{"id":54690,"date":"2025-11-17T12:20:30","date_gmt":"2025-11-17T06:50:30","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=54690"},"modified":"2025-11-17T12:21:17","modified_gmt":"2025-11-17T06:51:17","slug":"fujiyama-power-systems-ipo-allotment","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/","title":{"rendered":"Fujiyama Power Systems IPO Allotment Status | Check Online"},"content":{"rendered":"<p><a href=\"https:\/\/univest.in\/user\/log-in\"><strong><em>Check Expert\u2019s Verdicts on Fujiyama Power Systems IPO<\/em><\/strong><\/a><strong><em>&nbsp;<\/em><\/strong><\/p><p>Following a strong investor response, the bidding period for the Fujiyama Power Systems IPO has finally come to a close. It has received a total of 0.51 subscriptions. The public issue was subscribed to 0.46 times by individual investors, 0.82 times by QIBs, and 0.21 times by NII. The allotment was scheduled for 17th November 2025. Check your <strong>Fujiyama Power Systems IPO allotment status<\/strong> online.&nbsp;<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/#Fujiyama_Power_Systems_IPO_Allotment_Status\" title=\"Fujiyama Power Systems IPO Allotment Status\">Fujiyama Power Systems IPO Allotment Status<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/#Check_Allotment_Status_On_the_Registrar_Portal\" title=\"Check Allotment Status On the Registrar Portal\">Check Allotment Status On the Registrar Portal<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/#Check_Allotment_Status_On_NSE\" title=\"Check Allotment Status On NSE\">Check Allotment Status On NSE<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/#IPO_Details\" title=\"IPO Details\">IPO Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/#Fujiyama_Power_Systems_IPO_Share_Reservation\" title=\"Fujiyama Power Systems IPO Share Reservation\">Fujiyama Power Systems IPO Share Reservation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/#Fujiyama_Power_Systems_IPO_Grey_Market_Premium\" title=\"Fujiyama Power Systems IPO Grey Market Premium\">Fujiyama Power Systems IPO Grey Market Premium<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/#Fujiyama_Power_Systems_IPO_Timeline\" title=\"Fujiyama Power Systems IPO Timeline\">Fujiyama Power Systems IPO Timeline<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/fujiyama-power-systems-ipo-allotment\/#Recent_Articles\" title=\"Recent Articles\">Recent Articles<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Fujiyama_Power_Systems_IPO_Allotment_Status\"><\/span><strong>Fujiyama Power Systems IPO Allotment Status<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>The allotment status of Fujiyama Power System is to be made public. The company has credited the shares to the allottees\u2019 demat accounts. MUFG Intime Limited, the registrar of the Fujiyama Power Systems IPO, has finalised the basis of allotment and is eligible to list under the T+3 rule. The public issue will be listed within 3 days of the subscription ending.&nbsp;<\/p><p>Investors can now check the Fujiyama Power Systems IPO allotment status on the official websites of the BSE and the NSE Exchange, as well as on the registrar&#8217;s portal.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Check_Allotment_Status_On_the_Registrar_Portal\"><\/span><strong>Check Allotment Status On the Registrar Portal<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Individuals can visit the official portal of MUFG Intime Limited to check their allotment status. Follow the steps below to check your allotment status on the registrar portal.&nbsp;<\/p><p><strong>Step 1<\/strong>: Visit the <a href=\"https:\/\/linkintime.co.in\/Initial_Offer\/public-issues.html\" rel=\"nofollow noopener\" target=\"_blank\">registrar\u2019s website.<\/a><\/p><p><strong>Step 2<\/strong>: Select Fujiyama Power Systems IPO from the menu.&nbsp;<\/p><p><strong>Step 3<\/strong>: Select the option to check the allotment status using your application number, Demat account\/PAN.&nbsp;<\/p><p><strong>Step 4<\/strong>: Complete the required details to proceed.&nbsp;<\/p><p><strong>Step 5<\/strong>: Enter the CAPTCHA and click the Submit button.&nbsp;<\/p><p>The Fujiyama Power Systems IPO allotment status will be displayed on your screen.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Check_Allotment_Status_On_NSE\"><\/span><strong>Check Allotment Status On NSE<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Follow the steps outlined below to check the Fujiyama Power Systems IPO allotment status on the official website of the Bombay Stock Exchange.<\/p><p><strong>Step 1<\/strong>: Visit the <a href=\"https:\/\/www.nseindia.com\/\" rel=\"nofollow noopener\" target=\"_blank\">NSE Official Website.<\/a><\/p><p><strong>Step 2<\/strong>: Select &#8216;Equity&#8217; as the Issue Type to proceed.&nbsp;<\/p><p><strong>Step 3<\/strong>: Scroll down through the issue names and select Fujiyama Power Systems IPO.<\/p><p><strong>Step 4<\/strong>: Select the mode from the application (no or PAN).&nbsp;<\/p><p><strong>Step 5<\/strong>: Submit your information.<\/p><p>The Fujiyama Power Systems IPO allotment status will be displayed on your screen.