{"id":47414,"date":"2025-08-29T12:09:02","date_gmt":"2025-08-29T06:39:02","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=47414"},"modified":"2025-08-29T12:09:26","modified_gmt":"2025-08-29T06:39:26","slug":"current-infraprojects-ipo-gmp-day-3","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/","title":{"rendered":"Current Infraprojects IPO GMP: Day 3 IPO Live Updates"},"content":{"rendered":"<p>The <strong>Current Infraprojects IPO GMP <\/strong>is \u20b940 as of 29th August 2025. It is a bookbuilding IPO of \u20b941.80 crores. This is an entirely new issue of 0.52 crore shares. The issue will be listed on NSE and SME on its tentative listing date, 3rd September 2025. The face value of Current Infraprojects shares stands at \u20b910 per share, and the IPO price band is set at \u20b976.00 to \u20b980.00 per share. Retail investors can bid for a minimum of 2 lots of 3,200 shares worth \u20b92,56,000.&nbsp;<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#Current_Infraprojects_IPO_GMP_Grey_Market_Premium\" title=\"Current Infraprojects IPO GMP Grey Market Premium\">Current Infraprojects IPO GMP Grey Market Premium<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#Explanation\" title=\"Explanation\">Explanation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#Objectives_of_the_Current_Infraprojects_IPO\" title=\"Objectives of the Current Infraprojects IPO\">Objectives of the Current Infraprojects IPO<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#Current_Infraprojects_IPO_Registrar\" title=\"Current Infraprojects IPO Registrar\">Current Infraprojects IPO Registrar<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#Current_Infraprojects_IPO_Review\" title=\"Current Infraprojects IPO Review&nbsp;&nbsp;\">Current Infraprojects IPO Review&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#Current_Infraprojects_Limited_Technicals\" title=\"Current Infraprojects Limited Technicals\">Current Infraprojects Limited Technicals<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#Current_Infraprojects_Limited_IPO_Peer_Comparison\" title=\"Current Infraprojects Limited IPO Peer Comparison\">Current Infraprojects Limited IPO Peer Comparison<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#FAQs_on_Current_Infraprojects_IPO\" title=\"FAQs on Current Infraprojects IPO\">FAQs on Current Infraprojects IPO<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#What_is_the_Current_Infraprojects_IPO_GMP\" title=\"What is the Current Infraprojects IPO GMP?\">What is the Current Infraprojects IPO GMP?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#What_is_the_issue_price_of_the_Current_Infraprojects_IPO\" title=\"What is the issue price of the Current Infraprojects IPO?\">What is the issue price of the Current Infraprojects IPO?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/current-infraprojects-ipo-gmp-day-3\/#Who_is_the_registrar_of_the_Current_Infraprojects_IPO\" title=\"Who is the registrar of the Current Infraprojects IPO?\">Who is the registrar of the Current Infraprojects IPO?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Current_Infraprojects_IPO_GMP_Grey_Market_Premium\"><\/span><strong>Current Infraprojects IPO GMP Grey Market Premium<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>As of 29th August 2025, the <strong>Current Infraprojects IPO GMP <\/strong>stands at \u20b940 per share. Thus, the estimated listing price would be \u20b9120. This indicates that the estimated listing gain in this IPO could be 50.00%. However, GMP details are subject to change based on market conditions and fluctuations. Explore the table for the <strong>Current Infraprojects IPO GMP<\/strong> updates.