{"id":63212,"date":"2026-03-09T10:16:36","date_gmt":"2026-03-09T04:46:36","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=63212"},"modified":"2026-03-09T10:18:06","modified_gmt":"2026-03-09T04:48:06","slug":"srinibas-pradhan-constructions-ipo-subscription-day-2","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/","title":{"rendered":"Srinibas Pradhan Constructions IPO Subscription Day 2"},"content":{"rendered":"<p>Here, the Srinibas Pradhan Constructions IPO launched on 6th March 2026. Bidding for the issue will close today, 10th March 2026. The primary aim of the <strong>Srinibas Pradhan Constructions IPO<\/strong> is to raise \u20b920.32 crores from the market. Also, the Srinibas Pradhan Constructions IPO has received an impressive level of subscription, indicating that the shares will be listed at an impeccable premium. Scroll down to check the Srinibas Pradhan Constructions IPO subscription and details.&nbsp;<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Srinibas_Pradhan_Constructions_IPO_Details\" title=\"Srinibas Pradhan Constructions IPO Details&nbsp;\">Srinibas Pradhan Constructions IPO Details&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Srinibas_Pradhan_Constructions_IPO_Subscription_Status\" title=\"Srinibas Pradhan Constructions IPO Subscription Status\">Srinibas Pradhan Constructions IPO Subscription Status<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Srinibas_Pradhan_Constructions_IPO_GMP_Today\" title=\"Srinibas Pradhan Constructions IPO GMP Today\">Srinibas Pradhan Constructions IPO GMP Today<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#About_Srinibas_Pradhan_Constructions_Ltd\" title=\"About Srinibas Pradhan Constructions Ltd.\">About Srinibas Pradhan Constructions Ltd.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Srinibas_Pradhan_Construction_Limited_Financials\" title=\"Srinibas Pradhan Construction Limited Financials\">Srinibas Pradhan Construction Limited Financials<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Explanation\" title=\"Explanation\">Explanation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Technical_Indicators\" title=\"Technical Indicators\">Technical Indicators<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Srinibas_Pradhan_Constructions_IPO_Listing_Expectations\" title=\"Srinibas Pradhan Constructions IPO Listing Expectations\">Srinibas Pradhan Constructions IPO Listing Expectations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Srinibas_Pradhan_Constructions_IPO_Dates\" title=\"Srinibas Pradhan Constructions IPO Dates\">Srinibas Pradhan Constructions IPO Dates<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/srinibas-pradhan-constructions-ipo-subscription-day-2\/#Recent_Articles\" title=\"Recent Articles\">Recent Articles<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Srinibas_Pradhan_Constructions_IPO_Details\"><\/span><strong>Srinibas Pradhan Constructions IPO Details&nbsp;<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>6th March 2026<\/td><\/tr><tr><td><strong>Face Value&nbsp;<\/strong><\/td><td>\u20b910 per share<\/td><\/tr><tr><td><strong>Price Band<\/strong><\/td><td>\u20b991 to \u20b998<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>1,200 shares<\/td><\/tr><tr><td><strong>Issue Type<\/strong><\/td><td>Bookbuilding IPO<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td>NSE &amp; SME<\/td><\/tr><tr><td><strong>IPO Close Date&nbsp;<\/strong><\/td><td>10th March 2026<\/td><\/tr><tr><td><strong>Listing Date&nbsp;<\/strong><\/td><td>13th March 2026<\/td><\/tr><\/tbody><\/table><\/figure><p>The price band for Srinibas Pradhan Constructions IPO has been set at \u20b991 to \u20b998 per share, and a total of 20,73,600 shares are being issued. Let&#8217;s segregate the share quota fixed for different categories of investors.