{"id":346540,"date":"2026-11-13T13:26:33","date_gmt":"2026-11-13T07:56:33","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=346540"},"modified":"2026-11-13T13:26:33","modified_gmt":"2026-11-13T07:56:33","slug":"globe-civil-projects-share-price-target-2027","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/","title":{"rendered":"Globe Civil Projects Share Price Target 2027: 8.1% Upside to Rs 42.6, Bull Rs 51.8"},"content":{"rendered":"<p style=\"border-left:4px solid #1F4E79;background:#EBF3FB;padding:10px 16px;font-style:italic;\"><em>Globe Civil Projects share price Rs 39.41 (13 November 2026). Base target Rs 42.6, bull Rs 51.8, downside risk Rs 31.5. PE 9.30. 52W range Rs 33.50 to Rs 80.00.<\/em><\/p>\n<div style=\"background:#F0F9FF;border-left:4px solid #2E7D32;border-radius:6px;padding:14px 18px;margin:18px 0;\">\n<p style=\"margin:0;color:#1F4E79;font-size:14px;\"><strong>Quick Answer<\/strong><\/p>\n<p style=\"margin:8px 0 0;\">The Globe Civil Projects share price target for 2027 is Rs 42.6, about 8.1% above the current price of Rs 39.41. The bull case is Rs 51.8, and the downside risk level, which is not a target, is Rs 31.5. The base case assumes earnings per share grow 8.1% a year, the pace seen from FY24 to FY26, with the stock holding its PE of 9.30. These are model-based estimates built from reported financials, not guaranteed outcomes.<\/p>\n<\/p><\/div>\n<p>Investors weighing a Globe Civil Projects target price for 2027 should start with where the stock sits today. At Rs 39.41 on 13 November 2026, it is 50.7% below its 52-week high of Rs 80.00 and 17.6% above its 52-week low of Rs 33.50. That range spans 139% from low to high, so the entry point matters as much as the Globe Civil Projects price forecast itself.<\/p>\n<p>This article builds the Globe Civil Projects share price target from reported numbers only: five years of annual results, the last five quarters, the latest shareholding pattern and current valuation ratios from company filings and exchange data. Each scenario states its assumptions, so you can trace how the base case, the bull case and the downside risk level were reached and test them against your own view.<\/p>\n<p style=\"margin-top:24px;\"><a href=\"https:\/\/univest.in\/user\/log-in?utm_source=blogs&amp;utm_medium=globe-civil-projects-share-price-target-2027\"><strong>Click Here &#8211; Get Free Investment Predictions<\/strong><\/a><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Globe_Civil_Projects_Stock_Analysis_Company_Overview_and_Key_Stats\" title=\"Globe Civil Projects Stock Analysis: Company Overview and Key Stats\">Globe Civil Projects Stock Analysis: Company Overview and Key Stats<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Why_Is_Globe_Civil_Projects_Share_Price_Target_Set_at_Rs_426_for_2027\" title=\"Why Is Globe Civil Projects Share Price Target Set at Rs 42.6 for 2027?\">Why Is Globe Civil Projects Share Price Target Set at Rs 42.6 for 2027?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Earnings_Growth_Behind_the_Globe_Civil_Projects_Target_Price_Five_Years_of_Results\" title=\"Earnings Growth Behind the Globe Civil Projects Target Price: Five Years of Results\">Earnings Growth Behind the Globe Civil Projects Target Price: Five Years of Results<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Margins_and_the_Latest_Quarter\" title=\"Margins and the Latest Quarter\">Margins and the Latest Quarter<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Balance_Sheet_and_Cash_Flow\" title=\"Balance Sheet and Cash Flow\">Balance Sheet and Cash Flow<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Valuation_Check_for_the_Globe_Civil_Projects_Stock_Target_PE_Price_to_Book_and_ROE\" title=\"Valuation Check for the Globe Civil Projects Stock Target: PE, Price to Book and ROE\">Valuation Check for the Globe Civil Projects Stock Target: PE, Price to Book and ROE<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Shareholding_Pattern_and_Institutional_Holding\" title=\"Shareholding Pattern and Institutional Holding\">Shareholding Pattern and Institutional Holding<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Globe_Civil_Projects_Share_Price_Targets_for_the_Short_Term_and_12_Months\" title=\"Globe Civil Projects Share Price Targets for the Short Term and 12 Months\">Globe Civil Projects Share Price Targets for the Short Term and 12 Months<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Short_Term_Globe_Civil_Projects_Stock_Target_Levels_Technical_Setup\" title=\"Short Term Globe Civil Projects Stock Target Levels: Technical Setup\">Short Term Globe Civil Projects Stock Target Levels: Technical Setup<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#12_Month_Globe_Civil_Projects_Target_Price_for_2027\" title=\"12 Month Globe Civil Projects Target Price for 2027\">12 Month Globe Civil Projects Target Price for 2027<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#How_EPS_Growth_and_PE_Multiple_Change_the_Globe_Civil_Projects_Target_Price\" title=\"How EPS Growth and PE Multiple Change the Globe Civil Projects Target Price\">How EPS Growth and PE Multiple Change the Globe Civil Projects Target Price<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Bull_Case_and_Downside_Risk_for_Globe_Civil_Projects_Stock_Target_in_2027\" title=\"Bull Case and Downside Risk for Globe Civil Projects Stock Target in 2027\">Bull Case and Downside Risk for Globe