{"id":47032,"date":"2025-08-26T12:43:35","date_gmt":"2025-08-26T07:13:35","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=47032"},"modified":"2025-08-26T12:51:35","modified_gmt":"2025-08-26T07:21:35","slug":"sattva-engineering-construction-ipo-gmp","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/","title":{"rendered":"Sattva Engineering Construction IPO GMP: Day 1 IPO Live Updates"},"content":{"rendered":"<p>The <strong>Sattva Engineering Construction IPO GMP <\/strong>is \u20b917 as of 26th August 2025. It is a bookbuilding IPO of \u20b935.38 crores. This is an entirely fresh issue of 0.47 crore shares. The issue will be listed on NSE and SME on its tentative listing date, 3rd September 2025. The face value of Sattva Engineering Construction shares stands at \u20b910 per share, and the IPO price band is set at \u20b970.00 to \u20b975.00 per share. Retail investors can bid for a minimum of 2 lots of 3,200 shares worth \u20b92,40,000.&nbsp;<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#Sattva_Engineering_Construction_IPO_GMP_Grey_Market_Premium\" title=\"Sattva Engineering Construction IPO GMP Grey Market Premium\">Sattva Engineering Construction IPO GMP Grey Market Premium<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#Explanation\" title=\"Explanation\">Explanation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#Objectives_of_the_Sattva_Engineering_Construction_IPO\" title=\"Objectives of the Sattva Engineering Construction IPO\">Objectives of the Sattva Engineering Construction IPO<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#Sattva_Engineering_Construction_IPO_Registrar\" title=\"Sattva Engineering Construction IPO Registrar\">Sattva Engineering Construction IPO Registrar<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#_Sattva_Engineering_Construction_IPO_Review\" title=\"&nbsp;Sattva Engineering Construction IPO Review&nbsp;&nbsp;\">&nbsp;Sattva Engineering Construction IPO Review&nbsp;&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#Sattva_Engineering_Construction_Limited_Technicals\" title=\"Sattva Engineering Construction Limited Technicals\">Sattva Engineering Construction Limited Technicals<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#Sattva_Engineering_Construction_Limited_IPO_Peer_Comparison\" title=\"Sattva Engineering Construction Limited IPO Peer Comparison\">Sattva Engineering Construction Limited IPO Peer Comparison<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#FAQs_on_Sattva_Engineering_Construction_IPO\" title=\"FAQs on Sattva Engineering Construction IPO\">FAQs on Sattva Engineering Construction IPO<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#What_is_the_Sattva_Engineering_Construction_IPO_GMP\" title=\"What is the Sattva Engineering Construction IPO GMP?\">What is the Sattva Engineering Construction IPO GMP?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#What_is_the_issue_price_of_the_Sattva_Engineering_Construction_IPO\" title=\"What is the issue price of the Sattva Engineering Construction IPO?\">What is the issue price of the Sattva Engineering Construction IPO?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#Who_is_the_registrar_of_the_Sattva_Engineering_Construction_IPO\" title=\"Who is the registrar of the Sattva Engineering Construction IPO?\">Who is the registrar of the Sattva Engineering Construction IPO?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/sattva-engineering-construction-ipo-gmp\/#Explore_Other_News_Articles\" title=\"Explore Other News Articles\">Explore Other News Articles<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_IPO_GMP_Grey_Market_Premium\"><\/span><strong>Sattva Engineering Construction IPO GMP Grey Market Premium<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>As of 26th August 2025, <strong>Sattva Engineering Construction IPO GMP <\/strong>stands at \u20b917 per share. Thus, the estimated listing price would be \u20b992. This indicates that the estimated listing gain in this IPO could be 22.67%. However, GMP details are subject to change based on market conditions and fluctuations. Explore the table for the <strong>Sattva Engineering Construction IPO GMP<\/strong> updates.