{"id":47164,"date":"2025-08-27T19:34:52","date_gmt":"2025-08-27T14:04:52","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=47164"},"modified":"2025-08-27T19:35:42","modified_gmt":"2025-08-27T14:05:42","slug":"sattva-engineering-construction-subscription-status","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/","title":{"rendered":"Sattva Engineering Construction Subscription Day 1\u00a0"},"content":{"rendered":"<p>Here, Sattva Engineering Construction launched on 26th August 2025. The issue will be closed for bidding today, on 29th August 2025. The primary aim of <strong>Sattva Engineering Construction <\/strong>is to raise \u20b935.38 crores from the market. Also, Sattva Engineering Construction has received an impressive level of subscription, which indicates that shares will be listed at an impeccable premium. Scroll down to check the Sattva Engineering Construction subscription and details.&nbsp;<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Sattva_Engineering_Construction_Details\" title=\"Sattva Engineering Construction Details&nbsp;\">Sattva Engineering Construction Details&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Sattva_Engineering_Construction_Subscription_Status\" title=\"Sattva Engineering Construction Subscription Status\">Sattva Engineering Construction Subscription Status<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Sattva_Engineering_Construction_GMP_Today\" title=\"Sattva Engineering Construction GMP Today\">Sattva Engineering Construction GMP Today<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#About_Sattva_Engineering_Construction_Ltd\" title=\"About Sattva Engineering Construction Ltd.\">About Sattva Engineering Construction Ltd.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Financial_Performance\" title=\"Financial Performance\">Financial Performance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Explanation\" title=\"Explanation\">Explanation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Technical_Indicators\" title=\"Technical Indicators\">Technical Indicators<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Sattva_Engineering_Construction_Listing_Expectations\" title=\"Sattva Engineering Construction Listing Expectations\">Sattva Engineering Construction Listing Expectations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Sattva_Engineering_Construction_Dates\" title=\"Sattva Engineering Construction Dates\">Sattva Engineering Construction Dates<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-subscription-status\/#Recent_Articles\" title=\"Recent Articles\">Recent Articles<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_Details\"><\/span><strong>Sattva Engineering Construction Details&nbsp;<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>26th August 2025<\/td><\/tr><tr><td><strong>Face Value&nbsp;<\/strong><\/td><td>\u20b910 per share<\/td><\/tr><tr><td><strong>Price Band<\/strong><\/td><td>\u20b970 to 75 per share<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>1,600 Shares<\/td><\/tr><tr><td><strong>Issue Type<\/strong><\/td><td>Bookbuilding IPO<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td><a href=\"https:\/\/www.nseindia.com\/\" rel=\"nofollow noopener\" target=\"_blank\">NSE<\/a> and SME<\/td><\/tr><tr><td><strong>IPO Close Date&nbsp;<\/strong><\/td><td>29th August 2025<\/td><\/tr><tr><td><strong>Listing Date&nbsp;<\/strong><\/td><td>3rd September 2025<\/td><\/tr><\/tbody><\/table><\/figure><p>The price band for Sattva Engineering Construction has been prescribed as \u20b970 to \u20b975 per share, with a total of 33,87,200 shares issued. Let&#8217;s segregate the share quota fixed for different categories of investors.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Categories<\/strong><\/td><td><strong>Shares Offered<\/strong><\/td><td><strong>% Shares offered<\/strong><\/td><\/tr><tr><td><strong>Market Maker Shares Offered<\/strong><\/td><td>2,40,000<\/td><td>7.09%<\/td><\/tr><tr><td><strong>QIB Shares Offered<\/strong><\/td><td>8,88,000<\/td><td>0.00%<\/td><\/tr><tr><td><strong>NII (HNI) Shares Offered<\/strong><\/td><td>6,91,200<\/td><td>20.41%<\/td><\/tr><tr><td><strong>Retail Investors<\/strong><\/td><td>15,68,000<\/td><td>46.29%<\/td><\/tr><tr><td><strong>Total Shares Offered<\/strong><\/td><td>33,87,200<\/td><td>100.00%<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_Subscription_Status\"><\/span><strong>Sattva Engineering Construction Subscription Status<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>As of now, <a href=\"https:\/\/sattvaengg.in\" rel=\"nofollow noopener\" target=\"_blank\">Sattva Engineering Construction<\/a> has been subscribed to 1.41 times. Of these, 1.95 times are subscribed by retail investors, 2.00 times by non-institutional investors, and 0.00 times by QII (Qualified Institutional Investors).