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Investor Categories<\/strong><\/td><td><strong>Shares Offered&nbsp;<\/strong><\/td><td><strong>Shares Percentage<\/strong><\/td><\/tr><tr><td><strong>Market Maker Shares Offered<\/strong><\/td><td>1,04,00<\/td><td>5.03%<\/td><\/tr><tr><td><strong>QIB Shares Offered<\/strong><\/td><td>19,200<\/td><td>0.93%<\/td><\/tr><tr><td><strong>NII (HNI) Shares Offered<\/strong><\/td><td>9,75,600<\/td><td>47.05%<\/td><\/tr><tr><td><strong>Retail Shares Offered<\/strong><\/td><td>9,74,400<\/td><td>46.99%<\/td><\/tr><tr><td><strong>Total Shares Offered&nbsp;<\/strong><\/td><td>20,73,600<\/td><td>100.00%<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Srinibas_Pradhan_Constructions_IPO_Subscription_Status\"><\/span><strong>Srinibas Pradhan Constructions IPO Subscription Status<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>As of now, the Srinibas Pradhan Constructions IPO has been subscribed to 0.09 times. Of these, 0.14 times are subscribed by retail investors, 0.03 times by non-institutional investors, and 0.00 times by QII (Qualified Institutional Investors).&nbsp;&nbsp;<\/p><p>The healthy subscription status indicates that investors are expecting higher returns at the time of Srinibas Pradhan Constructions&#8217;s IPO listing on 13th March 2026. Srinibas Pradhan Constructions also has a positive outlook behind the fresh issue of 0.17 crore shares, which will raise around Rs 20.32 crores.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Srinibas_Pradhan_Constructions_IPO_GMP_Today\"><\/span><strong>Srinibas Pradhan Constructions IPO GMP Today<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1-1024x536.jpg\" alt=\"Srinibas Pradhan Constructions IPO GMP\" class=\"wp-image-63215\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1-1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1-300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1-768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1-900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1-600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1-150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>We know that higher subscription levels drive grey-market premiums for IPOs. Let\u2019s explore the Srinibas Pradhan Constructions IPO GMP for 9th March 2026.&nbsp;<\/p><p>The grey market premium for this IPO falls at 0.00, or Rs 0.00 per share. It indicates that the estimated listing price per share is Rs 98. Numerous factors played a pivotal role in this jump in the GMP of Srinibas Pradhan Constructions IPO. These include higher subscription rates, favourable market sentiment, and investors&#8217; positive attitude towards IPOs.<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>GMP DATE<\/strong><\/td><td><strong>IPO Price<\/strong><\/td><td><strong>GMP Price<\/strong><\/td><td><strong>Estimated Listing Price<\/strong><\/td><td><strong>Estimated Gain<\/strong><\/td><\/tr><tr><td><strong>9-3-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>8-3-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>7-3-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>6-3-3036<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>5-3-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>4-3-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>3-3-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>2-3-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>1-3-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>28-2-2026<\/strong><\/td><td>\u20b998.00<\/td><td>\u20b90.00<\/td><td>\u20b998.00<\/td><td>0.00%<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"About_Srinibas_Pradhan_Constructions_Ltd\"><\/span><strong>About Srinibas Pradhan Constructions Ltd.<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Srinibas Pradhan Constructions Limited (SPCL) operates in the infrastructure and utilities sector, specializing in the execution of projects related to roads, highways, bridges, electricity infrastructure, and mining infrastructure.SPCL participates in competitive bidding processes for infrastructure projects across the state of Odisha, catering to state government departments, central and state public sector undertakings, as well as private corporate clients.<\/p><p>The company&#8217;s project portfolio covers roads, bridges, irrigation and canal works, civil construction, and industrial development.