{"id":47518,"date":"2025-08-29T22:11:29","date_gmt":"2025-08-29T16:41:29","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=47518"},"modified":"2025-08-29T22:12:07","modified_gmt":"2025-08-29T16:42:07","slug":"sattva-engineering-construction-ipo-allotment-status","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/","title":{"rendered":"Sattva Engineering Construction IPO Allotment Status Check Online: GMP, Subscription, Price, and More"},"content":{"rendered":"<p>Following a strong response from investors, the bidding period for the Sattva Engineering Construction IPO has finally come to a close. It has received a total of 196.38 times subscriptions. The public issue was subscribed to 169.60 times by individual investors, 123.39 times by QIBs, and 350.91 times by NII. The allotment was set to be made on 1st September 2025. Check your <strong>Sattva Engineering Construction IPO allotment status<\/strong> online.&nbsp;<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/#Sattva_Engineering_Construction_IPO_Allotment_Status\" title=\"Sattva Engineering Construction IPO Allotment Status\">Sattva Engineering Construction IPO Allotment Status<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/#Check_Allotment_Status_On_the_Registrar_Portal\" title=\"Check Allotment Status On the Registrar Portal\">Check Allotment Status On the Registrar Portal<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/#Check_Allotment_Status_On_NSE\" title=\"Check Allotment Status On NSE\">Check Allotment Status On NSE<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/#IPO_Details\" title=\"IPO Details\">IPO Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/#Sattva_Engineering_Construction_IPO_Share_Reservation\" title=\"Sattva Engineering Construction IPO Share Reservation\">Sattva Engineering Construction IPO Share Reservation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/#Sattva_Engineering_Construction_IPO_GMP\" title=\"Sattva Engineering Construction IPO GMP\">Sattva Engineering Construction IPO GMP<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/#Sattva_Engineering_Construction_IPO_Timeline\" title=\"Sattva Engineering Construction IPO Timeline\">Sattva Engineering Construction IPO Timeline<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-allotment-status\/#Recent_Articles\" title=\"Recent Articles\">Recent Articles<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_IPO_Allotment_Status\"><\/span><strong>Sattva Engineering Construction IPO Allotment Status<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>The current Infraprojects allotment status is to be shared with the public. The company has credited the shares to the allottees\u2019 demat accounts. MUFG Intime India Private Limited, the registrar of the Sattva Engineering Construction IPO, has finalised the basis of allotment and is eligible to list under the T+3 rule. So, the public issue will be listed within three days after the subscription ends.&nbsp;<\/p><p>Investors can now check the Sattva Engineering Construction IPO allotment status on the official websites of the NSE and SME, as well as on the registrar&#8217;s portal.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Check_Allotment_Status_On_the_Registrar_Portal\"><\/span><strong>Check Allotment Status On the Registrar Portal<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Individuals can visit the official portal of MUFG Intime India Private Limited to check their allotment status. Consider the steps mentioned below to know about your allotment status on the registrar portal.&nbsp;<\/p><p><strong>Step 1<\/strong>: Visit the<a href=\"https:\/\/linkintime.co.in\/Initial_Offer\/public-issues.html\" rel=\"nofollow noopener\" target=\"_blank\"> registrar\u2019s website.<\/a><\/p><p><strong>Step 2<\/strong>: Select Sattva Engineering Construction IPO from the menu.&nbsp;<\/p><p><strong>Step 3<\/strong>: Select the option to check the allotment status using your application number, Demat account\/PAN.&nbsp;<\/p><p><strong>Step 4<\/strong>: Complete the required details to proceed.&nbsp;<\/p><p><strong>Step 5<\/strong>: Enter the CAPTCHA and click the Submit button.&nbsp;<\/p><p>The Sattva Engineering Construction IPO allotment status will be displayed on your screen.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Check_Allotment_Status_On_NSE\"><\/span><strong>Check Allotment Status On NSE<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Follow the steps outlined below to check the Sattva Engineering Construction IPO allotment status on the official website of the National Stock Exchange (NSE).&nbsp;<\/p><p><strong>Step 1<\/strong>: Visit the <a href=\"https:\/\/www.nseindia.com\/\" rel=\"nofollow noopener\" target=\"_blank\">NSE Official Website.