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"IPO_Details\"><\/span><strong>IPO Details<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>13th November 2025<\/td><\/tr><tr><td><strong>Face Value&nbsp;<\/strong><\/td><td>\u20b91 per share<\/td><\/tr><tr><td><strong>Price Band<\/strong><\/td><td>\u20b9216 to \u20b9228 per share<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>65 shares<\/td><\/tr><tr><td><strong>Issue Type<\/strong><\/td><td>Bookbuilding IPO<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td>BSE &amp; NSE<\/td><\/tr><tr><td><strong>IPO Close Date&nbsp;<\/strong><\/td><td>17th November 2025<\/td><\/tr><tr><td><strong>Listing Date&nbsp;<\/strong><\/td><td>20th November 2025<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Fujiyama_Power_Systems_IPO_Share_Reservation\"><\/span><strong>Fujiyama Power Systems IPO Share Reservation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><strong>The Fujiyama Power Systems IPO<\/strong> is a book-building IPO of \u20b9828.00 crore, comprising a fresh issue of 2.63 crore shares. Will be listed on the BSE and NSE Exchanges. Furthermore, SEBI has specified the share reservation criteria for different investor categories.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Categories<\/strong><\/td><td><strong>Shares Offered<\/strong><\/td><td><strong>% Shares Offered<\/strong><\/td><\/tr><tr><td><strong>QIB Shares Offered<\/strong><\/td><td>1,80,48,245<\/td><td>49.10%<\/td><\/tr><tr><td><strong>NII (HNI) Shares Offered<\/strong><\/td><td>54,14,474<\/td><td>14.91%<\/td><\/tr><tr><td><strong>Retail Investors<\/strong><\/td><td>1,26,33,772<\/td><td>34.79%<\/td><\/tr><tr><td><strong>Employee Shares Offered<\/strong><\/td><td>2,19,298<\/td><td>0.60%<\/td><\/tr><tr><td><strong>Total Shares Offered<\/strong><\/td><td>3,63,15,789<\/td><td>100.00%<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Fujiyama_Power_Systems_IPO_Grey_Market_Premium\"><\/span><strong>Fujiyama Power Systems IPO Grey Market Premium<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5-1024x536.jpg\" alt=\"Fujiyama Power Systems IPO Allotment Status\" class=\"wp-image-54695\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5-1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5-300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5-768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5-900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5-600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5-150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>As of 17th November 2025, the <strong>GMP for the Fujiyama Power Systems IPO <\/strong>stands at \u20b90.00 per share. Thus, the estimated listing price would be \u20b9228.00. This indicates that the estimated listing gain in this IPO could be 0.00%. However, GMP details are subject to change based on market conditions and fluctuations. Explore the table for GMP updates on the Fujiyama Power Systems IPO.<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>GMP Date<\/strong><\/td><td><strong>IPO Price<\/strong><\/td><td><strong>GMP<\/strong><\/td><td><strong>Estimated Listing Price&nbsp;<\/strong><\/td><td><strong>Estimated Listing Gains<\/strong><\/td><\/tr><tr><td><strong>17-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>16-11-2015<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>15-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>14-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>13-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>12-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>11-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>10-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>9-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>8-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>7-11-2025<\/strong><\/td><td>\u20b9228.00<\/td><td>\u20b90.00<\/td><td>\u20b9228.00<\/td><td>0.00%<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Fujiyama_Power_Systems_IPO_Timeline\"><\/span><strong>Fujiyama Power Systems IPO Timeline<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>14th November 2025<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>17th November 2025<\/td><\/tr><tr><td><strong>Allotment<\/strong><\/td><td>17th November 2025<\/td><\/tr><tr><td><strong>Refund Date<\/strong><\/td><td>18th November 2025<\/td><\/tr><tr><td><strong>IPO Listing Date<\/strong><\/td><td>20th November 2025<\/td><\/tr><\/tbody><\/table><\/figure><p><strong>Note<\/strong>: For any queries, please contact MUFG Intime Limited at <a href=\"mailto:ipo.helpdesk@linkintime.co.in\">ipo.helpdesk@linkintime.com<\/a> or 04067162222, 04079611000.<\/p><p><strong><em>Download the <\/em><\/strong><a href=\"http:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\"><strong><em>Univest iOS App<\/em><\/strong><\/a><strong><em> or the <\/em><\/strong><a href=\"http:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&amp;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\"><strong><em>Univest Android App<\/em><\/strong><\/a><strong><em> to get daily stock recommendations and insightful research pieces!