\/td><\/tr><tr><td><strong>ROE<\/strong><\/td><td>33.12%<\/td><\/tr><tr><td><strong>EBITDA Margin<\/strong><\/td><td>15.35%<\/td><\/tr><tr><td><strong>Price to Book Value<\/strong><\/td><td>4.10<\/td><\/tr><tr><td><strong>Market Capitalisation<\/strong><\/td><td>\u20b9184.83<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tipco_Engineering_IPO_Listing_Expectations\"><\/span><strong>Tipco Engineering IPO Listing Expectations<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Tipco Engineering IPO Highlights: IPO allotment is still pending, as the bid will close today. However, given the current GMP or market sentiment, it is reasonable to expect higher listing gains for the share. A flat 0% in Tipco Engineering, Highlight GMP suggests the estimated listing price per share will be around Rs. 89.<\/p><p>It will provide higher listing gains to investors who applied for this IPO. Also, the financial fundamentals of this business made it the experts\u2019 top long-term recommendation.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tipco_Engineering_IPO_Dates\"><\/span><strong>Tipco Engineering IPO Dates<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>23rd March 2026<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>25th March 2026<\/td><\/tr><tr><td><strong>Allotment<\/strong><\/td><td>27th March 2026<\/td><\/tr><tr><td><strong>Refund Date<\/strong><\/td><td>30th March 2026<\/td><\/tr><tr><td><strong>IPO Listing Date<\/strong><\/td><td>1st April 2026<\/td><\/tr><\/tbody><\/table><\/figure><p><strong>Note<\/strong>: IPO GMP is volatile and depends on market sentiment. Hence, one should conduct their research before investing in it.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Recent_Articles\"><\/span><strong>Recent Articles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><a href=\"https:\/\/univest.in\/blogs\/central-mine-planning-and-design-institute-ipo-gmp-day-2\"><strong>Central Mine Planning &amp; Design Institute IPO GMP Day 2<\/strong><\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/speciality-medicines-ipo-gmp-day-2\"><strong>Speciality Medicines GMP Day 2<\/strong><\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/innovision-ipo-listing-today\"><strong>Innovision IPO Listing Today<\/strong><\/a><\/p><p><a href=\"http:\/\/univest.in\/blogs\/novus-loyalty-ipo-gmp-day-3;\"><strong>Novus Loyalty IPO GMP Day 3<\/strong><\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/novus-loyalty-ipo-subscription-status-day-3\"><strong>Novus Loyalty IPO Subscription Status Day 3<\/strong><\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/rajputana-stainless-ipo-listing-preview\"><strong>Rajputana Stainless IPO Listing Preview<\/strong><\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/innovision-ipo-listing-preview\"><strong>Innovision IPO Listing Preview<\/strong><\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/central-mine-planning-and-design-institute-ipo-gmp-day-1\"><strong>Central Mine Planning &amp; Design Institute IPO GMP Day 1<\/strong><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Here, the Tipco Engineering IPO launched on 23rd March 2026. Bidding for the issue will close today, 25th March 2026. The primary aim of the Tipco Engineering IPO is to raise \u20b960.55 crores from the market. Also, the Tipco Engineering IPO has received an impressive level of subscription, indicating that the shares will be listed<\/p>\n","protected":false},"author":27,"featured_media":64998,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1281],"tags":[1015,3806],"class_list":["post-64996","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-ipo","tag-ipo-subscription"],"metadata":{"_edit_lock":["1774253346:28"],"_last_editor_used_jetpack":["block-editor"],"rank_math_internal_links_processed":["1"],"amazonS3_cache":["a:4:{s:85:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/03\/Tipco-Engineering-India-IPO-GMP-1.jpg\";a:2:{s:2:\"id\";i:64997;s:11:\"source_type\";s:13:\"media-library\";}s:94:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/03\/Tipco-Engineering-India-IPO-GMP-1-1024x536.jpg\";a:2:{s:2:\"id\";i:64997;s:11:\"source_type\";s:13:\"media-library\";}s:117:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1.jpg\";a:2:{s:2:\"id\";i:64997;s:11:\"source_type\";s:13:\"media-library\";}s:126:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133422\/Tipco-Engineering-India-IPO-GMP-1-1024x536.jpg\";a:2:{s:2:\"id\";i:64997;s:11:\"source_type\";s:13:\"media-library\";}}"],"rank_math_seo_score":["64"],"rank_math_primary_category":["1281"],"rank_math_description":["Check the Tipco Engineering IPO subscription status day 2 online and also get live GMP details and reviews to anticipate the listing gains. Read More!"],"rank_math_title":["Tipco Engineering IPO Subscription Status Day 2: Check Online"],"rank_math_focus_keyword":["Tipco Engineering IPO Subscription Status Day 2"],"rank_math_robots":["a:2:{i:0;s:8:\"nofollow\";i:1;s:7:\"noindex\";}"],"_thumbnail_id":["64998"],"_edit_last":["28"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/23133608\/Tipco-Engineering-Subscription-Day-2.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/64996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=64996"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/64996\/revisions"}],"predecessor-version":[{"id":64999,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/64996\/revisions\/64999"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/64998"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=64996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=64996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=64996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}