{"id":40895,"date":"2025-05-20T13:29:11","date_gmt":"2025-05-20T07:59:11","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=40895"},"modified":"2025-05-20T13:29:13","modified_gmt":"2025-05-20T07:59:13","slug":"victory-electric-ipo-gmp","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/","title":{"rendered":"Victory Electric IPO GMP: Day 1 IPO Live Updates"},"content":{"rendered":"<p><strong>Victory Electric IPO GMP <\/strong>is \u20b90 as of 20th May 2025. The IPO opens for bidding today, 20th May 2025, and will close on 23rd May 2025. It is a fixed issue consisting of a fresh issue of 56.47 lakh shares worth \u20b940.66 crores. The issue will be listed on NSE and SME on its tentative listing date, 28th May 2025. The issue price for the Victory Electric IPO is set between \u20b972 per share. Retail investors can bid for a minimum lot of 1,600 shares worth \u20b91,15,200.&nbsp;<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Victory_Electric_IPO_GMP_Grey_Market_Premium\" title=\"Victory Electric IPO GMP Grey Market Premium\">Victory Electric IPO GMP Grey Market Premium<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Victory_Electric_IPO_Details\" title=\"Victory Electric IPO Details\">Victory Electric IPO Details<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Explanation\" title=\"Explanation\">Explanation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Objectives_of_Victory_Electric_IPO\" title=\"Objectives of Victory Electric IPO\">Objectives of Victory Electric IPO<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Victory_Electric_IPO_Registrar\" title=\"Victory Electric IPO Registrar&nbsp;\">Victory Electric IPO Registrar&nbsp;<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Victory_Electric_IPO_Review\" title=\"Victory Electric IPO Review\">Victory Electric IPO Review<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Victory_Electric_IPO_Technical_Analysis\" title=\"Victory Electric IPO Technical Analysis\">Victory Electric IPO Technical Analysis<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#FAQs_on_Victory_Electric_IPO\" title=\"FAQs on Victory Electric IPO\">FAQs on Victory Electric IPO<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#What_is_Victory_Electric_IPO_GMP\" title=\"What is Victory Electric IPO GMP?\">What is Victory Electric IPO GMP?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#What_is_the_issue_price_of_Victory_Electric_IPO\" title=\"What is the issue price of Victory Electric IPO?\">What is the issue price of Victory Electric IPO?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Who_is_the_registrar_of_Victory_Electric_IPO\" title=\"Who is the registrar of Victory Electric IPO?\">Who is the registrar of Victory Electric IPO?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Recent_News_Articles\" title=\"Recent News Articles\">Recent News Articles<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/victory-electric-ipo-gmp\/#Other_News_Articles\" title=\"Other News Articles\">Other News Articles<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Victory_Electric_IPO_GMP_Grey_Market_Premium\"><\/span><strong>Victory Electric IPO GMP Grey Market Premium<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>As of 20th May 2025, <strong>Victory Electric IPO GMP <\/strong>stands at \u20b90 per share. Thus, the estimated listing price would be \u20b972 (72+0). This indicates that the estimated listing gain in this IPO could be 0.00%. However, GMP details are subject to change based on market conditions and fluctuations. Explore the table below to learn about recent Victory Electric IPO GMP updates.<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>GMP Date<\/strong><\/td><td><strong>IPO Price<\/strong><\/td><td><strong>GMP<\/strong><\/td><td><strong>Estimated Listing Price&nbsp;<\/strong><\/td><td><strong>Estimated Listing Gains<\/strong><\/td><\/tr><tr><td><strong>20-05-2025<\/strong><\/td><td>\u20b972<\/td><td>0<\/td><td>\u20b972<\/td><td>0%<\/td><\/tr><tr><td><strong>19-05-2025<\/strong><\/td><td>\u20b972<\/td><td>0<\/td><td>\u20b972<\/td><td>0%<\/td><\/tr><tr><td><strong>18-05-2025<\/strong><\/td><td>\u20b972<\/td><td>0<\/td><td>\u20b972<\/td><td>0%<\/td><\/tr><tr><td><strong>17-05-2025<\/strong><\/td><td>\u20b972<\/td><td>0<\/td><td>\u20b972<\/td><td>0%<\/td><\/tr><\/tbody><\/table><\/figure><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Victory_Electric_IPO_Details\"><\/span><strong>Victory