{"id":48483,"date":"2025-09-15T15:36:39","date_gmt":"2025-09-15T10:06:39","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=48483"},"modified":"2025-09-15T15:38:03","modified_gmt":"2025-09-15T10:08:03","slug":"sattva-engineering-construction-ipo-listing-preview","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-listing-preview\/","title":{"rendered":"Sattva Engineering Construction IPO Listing Preview: What to Expect Now?"},"content":{"rendered":"<p>The Sattva Engineering Construction IPO listing is scheduled for 3rd September 2025. The IPO was open for bidding from 26th August 2025 to 29th August 2025. It is a book-building IPO of \u20b935.38 crore, comprising a fresh issue of 0.47 crore shares. The issue will be listed on the NSE and SME on its tentative listing date, 3rd September. Scroll down to learn more about Sattva Engineering Construction IPO listing expectations.<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-listing-preview\/#Sattva_Engineering_Construction_IPO_Listing_Preview\" title=\"Sattva Engineering Construction IPO Listing Preview\">Sattva Engineering Construction IPO Listing Preview<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-listing-preview\/#Sattva_Engineering_Construction_IPO_GMP_Grey_Market_Premium\" title=\"Sattva Engineering Construction IPO GMP Grey Market Premium\">Sattva Engineering Construction IPO GMP Grey Market Premium<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-listing-preview\/#Sattva_Engineering_Construction_Limited_Financials\" title=\"Sattva Engineering Construction Limited Financials\">Sattva Engineering Construction Limited Financials<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-listing-preview\/#How_to_Check_Sattva_Engineering_Construction_IPO_Allotment_Status\" title=\"How to Check Sattva Engineering Construction IPO Allotment Status?\">How to Check Sattva Engineering Construction IPO Allotment Status?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-listing-preview\/#Check_On_BSE\" title=\"Check On BSE\">Check On BSE<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-listing-preview\/#Check_On_the_Registrar_Portal\" title=\"Check On the Registrar Portal\">Check On the Registrar Portal<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_IPO_Listing_Preview\"><\/span><strong>Sattva Engineering Construction IPO Listing Preview<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>According to recent updates, the IPO listing of Sattva Engineering Construction is expected to be around \u20b9101 per share on 3rd September 2025. This conclusion is made based on the Sattva Engineering Construction IPO GMP (grey market premium). However, the GMP and expected listing price are subject to change based on market sentiment. Stay informed with Univest to receive live updates on the Current IPO listings or GMP trends. Scroll to explore the GMP of the Sattva Engineering Construction IPO.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_IPO_GMP_Grey_Market_Premium\"><\/span><strong>Sattva Engineering Construction IPO GMP Grey Market Premium<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>GMP is the gap between the price band of the issue and the price at which company shares are currently trading in the grey market. Do you want to receive live updates on the Sattva Engineering Construction <strong>IPO<\/strong>? If yes, then you\u2019ve reached the right spot. Check the table below to learn about the GMP trends.<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>GMP Date<\/strong><\/td><td><strong>IPO Price<\/strong><\/td><td><strong>GMP<\/strong><\/td><td><strong>Estimated Listing Price&nbsp;<\/strong><\/td><td><strong>Estimated Listing Gains<\/strong><\/td><\/tr><tr><td><strong>01-09-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b926.00<\/td><td>\u20b9101.00<\/td><td>34.67%<\/td><\/tr><tr><td><strong>31-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b926.00<\/td><td>\u20b9101.00<\/td><td>34.67%<\/td><\/tr><tr><td><strong>30-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b926.00<\/td><td>\u20b9101.00<\/td><td>34.67%<\/td><\/tr><tr><td><strong>29-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b918.00<\/td><td>\u20b993.00<\/td><td>24.00%<\/td><\/tr><tr><td><strong>28-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b919.00<\/td><td>\u20b994.00<\/td><td>25.33%<\/td><\/tr><tr><td><strong>27-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b919.00<\/td><td>\u20b994.00<\/td><td>25.33%<\/td><\/tr><tr><td><strong>26-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b919.00<\/td><td>\u20b994.00<\/td><td>25.33%<\/td><\/tr><tr><td><strong>25-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b917.00<\/td><td>\u20b992.00<\/td><td>22.67%<\/td><\/tr><tr><td><strong>24-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>23-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>22-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>21-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>20-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>19-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><\/tbody><\/table><\/figure><p>As of 1st September 2025, the<strong> Sattva Engineering Construction IPO GMP <\/strong>stands at \u20b926 per share. This means the share will likely list at \u20b9101 on its tentative Listing date, 3rd September 2025.<\/p><p>GMP data is subject to change based on market conditions. Please verify the live GMP status before applying for the Sattva Engineering Construction GMP. Stay informed with Univest to know about real-time information on IPOs and their GMP trends.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_Limited_Financials\"><\/span><strong>Sattva Engineering Construction Limited Financials<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2-1024x536.jpg\" alt=\"\" class=\"wp-image-48485\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2-1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2-300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2-768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2-900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2-600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2-150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>The company&#8217;s financial analysis is essential before applying for the<strong> Sattva Engineering Construction IPO. <\/strong>Look at the table to learn about Sattva Engineering Construction Limited&#8217;s financials.