<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>GMP Date<\/strong><\/td><td><strong>IPO Price<\/strong><\/td><td><strong>GMP<\/strong><\/td><td><strong>Estimated Listing Price&nbsp;<\/strong><\/td><td><strong>Estimated Listing Gains<\/strong><\/td><\/tr><tr><td><strong>29-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b940.00<\/td><td>\u20b9120.00<\/td><td>50.00%<\/td><\/tr><tr><td><strong>28-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b940.00<\/td><td>\u20b9120.00<\/td><td>50.00%<\/td><\/tr><tr><td><strong>27-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b945.00<\/td><td>\u20b9125.00<\/td><td>56.25%<\/td><\/tr><tr><td><strong>26-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b945.00<\/td><td>\u20b9125.00<\/td><td>56.25%<\/td><\/tr><tr><td><strong>25-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b943.00<\/td><td>\u20b9123.00<\/td><td>53.75%<\/td><\/tr><tr><td><strong>24-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b940.00<\/td><td>\u20b9120.00<\/td><td>50.00%<\/td><\/tr><tr><td><strong>23-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b940.00<\/td><td>\u20b9120.00<\/td><td>50.00%<\/td><\/tr><tr><td><strong>22-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b940.00<\/td><td>\u20b9120.00<\/td><td>50.00%<\/td><\/tr><tr><td><strong>21-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b935.00<\/td><td>\u20b9115.00<\/td><td>43.75%<\/td><\/tr><tr><td><strong>20-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b927.00<\/td><td>\u20b9107.00<\/td><td>33.75%<\/td><\/tr><tr><td><strong>19-08-2025<\/strong><\/td><td>\u20b980.00<\/td><td>\u20b915.00<\/td><td>\u20b995.00<\/td><td>18.75%<\/td><\/tr><\/tbody><\/table><\/figure><p><strong>Current Infraprojects IPO Details<\/strong><\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>26th August 2025<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>29th August 2025<\/td><\/tr><tr><td><strong>IPO Allotment Date<\/strong><\/td><td>1st September 2025<\/td><\/tr><tr><td><strong>Refund Initiation&nbsp;<\/strong><\/td><td>2nd September 2025<\/td><\/tr><tr><td><strong>Issue Size<\/strong><\/td><td>52,25,600 shares(aggregating up to \u20b941.80 Cr)<\/td><\/tr><tr><td><strong>Face Value<\/strong><\/td><td>\u20b910 per share<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>1,600 shares<\/td><\/tr><tr><td><strong>Issue Price Band<\/strong><\/td><td>\u20b976 to \u20b980 per share<\/td><\/tr><tr><td><strong>Issue Type<\/strong><\/td><td>Bookbuilding IPO<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td><a href=\"https:\/\/www.nseindia.com\/\" rel=\"nofollow noopener\" target=\"_blank\">NSE<\/a> &amp; SME<\/td><\/tr><tr><td><strong>Listing Date<\/strong><\/td><td>3rd September 2025<\/td><\/tr><\/tbody><\/table><\/figure><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Explanation\"><\/span><strong>Explanation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p><strong>Current Infraprojects IPO<\/strong>: Current Infraprojects Limited has declared that the issue price band is set between \u20b976.00 and \u20b980.00&nbsp; per share. With this IPO, the company allows retail investors to bid for at least two lots of 3,200 shares worth \u20b92,56,000. The face value of Current Infraprojects Limited shares is \u20b910 per share. The shares of Current Infraprojects Limited will be listed on NSE and SME on its tentative listing day, 3rd September 2025. Scroll down to check GMP updates and <strong>Current Infraprojects IPO <\/strong>reviews.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Objectives_of_the_Current_Infraprojects_IPO\"><\/span><strong>Objectives of the Current Infraprojects IPO<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>The primary aim of the <strong>Current Infraprojects IPO<\/strong> is to raise \u20b941.80 crores. On the other hand, Current Infraprojects has decided to utilise these funds in different ways. Explore some of the secondary objectives for the Current Infraprojects IPO.<\/p><ul class=\"wp-block-list\"><li>To meet the general corporate purpose.<\/li>\n\n<li>To fund the working capital requirement.&nbsp;<\/li>\n\n<li>To invest in the equity of a wholly owned subsidiary.