<\/p><ul class=\"wp-block-list\"><li>Established Reputation<\/li>\n\n<li>Experienced Workforce<\/li>\n\n<li>Strong Backward Integration<\/li>\n\n<li>Diverse Portfolio<\/li><\/ul><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Srinibas_Pradhan_Construction_Limited_Financials\"><\/span><strong>Srinibas Pradhan Construction Limited Financials<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>The company&#8217;s financial analysis is essential before applying for the<strong> Srinibas Pradhan Construction IPO. <\/strong>See the table for Srinibas Pradhan Construction Limited&#8217;s financials.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Year Ended<\/strong><\/td><td><strong>31st Dec 2025 (in cr.)<\/strong><\/td><td><strong>31st March 2025 (in cr.)<\/strong><\/td><td><strong>31st March 2024 (in cr.)<\/strong><\/td><td><strong>31 Mar 2023 (in cr.)<\/strong><\/td><\/tr><tr><td><strong>Assets<\/strong><\/td><td>56.67<\/td><td>55.76<\/td><td>20.83<\/td><td>6.50<\/td><\/tr><tr><td><strong>Total Income<\/strong><\/td><td>45.63<\/td><td>89.73<\/td><td>35.27<\/td><td>26.35<\/td><\/tr><tr><td><strong>Profit After Tax<\/strong><\/td><td>4.11<\/td><td>6.59<\/td><td>3.55<\/td><td>1.48<\/td><\/tr><tr><td><strong>EBITDA<\/strong><\/td><td>7.64<\/td><td>13.01<\/td><td>5.58<\/td><td>2.15<\/td><\/tr><tr><td><strong>Net Worth<\/strong><\/td><td>22.01<\/td><td>15.91<\/td><td>7.72<\/td><td>2.67<\/td><\/tr><tr><td><strong>Reserves and Surplus<\/strong><\/td><td>15.87<\/td><td>11.55<\/td><td>3.57<\/td><td>2.57<\/td><\/tr><tr><td><strong>Total Borrowings<\/strong><\/td><td>17.17<\/td><td>17.25<\/td><td>1.88<\/td><td>0.06<\/td><\/tr><\/tbody><\/table><\/figure><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Explanation\"><\/span><strong>Explanation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Srinibas Pradhan Construction Limited&#8217;s revenue increased by 35% from \u20b935.27 crores in March 2024 to \u20b989.73 crores in March 2025. Moreover, the company&#8217;s PAT increased by 12% from \u20b93.55 crore in March 2024 to \u20b96.59 crore in March 2025.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Technical_Indicators\"><\/span><strong>Technical Indicators<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Several technical indicators are available to assess a company&#8217;s potential to deliver returns. Use the parameters mentioned below to analyse the technical aspects of the <strong>Srinibas Pradhan Constructions IPO.<\/strong><\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Key Indicators<\/strong><\/td><td><strong>Value<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/price-to-earnings-ratio-p-e-ratio\"><strong>PE Ratio (Price-to-Earnings)<\/strong><\/a><strong>&nbsp;<\/strong><\/td><td>9.15<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/earnings-per-share-eps-formula\"><strong>EPS (Earnings Per Share)<\/strong><\/a><\/td><td>10.71<\/td><\/tr><tr><td><strong>RoNW<\/strong><\/td><td>21.67%<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/return-on-capital-employed\"><strong>ROCE<\/strong><\/a><\/td><td>29.79%<\/td><\/tr><tr><td><strong>ROE<\/strong><\/td><td>21.67%<\/td><\/tr><tr><td><strong>EBITDA Margin<\/strong><\/td><td>16.76%<\/td><\/tr><tr><td><strong>Price to Book Value<\/strong><\/td><td>&#8211;<\/td><\/tr><tr><td><strong>Market Capitalisation<\/strong><\/td><td>\u20b977.04 Cr.<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Srinibas_Pradhan_Constructions_IPO_Listing_Expectations\"><\/span><strong>Srinibas Pradhan Constructions IPO Listing Expectations<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Srinibas Pradhan Constructions IPO Highlights: IPO allotment is still pending, as the bid will close today. However, given the current GMP or market sentiment, it is reasonable to expect higher listing gains for the share. A flat of 0.00% in Srinibas Pradhan Constructions Highlight GMP suggests the estimated listing price per share will be around Rs. 98.<\/p><p>It will provide higher listing gains to investors who applied for this IPO. Also, the financial fundamentals of this business made it the experts\u2019 top long-term recommendation.