Electric IPO Details<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>IPO Open Date<\/strong><\/td><td>20th May 2025<\/td><\/tr><tr><td><strong>IPO Close Date<\/strong><\/td><td>23rd May 2025<\/td><\/tr><tr><td><strong>IPO Allotment Date<\/strong><\/td><td>27th May 2025<\/td><\/tr><tr><td><strong>Refund Initiation&nbsp;<\/strong><\/td><td>27th May 2025<\/td><\/tr><tr><td><strong>Issue Size<\/strong><\/td><td>56,47,000 shares<\/td><\/tr><tr><td><strong>Face Value<\/strong><\/td><td>\u20b95 per share<\/td><\/tr><tr><td><strong>Lot Size<\/strong><\/td><td>1600 shares<\/td><\/tr><tr><td><strong>Issue Price<\/strong><\/td><td>\u20b972 per share<\/td><\/tr><tr><td><strong>Market Makers Portion<\/strong><\/td><td>2,83,800 shares<\/td><\/tr><tr><td><strong>Issue Type<\/strong><\/td><td>Fixed price IPO<\/td><\/tr><tr><td><strong>Listing At<\/strong><\/td><td>NSE SME<\/td><\/tr><tr><td><strong>Listing Date<\/strong><\/td><td>28th May 2025<\/td><\/tr><\/tbody><\/table><\/figure><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Explanation\"><\/span><strong>Explanation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p><strong>Victory Electric IPO<\/strong>: Victory Electric Vehicles Limited has declared an issue price of \u20b972 per share. With this IPO, the company allows retail investors to bid for at least one lot of 1,600 shares worth \u20b91,15,200. The face value of Victory Electric Vehicles Ltd.&#8217;s share is \u20b95 per share. The shares of Victory Electric Vehicles Limited, one of the&nbsp; EV companies in India, will be listed on NSE &amp; SME on its tentative listing day, 28th May 2025. Scroll down to check GMP updates and <strong>Victory Electric IPO<\/strong> reviews.&nbsp;<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Objectives_of_Victory_Electric_IPO\"><\/span><strong>Objectives of Victory Electric IPO<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Victory Electric Vehicles Limited proposed to utilise the proceeds from the fixed price issue in the following objectives.&nbsp;<\/p><ul class=\"wp-block-list\"><li>To meet working capital requirements.<\/li>\n\n<li>To meet general corporate purposes.&nbsp;<\/li>\n\n<li>To fund capital expenditure.<\/li><\/ul><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Victory_Electric_IPO_Registrar\"><\/span><strong>Victory Electric IPO Registrar&nbsp;<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p>Victory Electric IPO is open today, on 20th May 2025, to raise \u20b940.66 crore.&nbsp; Maashitla Securities Private Limited is the registrar of <strong>Victory Electric Vehicles IPO,<\/strong> awaiting to manage the IPO allotment procedure and refund initiation. For any queries regarding Victory Electric Vehicles IPO allotment and refund, you can contact Maashitla Securities Private Limited at <a href=\"https:\/\/maashitla.com\/allotment-status\/public-issues\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/maashitla.com\/allotment-status\/public-issues<\/a> or +91-11-45121795-96.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Victory_Electric_IPO_Review\"><\/span><strong>Victory Electric IPO Review<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1-1024x536.jpg\" alt=\"\" class=\"wp-image-40898\" srcset=\"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1-1024x536.jpg 1024w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1-300x157.jpg 300w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1-768x402.jpg 768w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1-900x471.jpg 900w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1-600x314.jpg 600w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1-150x79.jpg 150w, https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><p>The <strong>Victory Electric Vehicles IPO<\/strong> has gained neutral ratings from industry experts, brokers, and institutional investors. During FY23- 24, Accretion Pharmaceuticals Limited&#8217;s revenue rose 14.93% from \u20b929.53 crores in March 2023 to \u20b933.94 crores in March 2024. Moreover, the company&#8217;s PAT increased by 3,780.00% from \u20b90.10 crores to \u20b93.88 crores.&nbsp; However, industry experts suggest applying for this IPO with a long-term perspective. However, industry experts suggest that investors may park funds in this IPO for the long term.