<\/li><\/ul><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Current_Infraprojects_IPO_Registrar\"><\/span><strong>Current Infraprojects IPO Registrar<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Bigshare Services Private Limited is the registrar of the <strong>Current Infraprojects IPO,<\/strong> responsible for managing the IPO allotment process and initiating refunds. For any queries regarding the Current Infraprojects allotment and refund, you can contact Bigshare Services Private Limited at <a href=\"mailto:investor@bigshareonline.com\">investor@bigshareonline.com<\/a><strong> <\/strong>or +91-22-6263 8200.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Current_Infraprojects_IPO_Review\"><\/span><strong>Current Infraprojects IPO Review&nbsp;&nbsp;<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid--1024x536.jpg\" alt=\"\" class=\"wp-image-47416\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid--1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid--300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid--768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid--900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid--600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid--150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid-.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>The <strong>Current Infraprojects IPO <\/strong>has gained neutral ratings from industry experts, brokers, and institutional investors. Current Infraprojects Limited&#8217;s revenue increased by 17.49% from \u20b977.73 crores in March 2024 to \u20b991.33 crores in March 2025. Moreover, the company&#8217;s PAT rose by 85.652% from \u20b95.09 crores to \u20b99.45 crores. Investors can analyse other relevant factors and make a decision accordingly.<\/p><p>Most analysts recommend applying for this IPO to diversify your investment portfolio in the stock market. However, we\u2019re waiting for further ratings to gain a better understanding and will continue to post them to deliver real-time insights. Until then, you can explore the company&#8217;s technical analysis to know whether you should apply for the <strong>Current Infraprojects IPO <\/strong>or not.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Current_Infraprojects_Limited_Technicals\"><\/span><strong>Current Infraprojects Limited Technicals<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Key Indicators<\/strong><\/td><td><strong>Value<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/price-to-earnings-ratio-p-e-ratio\"><strong>PE Ratio (Price-to-Earnings)&nbsp;<\/strong><\/a><\/td><td>11.78<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/earnings-per-share-eps-formula\"><strong>EPS (Earnings Per Share)<\/strong><\/a><\/td><td>6.79<\/td><\/tr><tr><td><strong>RoNW<\/strong><\/td><td>39.84%<\/td><\/tr><tr><td><strong>ROCE<\/strong><\/td><td>26.29%<\/td><\/tr><tr><td><strong>ROE<\/strong><\/td><td>49.75%<\/td><\/tr><tr><td><strong>EBITDA Margin<\/strong><\/td><td>16.23%<\/td><\/tr><tr><td><strong>Price to Book Value<\/strong><\/td><td>4.55<\/td><\/tr><tr><td><strong>Market Capitalisation<\/strong><\/td><td>\u20b9153.18 Cr<\/td><\/tr><\/tbody><\/table><\/figure><p>The PE ratio of Current Infraprojects Limited shares is 11.78, and its Earnings Per Share (EPS) stands at \u20b96.79. Thus, the <a href=\"https:\/\/univest.in\/blogs\/current-infraprojects-ipo\"><strong>Current Infraprojects IPO<\/strong> <\/a>can potentially deliver gains on its tentative listing date, 3rd September 2025.&nbsp;<\/p><p><strong><em>Note<\/em><\/strong><em>: The data, as mentioned above, is taken from authentic sources and highlights pre-issue information. The PE ratio and EPS of Current Infraprojects Limited are subject to change after the IPO. Refer to the table below for post-issue updates on these two metrics.