<\/em><\/strong><\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Recent_Articles\"><\/span><strong>Recent Articles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><a href=\"https:\/\/univest.in\/blogs\/top-100-penny-stocks-to-buy-now\">Top 100 Penny Stocks | Penny Stocks to Buy Now in 2025<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/top-10-penny-stocks-in-india\">Top 10 Penny Stocks in India&nbsp; | Penny Stocks to Buy in 2025<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/best-stocks-to-buy-today-6\">Best Stocks to Buy Today: Explore Best Stocks With Expected Trends<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/milky-mist-dairy-foods-ipo-details\">Milky Mist Dairy Foods IPO Details: Everything You Should Know about<\/a>&nbsp;<\/p><p><a href=\"https:\/\/univest.in\/blogs\/karbonsteel-engineering-ipo-gmp-review\">Karbonsteel Engineering IPO GMP &amp; Review: Should You Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/taurian-mps-ipo-gmp-review\">Taurian MPS IPO GMP &amp; Review: Should You Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/shringar-house-of-mangalsutra-ipo-gmp-review\">Shringar House of Mangalsutra IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/dev-accelerator-ipo-gmp-review\">Dev Accelerator IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/vigor-plast-india-ipo-listing-preview\">Vigor Plast India IPO Listing Preview: What to Expect Now?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/krupalu-metals-ipo-gmp-live-updates-2\">Krupalu Metals IPO GMP: Day 3 IPO Live Updates<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Check Expert\u2019s Verdicts on Fujiyama Power Systems IPO&nbsp; Following a strong investor response, the bidding period for the Fujiyama Power Systems IPO has finally come to a close. It has received a total of 0.51 subscriptions. The public issue was subscribed to 0.46 times by individual investors, 0.82 times by QIBs, and 0.21 times by<\/p>\n","protected":false},"author":23,"featured_media":54691,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1281],"tags":[3387],"class_list":["post-54690","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-fujiyama-power-systems-ipo-allotment"],"metadata":{"_edit_lock":["1763362277:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_internal_links_processed":["1"],"amazonS3_cache":["a:12:{s:86:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/11\/Fujiyama-Power-Systems-IPO-IPO-GMP.jpg\";a:2:{s:2:\"id\";i:54692;s:11:\"source_type\";s:13:\"media-library\";}s:95:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/11\/Fujiyama-Power-Systems-IPO-IPO-GMP-1024x536.jpg\";a:2:{s:2:\"id\";i:54692;s:11:\"source_type\";s:13:\"media-library\";}s:118:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17115205\/Fujiyama-Power-Systems-IPO-IPO-GMP.jpg\";a:2:{s:2:\"id\";i:54692;s:11:\"source_type\";s:13:\"media-library\";}s:127:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17115205\/Fujiyama-Power-Systems-IPO-IPO-GMP-1024x536.jpg\";a:2:{s:2:\"id\";i:54692;s:11:\"source_type\";s:13:\"media-library\";}s:88:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/11\/Fujiyama-Power-Systems-IPO-IPO-GMP-1.jpg\";a:2:{s:2:\"id\";i:54694;s:11:\"source_type\";s:13:\"media-library\";}s:97:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/11\/Fujiyama-Power-Systems-IPO-IPO-GMP-1-1024x536.jpg\";a:2:{s:2:\"id\";i:54694;s:11:\"source_type\";s:13:\"media-library\";}s:120:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121821\/Fujiyama-Power-Systems-IPO-IPO-GMP-1.jpg\";a:2:{s:2:\"id\";i:54694;s:11:\"source_type\";s:13:\"media-library\";}s:129:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121821\/Fujiyama-Power-Systems-IPO-IPO-GMP-1-1024x536.jpg\";a:2:{s:2:\"id\";i:54694;s:11:\"source_type\";s:13:\"media-library\";}s:84:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/11\/Fujiyama-Power-Systems-IPO-GMP-5.jpg\";a:2:{s:2:\"id\";i:54695;s:11:\"source_type\";s:13:\"media-library\";}s:93:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/11\/Fujiyama-Power-Systems-IPO-GMP-5-1024x536.jpg\";a:2:{s:2:\"id\";i:54695;s:11:\"source_type\";s:13:\"media-library\";}s:116:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5.jpg\";a:2:{s:2:\"id\";i:54695;s:11:\"source_type\";s:13:\"media-library\";}s:125:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17121834\/Fujiyama-Power-Systems-IPO-GMP-5-1024x536.jpg\";a:2:{s:2:\"id\";i:54695;s:11:\"source_type\";s:13:\"media-library\";}}"],"rank_math_primary_category":["1281"],"rank_math_seo_score":["81"],"rank_math_title":["Check Fujiyama Power Systems IPO Allotment Status Online"],"rank_math_description":["Check your Fujiyama Power Systems IPO allotment status online, along with live GMP status. Learn more about the Fujiyama Power Systems IPO, including subscription details, timeline, and other key information. Read more to know everything. "],"rank_math_focus_keyword":["Fujiyama Power Systems IPO"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"_thumbnail_id":["54691"],"_edit_last":["23"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["4657"],"_wp_page_template":["default"],"rs_page_bg_color":[""],"rank_math_canonical_url":["https:\/\/univest.in\/blogs\/fujiyama-power-systems-ipo-allotment"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/11\/17115104\/Fujiyama-Power-Systems-IPO-Allotment-Status.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/54690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=54690"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/54690\/revisions"}],"predecessor-version":[{"id":54696,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/54690\/revisions\/54696"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/54691"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=54690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=54690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=54690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}