<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>GMP Date<\/strong><\/td><td><strong>IPO Price<\/strong><\/td><td><strong>GMP<\/strong><\/td><td><strong>Estimated Listing Price&nbsp;<\/strong><\/td><td><strong>Estimated Listing Gains<\/strong><\/td><\/tr><tr><td><strong>26-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b917.00<\/td><td>\u20b992.00<\/td><td>22.67%<\/td><\/tr><tr><td><strong>25-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b917.00<\/td><td>\u20b992.00<\/td><td>22.67%<\/td><\/tr><tr><td><strong>24-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>23-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>22-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b915.00<\/td><td>\u20b990.00<\/td><td>20.00%<\/td><\/tr><tr><td><strong>21-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>20-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><tr><td><strong>19-08-2025<\/strong><\/td><td>\u20b975.00<\/td><td>\u20b90.00<\/td><td>\u20b90.00<\/td><td>0.00%<\/td><\/tr><\/tbody><\/table><\/figure><p><strong>Sattva Engineering Construction IPO Details<\/strong><\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>26th August 2025<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>29th August 2025<\/td><\/tr><tr><td><strong>IPO Allotment Date<\/strong><\/td><td>1st September 2025<\/td><\/tr><tr><td><strong>Refund Initiation&nbsp;<\/strong><\/td><td>2nd September 2025<\/td><\/tr><tr><td><strong>Issue Size<\/strong><\/td><td>47,16,800 shares(aggregating up to \u20b935.38 Cr)<\/td><\/tr><tr><td><strong>Face Value<\/strong><\/td><td>\u20b910 per share<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>1,600 shares<\/td><\/tr><tr><td><strong>Issue Price Band<\/strong><\/td><td>\u20b970 to \u20b975 per share<\/td><\/tr><tr><td><strong>Issue Type<\/strong><\/td><td>Bookbuilding IPO<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td>NSE &amp; SME<\/td><\/tr><tr><td><strong>Listing Date<\/strong><\/td><td>3rd September 2025<\/td><\/tr><\/tbody><\/table><\/figure><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Explanation\"><\/span><strong>Explanation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p><strong>Sattva Engineering Construction IPO<\/strong>: Sattva Engineering Construction Limited has declared that the issue price band is set between \u20b970.00 and \u20b975.00&nbsp; per share. With this IPO, the company allows retail investors to bid for at least two lots of 3,200 shares worth \u20b92,40,000. The face value of Sattva Engineering Construction Limited shares is \u20b910 per share. The shares of Sattva Engineering Construction Limited will be listed on NSE and SME on its tentative listing day, 3rd September 2025. Scroll down to check GMP updates and <strong>Sattva Engineering Construction IPO <\/strong>reviews.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Objectives_of_the_Sattva_Engineering_Construction_IPO\"><\/span><strong>Objectives of the Sattva Engineering Construction IPO<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>The primary aim of the <strong><a href=\"https:\/\/univest.in\/blogs\/sattva-engineering-construction-ipo\">Sattva Engineering Construction IPO<\/a><\/strong> is to raise \u20b935.38 crores. On the other hand, Sattva Engineering Construction has decided to utilise these funds in different ways. Explore some of the secondary objectives for the Sattva Engineering Construction IPO.<\/p><ul class=\"wp-block-list\"><li>To meet the general corporate purpose.<\/li>\n\n<li>To fund the working capital requirement.&nbsp;<\/li><\/ul><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_IPO_Registrar\"><\/span><strong>Sattva Engineering Construction IPO Registrar<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>MUFG Intime India Private Limited is the registrar of the <strong>Sattva Engineering Construction IPO,<\/strong> responsible for managing the IPO allotment procedure and refund initiation. For any queries regarding the Sattva Engineering Construction allotment and refund, you can contact MUFG Intime India Private Limited at <a href=\"mailto:ipo.helpdesk@linkintime.co.in\">ipo.helpdesk@linkintime.co.in<\/a>, +91-22-4918 6270.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"_Sattva_Engineering_Construction_IPO_Review\"><\/span>&nbsp;<strong>Sattva Engineering Construction IPO Review&nbsp;&nbsp;<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1024x536.jpg\" alt=\"\" class=\"wp-image-47040\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>The <strong>Sattva Engineering Construction IPO <\/strong>has gained neutral ratings from industry experts, brokers, and institutional investors. Sattva Engineering Construction Limited&#8217;s revenue increased by 22% from \u20b977.44 crores in March 2024 to \u20b994.85 crores in March 2025. Moreover, the company&#8217;s PAT rose by 100% from \u20b94.56 crores to \u20b99.14 crores. Investors can analyse other relevant factors and make a decision accordingly.<\/p><p>Most analysts recommend applying for this IPO to diversify your investment portfolio in the stock market. However, we\u2019re waiting for further ratings to have a better idea and will keep posting them to deliver real-time insights. Until then, you can explore the company&#8217;s technical analysis to know whether you should apply for the <strong>Sattva Engineering Construction IPO <\/strong>or not.