&nbsp;<\/em><\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Indicators<\/strong><\/td><td><strong>Pre-IPO<\/strong><\/td><td><strong>Post-IPO<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/price-to-earnings-ratio-p-e-ratio\"><strong>PE Ratio<\/strong><\/a><\/td><td>11.78<\/td><td>16.19<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/earnings-per-share-eps-formula\"><strong>EPS<\/strong><\/a><strong>&nbsp;<\/strong><\/td><td>6.79<\/td><td>4.94<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Current_Infraprojects_Limited_IPO_Peer_Comparison\"><\/span><strong>Current Infraprojects Limited IPO Peer Comparison<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Company Name<\/strong><\/td><td><strong>EPS<\/strong><\/td><td><strong>P\/E Ratio<\/strong><\/td><td><strong>RoNW<\/strong><\/td><td><strong>Face value<\/strong><\/td><td><strong>Revenue<\/strong><\/td><\/tr><tr><td><strong><a href=\"https:\/\/www.currentinfra.com\" rel=\"nofollow noopener\" target=\"_blank\">Current Infraprojects<\/a><\/strong><\/td><td>7.00<\/td><td>11.78<\/td><td>39.84<\/td><td>\u20b910<\/td><td>91.33<\/td><\/tr><tr><td><strong>K2 Infragen Limited<\/strong><\/td><td>9.15<\/td><td>7.42<\/td><td>15.14<\/td><td>\u20b910<\/td><td>109.00<\/td><\/tr><tr><td><strong><a href=\"https:\/\/univest.in\/stocks\/oriana\/oriana-power-ltd-share-price-today\">Oriana Power Limited<\/a><\/strong><\/td><td>79.52<\/td><td>27.54<\/td><td>31.11<\/td><td>\u20b910<\/td><td>386.00<\/td><\/tr><tr><td><strong><a href=\"https:\/\/univest.in\/stocks\/kceil\/kay-cee-energy-and-infra-ltd-share-price-today\">Kay Cee Energy A Infra Limited<\/a><\/strong><\/td><td>15.57<\/td><td>21.35<\/td><td>27.66<\/td><td>\u20b910<\/td><td>64.86<\/td><\/tr><tr><td><strong><a href=\"https:\/\/univest.in\/stocks\/rulka\/rulka-electricals-ltd-share-price-today\">Rulka Electricals Limited<\/a><\/strong><\/td><td>5.46<\/td><td>23.06<\/td><td>6.61<\/td><td>\u20b910<\/td><td>71.29<\/td><\/tr><tr><td><strong><a href=\"https:\/\/univest.in\/stocks\/hmeml\/hm-electro-mech-limited-share-price-today\">H.M. Electro Mech Limited<\/a><\/strong><\/td><td>7.88<\/td><td>8.55<\/td><td>12.76<\/td><td>\u20b910<\/td><td>117.00<\/td><\/tr><\/tbody><\/table><\/figure><p><strong><em>Also Read : <a href=\"https:\/\/univest.in\/blogs\/mangal-electrical-ipo-listing-today\">Mangal Electrical IPO Listing at 0.9% discount at \u20b9556 Per Share<\/a><\/em><\/strong><\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs_on_Current_Infraprojects_IPO\"><\/span><strong>FAQs on Current Infraprojects IPO<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_Current_Infraprojects_IPO_GMP\"><\/span><strong>What is the Current Infraprojects IPO GMP?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. Currently, on 29th August 2025, the <strong>Current Infraprojects IPO GMP<\/strong> (Grey Market Premium) stands at \u20b940. This indicates that the estimated listing price could be \u20b9120 per share.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_issue_price_of_the_Current_Infraprojects_IPO\"><\/span><strong>What is the issue price of the Current Infraprojects IPO?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. The <strong>Current Infraprojects IPO<\/strong> price is set at \u20b976.00 to \u20b988.00 per share.&nbsp; Retail investors can apply for a minimum of 2 lots, each consisting of 3,200 shares, worth \u20b92,56,000. Moreover, HNIs are required to bid for a minimum of 3 lots (4,800 shares) worth \u20b93,84,000.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Who_is_the_registrar_of_the_Current_Infraprojects_IPO\"><\/span><strong>Who is the registrar of the Current Infraprojects IPO?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. Bigshare Services Private Limited is the registrar of the <strong>Current Infraprojects IPO,<\/strong> responsible for managing the IPO allotment process and initiating refunds. For any queries regarding the Current Infraprojects allotment and refund, you can contact Bigshare Services Private Limited at <a href=\"mailto:investor@bigshareonline.com\">investor@bigshareonline.com<\/a><strong> <\/strong>or +91-22-6263 8200.<\/p><p><strong><em>Disclaimer<\/em><\/strong><em>: The above information is compiled from authentic sources and is just for informational purposes. To have detailed information about the Current Infraprojects IPO, download the Current Infraprojects IPO RHP and Current Infraprojects IPO DRHP. Conduct thorough research before investing in IPOs to minimise the risk of significant losses. You can also consult your financial advisor.