<\/a><\/p><p><strong>Step 2<\/strong>: Select &#8216;Equity&#8217; as the Issue Type to proceed.&nbsp;<\/p><p><strong>Step 3<\/strong>: Scroll down through the issue names and select Sattva Engineering Construction IPO.<\/p><p><strong>Step 4<\/strong>: Select the mode from the application (no or PAN).&nbsp;<\/p><p><strong>Step 5<\/strong>: Submit your information.<\/p><p>The Sattva Engineering Construction IPO allotment status will be displayed on your screen.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"IPO_Details\"><\/span><strong>IPO Details<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>26th August 2025<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>29th August 2025<\/td><\/tr><tr><td><strong>IPO Allotment Date<\/strong><\/td><td>1st September 2025<\/td><\/tr><tr><td><strong>Refund Initiation&nbsp;<\/strong><\/td><td>2nd September 2025<\/td><\/tr><tr><td><strong>Issue Size<\/strong><\/td><td>47,16,800 shares(aggregating up to \u20b935.38 Cr)<\/td><\/tr><tr><td><strong>Face Value<\/strong><\/td><td>\u20b910 per share<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>1,600 shares<\/td><\/tr><tr><td><strong>Issue Price Band<\/strong><\/td><td>\u20b970 to \u20b975 per share<\/td><\/tr><tr><td><strong>Issue Type<\/strong><\/td><td>Bookbuilding IPO<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td>NSE &amp; SME<\/td><\/tr><tr><td><strong>Listing Date<\/strong><\/td><td>3rd September 2025<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_IPO_Share_Reservation\"><\/span><strong>Sattva Engineering Construction IPO Share Reservation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><strong>The Sattva Engineering Construction IPO<\/strong> is a bookbuilding IPO of \u20b935.38 crore, comprising a fresh issue of 0.47 crore shares. The issue will be listed on NSE and SME on its tentative listing date, 3rd September 2025. Sattva Engineering Construction IPO shares will be listed on the NSE and the SME Exchange. Furthermore, SEBI has specified the share reservation criteria for different investor categories.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Investor Categories<\/strong><\/td><td><strong>Shares Offered<\/strong><\/td><\/tr><tr><td><strong>QIB Shares Offered<\/strong><\/td><td>Not more than 50% of the Net Issue<\/td><\/tr><tr><td><strong>Retail Shares Offered<\/strong><\/td><td>Not less than 35.00% of the Net Issue<\/td><\/tr><tr><td><strong>NII (HNI) Shares Offered<\/strong><\/td><td>Not Less than 15% of the Net Issue<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_IPO_GMP\"><\/span><strong>Sattva Engineering Construction IPO GMP<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-1024x536.jpg\" alt=\"\" class=\"wp-image-47522\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>As of 29th August 2025, <strong>Sattva Engineering Construction IPO GMP <\/strong>stands at \u20b918 per share. Thus, the estimated listing price would be \u20b993. This indicates that the estimated listing gain in this IPO could be 24.00%. However, GMP details are subject to change based on market conditions and fluctuations. Explore the table for the <strong>Sattva Engineering Construction IPO GMP<\/strong> updates.<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>GMP Date<\/strong><\/td><td><strong>IPO Price<\/strong><\/td><td><strong>GMP<\/strong><\/td><td><strong>Estimated Listing Price&nbsp;<\/strong><\/td><td><strong>Estimated Listing Gains<\/strong><\/td><\/tr><tr><td><strong>29-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b918.00<\/td><td>\u20b993.00<\/td><td>24.00%<\/td><\/tr><tr><td><strong>28-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b919.00<\/td><td>\u20b994.00<\/td><td>25.33%<\/td><\/tr><tr><td><strong>27-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b919.00<\/td><td>\u20b994.00<\/td><td>25.33%<\/td><\/tr><tr><td><strong>26-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b919.00<\/td><td>\u20b994.00<\/td><td>25.33%<\/td><\/tr><tr><td><strong>25-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b917.00<\/td><td>\u20b992.00<\/td><td>22.67%<\/td><\/tr><tr><td><strong>24-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>23-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>22-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>21-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>20-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>19-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_IPO_Timeline\"><\/span><strong>Sattva Engineering Construction IPO Timeline<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>26th August 2025<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>29th August 2025<\/td><\/tr><tr><td><strong>Allotment<\/strong><\/td><td>1st September 2025<\/td><\/tr><tr><td><strong>Refund Date<\/strong><\/td><td>2nd September 2025<\/td><\/tr><tr><td><strong>IPO Listing Date<\/strong><\/td><td>3rd September 2025<\/td><\/tr><\/tbody><\/table><\/figure><p><strong>Note<\/strong>: For any queries, please contact MUFG Intime India Private Limited at <a href=\"mailto:ipo.helpdesk@linkintime.co.in\">ipo.helpdesk@linkintime.co.in<\/a> or +91-22-49188 6270.