\u00a0\u00a0<\/p><p>The healthy subscription status indicates that investors are expecting higher returns at the time of the Sattva Engineering Construction listing on 3rd September 2025. Sattva Engineering Construction also has a positive outlook behind the fresh issue of 0.47 crore shares to raise around Rs 35.38 crore.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_GMP_Today\"><\/span><strong>Sattva Engineering Construction GMP Today<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>We know that higher subscriptions encourage grey market premiums for the IPOs. Let\u2019s explore the Sattva Engineering Construction GMP for 26th August 2025.&nbsp;<\/p><p>The grey market premium for this IPO is 25.33% or Rs 19 per share. It indicates that the estimated listing price per share is Rs 94. Numerous factors played a pivotal role in this jump in Sattva Engineering Construction IPO GMP. These include higher subscriptions received, positive market sentiments, and investors&#8217; positive attitude towards IPO.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"About_Sattva_Engineering_Construction_Ltd\"><\/span><strong>About Sattva Engineering Construction Ltd.<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Sattva Engineering Construction Limited was incorporated in December 2005, a Chennai-based construction company with over 40 years of experience in construction. It is the leading contractor collaborating with the government bodies specialising in water infrastructure, wastewater management, and industrial construction projects.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Financial_Performance\"><\/span><strong>Financial Performance<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Assess the financial performance of the company for the past three years to get an idea of the expectations for the Sattva Engineering Construction listing.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Year Ended<\/strong><\/td><td><strong>31st March 2025 (in cr.)<\/strong><\/td><td><strong>31st March 2024 (in cr.)<\/strong><\/td><td><strong>31st March 2023 (in cr.)<\/strong><\/td><\/tr><tr><td><strong>Assets<\/strong><\/td><td>114.82<\/td><td>87.48<\/td><td>83.38<\/td><\/tr><tr><td><strong>Revenue<\/strong><\/td><td>94.85<\/td><td>77.44<\/td><td>83.93<\/td><\/tr><tr><td><strong>Profit After Tax<\/strong><\/td><td>9.14<\/td><td>4.56<\/td><td>1.04<\/td><\/tr><tr><td><strong>EBITDA<\/strong><\/td><td>18.56<\/td><td>11.72<\/td><td>7.28<\/td><\/tr><tr><td><strong>Net Worth<\/strong><\/td><td>43.42<\/td><td>24.03<\/td><td>19.47<\/td><\/tr><tr><td><strong>Reserve and surplus<\/strong><\/td><td>30.67<\/td><td>23.03<\/td><td>18.47<\/td><\/tr><tr><td><strong>Total Borrowing<\/strong><\/td><td>36.17<\/td><td>32.20<\/td><td>32.24<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Explanation\"><\/span><strong>Explanation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Sattva Engineering Construction Limited&#8217;s revenue increased by 22% from \u20b977.44 crores in March 2024 to \u20b994.85 crores in March 2025. Moreover, the company&#8217;s PAT rose by 100% from \u20b94.56 crores to \u20b99.14 crores.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Technical_Indicators\"><\/span><strong>Technical Indicators<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Several technical indicators are available to assess a company&#8217;s potential to deliver returns. Use the parameters mentioned below to analyse the technical aspects of <strong>Anlon Healthcare.<\/strong><\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Key Indicators<\/strong><\/td><td><strong>Value<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/price-to-earnings-ratio-p-e-ratio\"><strong>PE Ratio (Price-to-Earnings)<\/strong><\/a><strong>&nbsp;<\/strong><\/td><td>10.46<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/earnings-per-share-eps-formula\"><strong>EPS (Earnings Per Share)<\/strong><\/a><\/td><td>7.17<\/td><\/tr><tr><td><strong>RoNW<\/strong><\/td><td>27.10%<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/return-on-capital-employed\"><strong>ROCE<\/strong><\/a><\/td><td>28.58%<\/td><\/tr><tr><td><strong>ROE<\/strong><\/td><td>27.10%<\/td><\/tr><tr><td><strong>EBITDA Margin<\/strong><\/td><td>19.82%<\/td><\/tr><tr><td><strong>Price to Book Value<\/strong><\/td><td>2.20<\/td><\/tr><tr><td><strong>Market Capitalisation<\/strong><\/td><td>\u20b9131.01 Cr.<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_Listing_Expectations\"><\/span><strong>Sattva Engineering Construction Listing Expectations<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-1024x536.jpg\" alt=\"\" class=\"wp-image-47167\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>Sattva Engineering Construction IPO allotment is still pending. However, as per the current GMP or market sentiments, it is appropriate to expect higher listing gains from the share. A jump of 25.33% in Sattva Engineering Construction GMP indicates that the estimated listing price per share will be somewhere around Rs 94.