<\/em><\/p><p><strong>Recent Articles<\/strong><\/p><p><a href=\"https:\/\/univest.in\/blogs\/droom-ipo\">Droom IPO Details: Everything You Should Know about<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/upcoming-ipos-4\">Upcoming IPO: Optivalue Tek Consulting, Goel Construction Co, Austere Systems<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/stocks-under-100\">Best Stocks Under \u20b9100 in 2025 for Potential Returns<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/white-organic-retail-q1-results-fy26\">White Organic Retail Q1 Results FY26: Q1 PAT Fall 194.39% to -\u20b91.77 Crore; Revenue Up -% YoY<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/prabhat-technologies-q1-results-fy26\">Prabhat Technologies Q1 Results FY26: Q1 PAT Fall 34.09% to -\u20b90.76 Crore; Revenue Up 93.95% YoY<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/godha-cabcon-and-insulation-q1-results-fy26\">Godha Cabcon and Insulation Q1 Results FY26: Q1 PAT Rises 53.47% to \u20b90.69 Crore; Revenue Down 39.92% YoY<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>The Current Infraprojects IPO GMP is \u20b940 as of 29th August 2025. It is a bookbuilding IPO of \u20b941.80 crores. This is an entirely new issue of 0.52 crore shares. The issue will be listed on NSE and SME on its tentative listing date, 3rd September 2025. The face value of Current Infraprojects shares stands<\/p>\n","protected":false},"author":23,"featured_media":47415,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[2086],"class_list":["post-47414","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-current-infraprojects-ipo-gmp-day-3"],"metadata":{"_edit_lock":["1756449566:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_internal_links_processed":["1"],"amazonS3_cache":["a:4:{s:93:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/08\/Current-Infraprojects-IPO-Apply-or-Avoid-.jpg\";a:2:{s:2:\"id\";i:47416;s:11:\"source_type\";s:13:\"media-library\";}s:102:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/08\/Current-Infraprojects-IPO-Apply-or-Avoid--1024x536.jpg\";a:2:{s:2:\"id\";i:47416;s:11:\"source_type\";s:13:\"media-library\";}s:125:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid-.jpg\";a:2:{s:2:\"id\";i:47416;s:11:\"source_type\";s:13:\"media-library\";}s:134:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120314\/Current-Infraprojects-IPO-Apply-or-Avoid--1024x536.jpg\";a:2:{s:2:\"id\";i:47416;s:11:\"source_type\";s:13:\"media-library\";}}"],"rank_math_seo_score":["67"],"_thumbnail_id":["47415"],"rank_math_primary_category":["842"],"_edit_last":["23"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"_wp_page_template":["default"],"rank_math_title":["Current Infraprojects IPO GMP Day 3 | Check IPO Details"],"rank_math_description":["Current Infraprojects IPO GMP status. Discover the IPO Price, Date, Subscription Status, Grey Market Premium GMP, Allotment, Listing Date, and Review. Read more!"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"rank_math_focus_keyword":["Current Infraprojects IPO GMP Day 3"],"rank_math_analytic_object_id":["2958"],"rs_page_bg_color":[""],"rank_math_canonical_url":["https:\/\/univest.in\/blogs\/current-infraprojects-ipo-gmp-day-3"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/29120241\/Current-Infraprojects-Construction-IPO-GMP-Day-3.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47414","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=47414"}],"version-history":[{"count":2,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47414\/revisions"}],"predecessor-version":[{"id":47418,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47414\/revisions\/47418"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/47415"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=47414"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=47414"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=47414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}