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_Limited_Technicals\"><\/span><strong>Sattva Engineering Construction Limited Technicals<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Key Indicators<\/strong><\/td><td><strong>Value<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/price-to-earnings-ratio-p-e-ratio\"><strong>PE Ratio (Price-to-Earnings)&nbsp;<\/strong><\/a><\/td><td>10.46<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/earnings-per-share-eps-formula\"><strong>EPS (Earnings Per Share)<\/strong><\/a><\/td><td>7.17<\/td><\/tr><tr><td><strong>RoNW<\/strong><\/td><td>27.10%<\/td><\/tr><tr><td><strong>ROCE<\/strong><\/td><td>28.58%<\/td><\/tr><tr><td><strong>ROE<\/strong><\/td><td>27.10%<\/td><\/tr><tr><td><strong>EBITDA Margin<\/strong><\/td><td>19.82%<\/td><\/tr><tr><td><strong>Price to Book Value<\/strong><\/td><td>2.20<\/td><\/tr><tr><td><strong>Market Capitalisation<\/strong><\/td><td>\u20b9131.01 Cr.<\/td><\/tr><\/tbody><\/table><\/figure><p>The PE ratio of Sattva Engineering Construction Limited shares is 10.46, and its Earnings Per Share (EPS) stands at \u20b97.17. Thus, the <strong>Sattva Engineering Construction IPO<\/strong> can potentially deliver gains on its tentative listing date, 3rd September 2025.&nbsp;<\/p><p><strong><em>Note<\/em><\/strong><em>: The data, as mentioned above, is taken from authentic sources and highlights pre-issue information. The PE ratio and EPS of Sattva Engineering Construction Limited are subject to change after the IPO. Explore the table below to get post-issue updates on these two metrics.&nbsp;<\/em><\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Indicators<\/strong><\/td><td><strong>Pre-IPO<\/strong><\/td><td><strong>Post-IPO<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/price-to-earnings-ratio-p-e-ratio\"><strong>PE Ratio<\/strong><\/a><\/td><td>10.46<\/td><td>14.34<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/earnings-per-share-eps-formula\"><strong>EPS<\/strong><\/a><strong>&nbsp;<\/strong><\/td><td>7.17<\/td><td>5.23<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sattva_Engineering_Construction_Limited_IPO_Peer_Comparison\"><\/span><strong>Sattva Engineering Construction Limited IPO Peer Comparison<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Company Name<\/strong><\/td><td><strong>EPS<\/strong><\/td><td><strong>P\/E Ratio<\/strong><\/td><td><strong>RoNW<\/strong><\/td><td><strong>Face value<\/strong><\/td><td><strong>Revenue<\/strong><\/td><\/tr><tr><td><strong><a href=\"https:\/\/sattvaengg.in\/\" rel=\"nofollow noopener\" target=\"_blank\">Sattva Engineering &amp; Construction Limited<\/a><\/strong><\/td><td>7.64<\/td><td>10.46<\/td><td>27.10<\/td><td>\u20b910<\/td><td>77.44<\/td><\/tr><tr><td><strong><a href=\"https:\/\/univest.in\/stocks\/emslimited\/ems-ltd-share-price-today\">EMS Limited<\/a><\/strong><\/td><td>33.05<\/td><td>18.23<\/td><td>20.66<\/td><td>\u20b910<\/td><td>809.00<\/td><\/tr><tr><td><strong><a href=\"https:\/\/univest.in\/stocks\/eiel\/enviro-infra-engineers-ltd-share-price-today\">Enviro Infra Engineers Limited<\/a><\/strong><\/td><td>11.76<\/td><td>21.50<\/td><td>27.58<\/td><td>\u20b910<\/td><td>738.00<\/td><\/tr><tr><td><strong><a href=\"https:\/\/univest.in\/stocks\/wabag\/va-tech-wabag-ltd-share-price-today\">Va Tech Wabag Limited<\/a><\/strong><\/td><td>47.48<\/td><td>33.40<\/td><td>14.86<\/td><td>\u20b92<\/td><td>2,900<\/td><\/tr><\/tbody><\/table><\/figure><p><strong><em>Also Read : <a href=\"https:\/\/univest.in\/blogs\/arc-insulation-insulators-ipo-gmp\">ARC Insulation &amp; Insulators IPO GMP: Day 1 IPO Live Updates<\/a><\/em><\/strong><\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs_on_Sattva_Engineering_Construction_IPO\"><\/span><strong>FAQs on Sattva Engineering Construction IPO<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_Sattva_Engineering_Construction_IPO_GMP\"><\/span><strong>What is the Sattva Engineering Construction IPO GMP?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. Currently, on 26th August 2025, the <strong>Sattva Engineering Construction IPO GMP<\/strong> (Grey Market Premium) stands at \u20b917. This indicates that the estimated listing price could be \u20b992 per share.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_issue_price_of_the_Sattva_Engineering_Construction_IPO\"><\/span><strong>What is the issue price of the Sattva Engineering Construction IPO?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. The <strong>Sattva Engineering Construction IPO<\/strong> price is set at \u20b970.00 to \u20b975.00 per share.&nbsp; Retail investors can apply for a minimum of 2 lots consisting of 3,200 shares worth \u20b92,40,000. Moreover, HNIs are required to bid for a minimum of 3 lots (4,800 shares) worth \u20b93,60,000.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Who_is_the_registrar_of_the_Sattva_Engineering_Construction_IPO\"><\/span><strong>Who is the registrar of the Sattva Engineering Construction IPO?