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Recent_Articles\"><\/span><strong>Recent Articles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><a href=\"https:\/\/univest.in\/blogs\/droom-ipo\">Droom IPO Details: Everything You Should Know about<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/upcoming-ipos-4\">Upcoming IPO: Optivalue Tek Consulting, Goel Construction Co, Austere Systems<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/stocks-under-100\">Best Stocks Under \u20b9100 in 2025 for Potential Returns<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/white-organic-retail-q1-results-fy26\">White Organic Retail Q1 Results FY26: Q1 PAT Fall 194.39% to -\u20b91.77 Crore; Revenue Up -% YoY<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/prabhat-technologies-q1-results-fy26\">Prabhat Technologies Q1 Results FY26: Q1 PAT Fall 34.09% to -\u20b90.76 Crore; Revenue Up 93.95% YoY<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/godha-cabcon-and-insulation-q1-results-fy26\">Godha Cabcon and Insulation Q1 Results FY26: Q1 PAT Rises 53.47% to \u20b90.69 Crore; Revenue Down 39.92% YoY<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Following a strong response from investors, the bidding period for the Sattva Engineering Construction IPO has finally come to a close. It has received a total of 196.38 times subscriptions. The public issue was subscribed to 169.60 times by individual investors, 123.39 times by QIBs, and 350.91 times by NII. The allotment was set to<\/p>\n","protected":false},"author":23,"featured_media":47519,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[2102],"class_list":["post-47518","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-sattva-engineering-construction-ipo-allotment-status"],"metadata":{"_edit_lock":["1756485728:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_internal_links_processed":["1"],"rank_math_seo_score":["74"],"_thumbnail_id":["47519"],"rank_math_primary_category":["842"],"_edit_last":["23"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"_wp_page_template":["default"],"rank_math_title":["Check Sattva Engineering Construction IPO Allotment Status With Live GMP "],"rank_math_description":["Check the Sattva Engineering Construction IPO allotment status online with live GMP status. Learn more about the Sattva Engineering Construction IPO subscription, timeline, and more. Read more to know everything. "],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"rank_math_focus_keyword":["Sattva Engineering Construction IPO Allotment Status"],"amazonS3_cache":["a:4:{s:106:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/08\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3.jpg\";a:2:{s:2:\"id\";i:47522;s:11:\"source_type\";s:13:\"media-library\";}s:115:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/08\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-1024x536.jpg\";a:2:{s:2:\"id\";i:47522;s:11:\"source_type\";s:13:\"media-library\";}s:138:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3.jpg\";a:2:{s:2:\"id\";i:47522;s:11:\"source_type\";s:13:\"media-library\";}s:147:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29221117\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-3-1024x536.jpg\";a:2:{s:2:\"id\";i:47522;s:11:\"source_type\";s:13:\"media-library\";}}"],"rank_math_analytic_object_id":["2979"],"rs_page_bg_color":[""],"rank_math_canonical_url":["https:\/\/univest.in\/blogs\/sattva-engineering-construction-ipo-allotment-status"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29220802\/Sattva-Engineering-Construction-IPO-Allotment-Status.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=47518"}],"version-history":[{"count":2,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47518\/revisions"}],"predecessor-version":[{"id":47523,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47518\/revisions\/47523"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/47519"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=47518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=47518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=47518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}