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Srinibas_Pradhan_Constructions_IPO_Dates\"><\/span><strong>Srinibas Pradhan Constructions IPO Dates<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>6th March 2026<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>10th March 2026<\/td><\/tr><tr><td><strong>Allotment<\/strong><\/td><td>11th March 2026<\/td><\/tr><tr><td><strong>Refund Date<\/strong><\/td><td>12th March 2026<\/td><\/tr><tr><td><strong>IPO Listing Date<\/strong><\/td><td>13th March 2026<\/td><\/tr><\/tbody><\/table><\/figure><p><strong>Note<\/strong>: IPO GMP is volatile and depends on market sentiment. Hence, one should conduct their research before investing in it.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Recent_Articles\"><\/span><strong>Recent Articles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><a href=\"https:\/\/univest.in\/blogs\/innovision-ipo-review\">Innovision IPO<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/acetech-e-commerce-ipo-listing-preview\">Acetech E-Commerce IPO Listing Preview<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/sedemac-mechatronics-ipo-allotment-status\">SEDEMAC Mechatronics IPO Allotment Status<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/striders-impex-ipo-listing\">Striders Impex IPO Listing Today<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/sedemac-mechatronics-ipo-gmp-day3-falls\">SEDEMAC Mechatronics IPO Subscription Status Day 3<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/srinibas-pradhan-construction-ipo-gmp-day-1-flat\">Srinibas Pradhan Constructions IPO GMP Day 1<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Here, the Srinibas Pradhan Constructions IPO launched on 6th March 2026. Bidding for the issue will close today, 10th March 2026. The primary aim of the Srinibas Pradhan Constructions IPO is to raise \u20b920.32 crores from the market. Also, the Srinibas Pradhan Constructions IPO has received an impressive level of subscription, indicating that the shares<\/p>\n","protected":false},"author":27,"featured_media":63213,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1281],"tags":[1015,3806],"class_list":["post-63212","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-ipo","tag-ipo-subscription"],"metadata":{"_edit_lock":["1773031936:28"],"_last_editor_used_jetpack":["block-editor"],"rank_math_internal_links_processed":["1"],"rank_math_primary_category":["1281"],"rank_math_seo_score":["69"],"rank_math_description":["Check the Srinibas Pradhan Constructions IPO subscription status online and also get live GMP details and reviews to anticipate the listing gains. Explore Now"],"rank_math_title":["Srinibas Pradhan Constructions IPO Subscription Status Day 2: Check Online"],"rank_math_focus_keyword":["Srinibas Pradhan Constructions IPO Subscription"],"rank_math_robots":["a:2:{i:0;s:8:\"nofollow\";i:1;s:7:\"noindex\";}"],"_thumbnail_id":["63213"],"_edit_last":["28"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["6710"],"amazonS3_cache":["a:4:{s:92:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/03\/Srinibas-Pradhan-Constructions-IPO-GMP-1.jpg\";a:2:{s:2:\"id\";i:63215;s:11:\"source_type\";s:13:\"media-library\";}s:101:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/03\/Srinibas-Pradhan-Constructions-IPO-GMP-1-1024x536.jpg\";a:2:{s:2:\"id\";i:63215;s:11:\"source_type\";s:13:\"media-library\";}s:124:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1.jpg\";a:2:{s:2:\"id\";i:63215;s:11:\"source_type\";s:13:\"media-library\";}s:133:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101708\/Srinibas-Pradhan-Constructions-IPO-GMP-1-1024x536.jpg\";a:2:{s:2:\"id\";i:63215;s:11:\"source_type\";s:13:\"media-library\";}}"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2026\/03\/09101448\/Srinibas-Pradhan-Constructions-IPO-Subscription-Status-Day-2.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/63212","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=63212"}],"version-history":[{"count":2,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/63212\/revisions"}],"predecessor-version":[{"id":63216,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/63212\/revisions\/63216"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/63213"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=63212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=63212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=63212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}