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. MUFG Intime India Private Limited is the registrar of the <strong>Sattva Engineering Construction IPO,<\/strong> responsible for managing the IPO allotment procedure and refund initiation. For any queries regarding the Sattva Engineering Construction allotment and refund, you can contact MUFG Intime India Private Limited at <a href=\"mailto:ipo.helpdesk@linkintime.co.in\">ipo.helpdesk@linkintime.co.in<\/a>, +91-22-4918 6270.<\/p><p><strong><em>Disclaimer<\/em><\/strong><em>: The above information is compiled from authentic sources and is just for informational purposes. To have detailed information about the Sattva Engineering Construction IPO, download the Sattva Engineering Construction IPO RHP and Sattva Engineering Construction IPO DRHP. Conduct your research before investing in IPOs to avoid significant losses. You can also consult your financial advisor.<\/em><\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Explore_Other_News_Articles\"><\/span><strong>Explore Other News Articles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><a href=\"https:\/\/univest.in\/blogs\/oval-projects-engineering-ipo\">Oval Projects Engineering IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/best-stocks-to-buy-today-26-aug-2025\">Best Stocks to Buy Today: Explore Best Stocks With Expected Trends<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/abril-paper-tech-ipo\">Abril Paper Tech IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/snehaa-organics-ipo\">Snehaa Organics IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/anondita-medicare-ipo-subscription-status\">Anondita Medicare IPO Subscription Day 2<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/shivashrit-foods-ipo-subscription-status\">Shivashrit Foods IPO Subscription Day 2<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/classic-electrodes-ipo-subscription-status\">Classic Electrodes IPO Subscription Day 2<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>The Sattva Engineering Construction IPO GMP is \u20b917 as of 26th August 2025. It is a bookbuilding IPO of \u20b935.38 crores. This is an entirely fresh issue of 0.47 crore shares. The issue will be listed on NSE and SME on its tentative listing date, 3rd September 2025. The face value of Sattva Engineering Construction<\/p>\n","protected":false},"author":23,"featured_media":47039,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1281],"tags":[2025],"class_list":["post-47032","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-sattva-engineering-construction-ipo-gmp"],"metadata":{"_edit_lock":["1756192895:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_internal_links_processed":["1"],"_edit_last":["23"],"_wp_page_template":["default"],"rank_math_title":["Sattva Engineering Construction IPO GMP Day 1 | Check IPO Details"],"rank_math_description":["Sattva Engineering Construction IPO GMP status. Discover the IPO Price, Date, Subscription Status, Grey Market Premium GMP, Allotment, Listing Date, and Review. Read more!"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"rank_math_focus_keyword":["Sattva Engineering Construction IPO GMP"],"rank_math_primary_category":["1281"],"rank_math_seo_score":["79"],"amazonS3_cache":["a:4:{s:102:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/08\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid.jpg\";a:2:{s:2:\"id\";i:47040;s:11:\"source_type\";s:13:\"media-library\";}s:111:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/08\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1024x536.jpg\";a:2:{s:2:\"id\";i:47040;s:11:\"source_type\";s:13:\"media-library\";}s:134:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid.jpg\";a:2:{s:2:\"id\";i:47040;s:11:\"source_type\";s:13:\"media-library\";}s:143:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124327\/Sattva-Engineering-Construction-IPO-Apply-or-Avoid-1024x536.jpg\";a:2:{s:2:\"id\";i:47040;s:11:\"source_type\";s:13:\"media-library\";}}"],"_thumbnail_id":["47039"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["2884"],"rs_page_bg_color":[""],"rank_math_canonical_url":["https:\/\/univest.in\/blogs\/sattva-engineering-construction-ipo-gmp"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/08\/26124035\/Sattva-Engineering-Construction-IPO-GMP-Day-1.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47032","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=47032"}],"version-history":[{"count":2,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47032\/revisions"}],"predecessor-version":[{"id":47041,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/47032\/revisions\/47041"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/47039"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=47032"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=47032"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=47032"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}