<\/p><p>It will provide higher listing gains to investors who applied for this IPO. Also, the financial fundamentals of this business made it the experts\u2019 best recommendations for the long term.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_Dates\"><\/span><strong>Sattva Engineering Construction Dates<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>26th August 2025<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>29th August 2025<\/td><\/tr><tr><td><strong>Allotment<\/strong><\/td><td>1st September 2025<\/td><\/tr><tr><td><strong>Refund Date<\/strong><\/td><td>2nd September 2025<\/td><\/tr><tr><td><strong>IPO Listing Date<\/strong><\/td><td>3rd September 2025<\/td><\/tr><\/tbody><\/table><\/figure><p><strong>Note<\/strong>: IPO GMP is volatile based on market sentiment. Hence, one should conduct their research before investing in it.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Recent_Articles\"><\/span><strong>Recent Articles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><a href=\"https:\/\/univest.in\/blogs\/oval-projects-engineering-ipo\">Oval Projects Engineering IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/best-stocks-to-buy-today-26-aug-2025\">Best Stocks to Buy Today: Explore Best Stocks With Expected Trends<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/abril-paper-tech-ipo\">Abril Paper Tech IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/snehaa-organics-ipo\">Snehaa Organics IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/anondita-medicare-ipo-subscription-status\">Anondita Medicare IPO Subscription Day 2<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/shivashrit-foods-ipo-subscription-status\">Shivashrit Foods IPO Subscription Day 2<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/classic-electrodes-ipo-subscription-status\">Classic Electrodes IPO Subscription Day 2<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Here, Sattva Engineering Construction launched on 26th August 2025. The issue will be closed for bidding today, on 29th August 2025. The primary aim of Sattva Engineering Construction is to raise \u20b935.38 crores from the market. Also, Sattva Engineering Construction has received an impressive level of subscription, which indicates that shares will be listed at<\/p>\n","protected":false},"author":23,"featured_media":47165,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[2046],"class_list":["post-47164","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-sattva-engineering-construction-subscription-status"],"metadata":{"_edit_lock":["1756305660:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_internal_links_processed":["1"],"rank_math_seo_score":["70"],"_thumbnail_id":["47165"],"_edit_last":["23"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"_wp_page_template":["default"],"rank_math_title":["Sattva Engineering Construction Subscription Status Day 1: Check Online "],"rank_math_description":["Check the Sattva Engineering Construction subscription status online and also get live GMP details and reviews to anticipate the listing gains. Explore for more information about Anlon Healthcare."],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"rank_math_focus_keyword":["Sattva Engineering Construction Subscription Status"],"rank_math_primary_category":["842"],"amazonS3_cache":["a:4:{s:104:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/08\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1.jpg\";a:2:{s:2:\"id\";i:47167;s:11:\"source_type\";s:13:\"media-library\";}s:113:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/08\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-1024x536.jpg\";a:2:{s:2:\"id\";i:47167;s:11:\"source_type\";s:13:\"media-library\";}s:136:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1.jpg\";a:2:{s:2:\"id\";i:47167;s:11:\"source_type\";s:13:\"media-library\";}s:145:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193411\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1-1024x536.jpg\";a:2:{s:2:\"id\";i:47167;s:11:\"source_type\";s:13:\"media-library\";}}"],"rank_math_analytic_object_id":["2911"],"rs_page_bg_color":[""],"rank_math_canonical_url":["https:\/\/univest.in\/blogs\/sattva-engineering-construction-subscription-status"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/27193111\/Sattva-Engineering-Construction-IPO-GMP-Day-1-1.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47164","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=47164"}],"version-history":[{"count":2,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47164\/revisions"}],"predecessor-version":[{"id":47168,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47164\/revisions\/47168"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/47165"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=47164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=47164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=47164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}