<\/p><p>Most analysts recommend avoiding this IPO to safeguard your investment portfolio in the stock market. However, we\u2019re waiting for further ratings to have a better idea and will keep posting them to deliver real-time insights. Until then, you can explore the company&#8217;s technical analysis to know whether you should apply for the <strong>Victory Electric IPO<\/strong> or not.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Victory_Electric_IPO_Technical_Analysis\"><\/span><strong>Victory Electric IPO Technical Analysis<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Key Indicators<\/strong><\/td><td><strong>Value<\/strong><\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/price-to-earnings-ratio-p-e-ratio\"><strong>PE Ratio (Price-to-Earnings)<\/strong><strong>&nbsp;<\/strong><\/a><\/td><td>23.05<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/earnings-per-share-eps-formula\"><strong>EPS (Earnings Per Share)<\/strong><\/a><\/td><td>3.12<\/td><\/tr><tr><td><strong>RoNW<\/strong><\/td><td>70.19%<\/td><\/tr><tr><td><a href=\"https:\/\/univest.in\/blogs\/return-on-equity\"><strong>ROE<\/strong><\/a><strong> (Return on Equity)<\/strong><\/td><td>70.19%<\/td><\/tr><tr><td><strong>ROCE<\/strong><\/td><td>44.78%<\/td><\/tr><tr><td><strong>PAT Margin (Profit After Tax)<\/strong><\/td><td>10.10<\/td><\/tr><tr><td><strong>Market Capitalisation<\/strong><\/td><td>\u20b9153.41 cr.<\/td><\/tr><\/tbody><\/table><\/figure><p>The PE ratio of Victory Electric Vehicles Limited shares is 23.05, and its Earnings Per Share (EPS) stands at 3.12. The Victory Electric Vehicles IPO can potentially deliver gains on its tentative listing date, 28th May 2025.&nbsp;<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Indicators<\/strong><\/td><td><strong>Pre-IPO<\/strong><\/td><td><strong>Post-IPO<\/strong><\/td><\/tr><tr><td><strong>PE Ratio<\/strong><\/td><td>23.05<\/td><td>29.57<\/td><\/tr><tr><td><strong>EPS&nbsp;<\/strong><\/td><td>3.12<\/td><td>2.44<\/td><\/tr><\/tbody><\/table><\/figure><p><em>For regular stock updates, dividend alerts, and expert verdicts, stay informed with Univest!<\/em><\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs_on_Victory_Electric_IPO\"><\/span><strong>FAQs on Victory Electric IPO<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_Victory_Electric_IPO_GMP\"><\/span><strong>What is Victory Electric IPO GMP?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. Currently, on 20th May 2025, <strong>Victory Electric IPO GMP<\/strong> (Grey Market Premium) stands at \u20b90 (0.00% up). This indicates that the estimated listing price could be \u20b972 per share.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_issue_price_of_Victory_Electric_IPO\"><\/span><strong>What is the issue price of Victory Electric IPO?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. The <strong>Victory Electric IPO<\/strong> price has been set at \u20b972 per share. Retail investors can apply for a minimum and maximum of 1 lot consisting of 1,600 shares worth \u20b91,15,200. Moreover, NIIs are required to bid for a minimum of 2 lots (3,200 shares) worth \u20b92,30,400.<br><\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Who_is_the_registrar_of_Victory_Electric_IPO\"><\/span><strong>Who is the registrar of Victory Electric IPO?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><p>Ans. Maashitla Securities Private Limited is the registrar of <strong>Victory Electric Vehicles IPO,<\/strong> awaiting to manage the IPO allotment procedure and refund initiation. For any queries regarding Victory Electric IPO allotment and refund, you can contact Maashitla Securities Private Limited at <a href=\"https:\/\/maashitla.com\/allotment-status\/public-issues\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/maashitla.com\/allotment-status\/public-issues<\/a> or +91-11-45121795-96.<\/p><p><strong><em>Disclaimer<\/em><\/strong><em>: The above information is compiled from authentic sources and is just for informational purposes. To have detailed information about the Victory Electric IPO, download the Victory Electric Vehicles IPO RHP and Victory Electric Vehicles IPO DRHP. Conduct your own research before investing in IPOs to avoid significant losses. You can also consult your financial advisor.