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Year Ended<\/strong><\/td><td><strong>31st March 2025 (in cr.)<\/strong><\/td><td><strong>31st March<\/strong><strong>2024 (in Cr)<\/strong><\/td><td><strong>31st March 2025 (in Cr)<\/strong><\/td><\/tr><tr><td><strong>Assets<\/strong><\/td><td>114.82<\/td><td>87.48<\/td><td>83.38<\/td><\/tr><tr><td><strong>Revenue<\/strong><\/td><td>94.85<\/td><td>77.44<\/td><td>83.93<\/td><\/tr><tr><td><strong>Profit After Tax<\/strong><\/td><td>9.14<\/td><td>4.56<\/td><td>1.04<\/td><\/tr><tr><td><strong>EBITDA<\/strong><\/td><td>18.56<\/td><td>11.72<\/td><td>7.28<\/td><\/tr><tr><td><strong>Net Worth<\/strong><\/td><td>43.42<\/td><td>24.03<\/td><td>19.47<\/td><\/tr><tr><td><strong>Reserve and surplus<\/strong><\/td><td>30.67<\/td><td>23.03<\/td><td>18.47<\/td><\/tr><tr><td><strong>Total Borrowing<\/strong><\/td><td>36.17<\/td><td>32.20<\/td><td>32.24<\/td><\/tr><\/tbody><\/table><\/figure><p><strong>Explanation<\/strong><\/p><p><a href=\"https:\/\/sattvaengg.in\/\" rel=\"nofollow noopener\" target=\"_blank\">Sattva Engineering Construction Limited&#8217;s<\/a> revenue increased by 22% from \u20b977.44 crores in March 2024 to \u20b994.85 crores in March 2025. Moreover, the company&#8217;s PAT rose by 100% from \u20b94.56 crores to \u20b99.14 crores.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_to_Check_Sattva_Engineering_Construction_IPO_Allotment_Status\"><\/span><strong>How to Check Sattva Engineering Construction IPO Allotment Status?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>You can check whether the Sattva Engineering Construction IPO allotment has been completed in different ways. These include NSE and the registrar portal. Refer to the steps below to check your allotment status online.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Check_On_BSE\"><\/span><strong><\/strong><strong>Check On BSE<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><ul class=\"wp-block-list\"><li>Visit the <a href=\"https:\/\/www.nseindia.com\/\" rel=\"nofollow noopener\" target=\"_blank\"><strong>NSE Official Website<\/strong>.<\/a><\/li>\n\n<li>Navigate to the IPO Allotment Section.\u00a0<\/li>\n\n<li>Select Equity as the issue type.\u00a0<\/li>\n\n<li>Choose the <strong>Sattva Engineering Construction IPO.<\/strong>\u00a0\u00a0<\/li>\n\n<li>Choose whether to proceed with the PAN number or the application number.\u00a0<\/li>\n\n<li>Submit your details to get the allotment status online.\u00a0<\/li><\/ul><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Check_On_the_Registrar_Portal\"><\/span><strong><\/strong><strong>Check On the Registrar Portal<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><ul class=\"wp-block-list\"><li>Visit the <a href=\"https:\/\/ipo.bigshareonline.com\/IPO_Status.html\" rel=\"nofollow noopener\" target=\"_blank\"><strong>registrar portal<\/strong>.<\/a><\/li>\n\n<li>Click on the allotment option.<\/li>\n\n<li>Fill in the required details.<\/li>\n\n<li>Click on the submit button to know your<strong> Sattva Engineering Construction IPO<\/strong> allotment status.<\/li><\/ul><p><\/p>","protected":false},"excerpt":{"rendered":"<p>The Sattva Engineering Construction IPO listing is scheduled for 3rd September 2025. The IPO was open for bidding from 26th August 2025 to 29th August 2025. It is a book-building IPO of \u20b935.38 crore, comprising a fresh issue of 0.47 crore shares. The issue will be listed on the NSE and SME on its tentative<\/p>\n","protected":false},"author":23,"featured_media":48484,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1281],"tags":[2221],"class_list":["post-48483","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-sattva-engineering-construction-ipo-listing"],"metadata":{"_edit_lock":["1757930883:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_internal_links_processed":["1"],"amazonS3_cache":["a:4:{s:107:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/09\/Sattva-Engineering-Construction-Listing-Preview-image-2.jpg\";a:2:{s:2:\"id\";i:48485;s:11:\"source_type\";s:13:\"media-library\";}s:116:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/09\/Sattva-Engineering-Construction-Listing-Preview-image-2-1024x536.jpg\";a:2:{s:2:\"id\";i:48485;s:11:\"source_type\";s:13:\"media-library\";}s:139:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2.jpg\";a:2:{s:2:\"id\";i:48485;s:11:\"source_type\";s:13:\"media-library\";}s:148:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153243\/Sattva-Engineering-Construction-Listing-Preview-image-2-1024x536.jpg\";a:2:{s:2:\"id\";i:48485;s:11:\"source_type\";s:13:\"media-library\";}}"],"rank_math_seo_score":["73"],"rank_math_primary_category":["1281"],"rank_math_title":["Sattva Engineering Construction IPO Listing Preview: Expected Gains?"],"rank_math_description":["Check details on the Current Sattva Engineering Construction IPO listings, including previews and expectations. Here is what to expect from the listing on 3rd September 2025. Read more.\r\n"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"rank_math_focus_keyword":["Sattva Engineering Construction IPO"],"_thumbnail_id":["48484"],"_edit_last":["23"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["3156"],"_wp_page_template":["default"],"rs_page_bg_color":[""],"rank_math_canonical_url":["https:\/\/univest.in\/blogs\/sattva-engineering-construction-ipo-listing-preview"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/09\/15153048\/Sattva-Engineering-Construction-Listing-Preview-image-1.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/48483","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=48483"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/48483\/revisions"}],"predecessor-version":[{"id":48486,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/48483\/revisions\/48486"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/48484"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=48483"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=48483"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=48483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}