<\/em><\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Recent_News_Articles\"><\/span><strong>Recent News Articles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><a href=\"https:\/\/univest.in\/blogs\/stock-market-today-sensex-fell-152-points\">Stock Market Today: Sensex Fell 152 Points &amp; Nifty50 By 0.19%; Check Key Insights<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/stocks-to-watch-today-20th-may-2025\">Stocks to Watch Today: 20th May 2025 | NLC India, Hindustan Foods, DOMS, Kwality Pharmaceuticals, ACME, &amp; More!<\/a><\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Other_News_Articles\"><\/span><strong>Other News Articles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2><p><a href=\"https:\/\/univest.in\/blogs\/bel-q4-results-2025\">BEL Q4 Results 2025: Q4 PAT Jumps 18.4% to \u20b92,127.02 crores. Dividend Declared @ 0.90 per share.<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/victory-electric-vehicles-ipo\">Victory Electric Vehicles IPO GMP &amp; Review: Apply or Avoid?<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/data-patterns-q4-results-2025\">Data Patterns Q4 Results 2025: Q4 Netprofit Shoots Up By 60% YoY and Revenue Rises 117.35%.<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/divis-lab-q4-results-2025\">Divi\u2019s Lab Q4 Results 2025: Q4 FY25 PAT grows 23% and Revenue Zooms to \u20b92,585 crores; \u20b930\/share Dividend Declared<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/delhivery-q4-results-2025\">Delhivery Q4 Results 2025 | Q4 FY25 PAT at \u20b972.56 Cr; Revenue Rises 5.6% Y-o-Y.<\/a><\/p><p><a href=\"https:\/\/univest.in\/blogs\/small-cap-stocks\">List of Small-Cap Stocks in NSE for 2025<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Victory Electric IPO GMP is \u20b90 as of 20th May 2025. The IPO opens for bidding today, 20th May 2025, and will close on 23rd May 2025. It is a fixed issue consisting of a fresh issue of 56.47 lakh shares worth \u20b940.66 crores. The issue will be listed on NSE and SME on its<\/p>\n","protected":false},"author":23,"featured_media":40897,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[1280],"class_list":["post-40895","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-victory-electric"],"metadata":{"_edit_lock":["1747728082:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_seo_score":["78"],"rank_math_focus_keyword":["Victory Electric IPO GMP"],"rank_math_internal_links_processed":["1"],"_edit_last":["23"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"_wp_page_template":["default"],"rank_math_title":["Victory Electric IPO GMP Day 1 | Check IPO Details"],"rank_math_description":["Check the Victory Electric IPO GMP price. Discover the IPO Price, Date, Subscription Status, Grey Market Premium GMP, Allotment, Listing Date, and Review!"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"rank_math_primary_category":["842"],"rank_math_canonical_url":["https:\/\/univest.in\/blogs\/victory-electric-ipo-gmp"],"amazonS3_cache":["a:4:{s:69:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/05\/victory-iamge-2-1.jpg\";a:2:{s:2:\"id\";i:40898;s:11:\"source_type\";s:13:\"media-library\";}s:78:\"\/\/univest.in\/blogs-2\/wp-content\/uploads\/2025\/05\/victory-iamge-2-1-1024x536.jpg\";a:2:{s:2:\"id\";i:40898;s:11:\"source_type\";s:13:\"media-library\";}s:101:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1.jpg\";a:2:{s:2:\"id\";i:40898;s:11:\"source_type\";s:13:\"media-library\";}s:110:\"\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132903\/victory-iamge-2-1-1024x536.jpg\";a:2:{s:2:\"id\";i:40898;s:11:\"source_type\";s:13:\"media-library\";}}"],"_thumbnail_id":["40897"],"rank_math_analytic_object_id":["1982"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest-blog.storage.googleapis.com\/blogs\/wp-content\/uploads\/2025\/05\/20132819\/victory-image-1-1.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/40895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=40895"}],"version-history":[{"count":2,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/40895\/revisions"}],"predecessor-version":[{"id":40899,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/40895\/revisions\/40899"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/40897"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=40895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=40895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=40895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}