Civil Projects Stock Target in 2027<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Bull_Case_Rs_518\" title=\"Bull Case Rs 51.8\">Bull Case Rs 51.8<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Downside_Risk_Level_Rs_315\" title=\"Downside Risk Level Rs 31.5\">Downside Risk Level Rs 31.5<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Key_Risks_to_the_Globe_Civil_Projects_Target_Price_for_2027\" title=\"Key Risks to the Globe Civil Projects Target Price for 2027\">Key Risks to the Globe Civil Projects Target Price for 2027<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Growth_Slowdown_Risk_for_the_Globe_Civil_Projects_Price_Target\" title=\"Growth Slowdown Risk for the Globe Civil Projects Price Target\">Growth Slowdown Risk for the Globe Civil Projects Price Target<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Liquidity_and_Size_Risk\" title=\"Liquidity and Size Risk\">Liquidity and Size Risk<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Valuation_and_Margin_Risk\" title=\"Valuation and Margin Risk\">Valuation and Margin Risk<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Market_and_Technical_Risk\" title=\"Market and Technical Risk\">Market and Technical Risk<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#How_to_Invest_in_Globe_Civil_Projects\" title=\"How to Invest in Globe Civil Projects\">How to Invest in Globe Civil Projects<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#FAQs_on_Globe_Civil_Projects_Share_Price_Target_2027\" title=\"FAQs on Globe Civil Projects Share Price Target 2027\">FAQs on Globe Civil Projects Share Price Target 2027<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#What_is_the_Globe_Civil_Projects_share_price_target_for_2027\" title=\"What is the Globe Civil Projects share price target for 2027?\">What is the Globe Civil Projects share price target for 2027?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#What_is_the_Globe_Civil_Projects_share_price_today\" title=\"What is the Globe Civil Projects share price today?\">What is the Globe Civil Projects share price today?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Is_Globe_Civil_Projects_a_buy_or_sell_at_the_current_price\" title=\"Is Globe Civil Projects a buy or sell at the current price?\">Is Globe Civil Projects a buy or sell at the current price?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#What_are_the_bull_case_target_and_downside_risk_level_for_Globe_Civil_Projects_shares\" title=\"What are the bull case target and downside risk level for Globe Civil Projects shares?\">What are the bull case target and downside risk level for Globe Civil Projects shares?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#What_are_the_main_risks_to_the_Globe_Civil_Projects_price_target\" title=\"What are the main risks to the Globe Civil Projects price target?\">What are the main risks to the Globe Civil Projects price target?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#What_is_the_PE_ratio_of_Globe_Civil_Projects_and_how_does_it_compare_with_the_industry\" title=\"What is the PE ratio of Globe Civil Projects and how does it compare with the industry?\">What is the PE ratio of Globe Civil Projects and how does it compare with the industry?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#Who_owns_Globe_Civil_Projects_and_what_is_the_promoter_holding\" title=\"Who owns Globe Civil Projects, and what is the promoter holding?\">Who owns Globe Civil Projects, and what is the promoter holding?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/univest.in\/blogs-2\/globe-civil-projects-share-price-target-2027\/#What_were_Globe_Civil_Projects_latest_quarterly_results\" title=\"What were Globe Civil Projects&#8217; latest quarterly results?\">What were Globe Civil Projects&#8217; latest quarterly results?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Globe_Civil_Projects_Stock_Analysis_Company_Overview_and_Key_Stats\"><\/span><strong>Globe Civil Projects Stock Analysis: Company Overview and Key Stats<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Globe Civil Projects (NSE: GLOBECIVIL) has a market capitalisation of Rs 235.00 crore. In FY26 it reported revenue of Rs 409.04 crore and net profit of Rs 23.30 crore. The table collects the figures the Globe Civil Projects share price target is built on.<\/p>\n<table style=\"border-collapse:collapse;width:100%;\" border=\"1\" cellpadding=\"8\">\n<tr>\n<th>Metric<\/th>\n<th>Value<\/th>\n<\/tr>\n<tr>\n<td>Company<\/td>\n<td><a href=\"https:\/\/univest.in\/stocks\/globecivil\/globe-civil-projects-ltd-share-price-today\">Globe Civil Projects<\/a><\/td>\n<\/tr>\n<tr>\n<td>NSE Ticker<\/td>\n<td>GLOBECIVIL<\/td>\n<\/tr>\n<tr>\n<td>CMP (13 November 2026)<\/td>\n<td>Rs 39.41<\/td>\n<\/tr>\n<tr>\n<td>52-Week High<\/td>\n<td>Rs 80.00<\/td>\n<\/tr>\n<tr>\n<td>52-Week Low<\/td>\n<td>Rs 33.50<\/td>\n<\/tr>\n<tr>\n<td>Market Cap<\/td>\n<td>Rs 235.00 crore<\/td>\n<\/tr>\n<tr>\n<td>PE Ratio (TTM)<\/td>\n<td>9.30<\/td>\n<\/tr>\n<tr>\n<td>Industry PE<\/td>\n<td>23.79<\/td>\n<\/tr>\n<tr>\n<td>Price to Book<\/td>\n<td>0.99<\/td>\n<\/tr>\n<tr>\n<td>Return on Equity<\/td>\n<td>9.79%<\/td>\n<\/tr>\n<tr>\n<td>Debt to Equity<\/td>\n<td>0.63<\/td>\n<\/tr>\n<tr>\n<td>EPS (TTM)<\/td>\n<td>Rs 4.24<\/td>\n<\/tr>\n<tr>\n<td>Dividend Yield<\/td>\n<td>0.00%<\/td>\n<\/tr>\n<tr>\n<td>12-Month Base Target<\/td>\n<td>Rs 42.6<\/td>\n<\/tr>\n<tr>\n<td>Bull Case<\/td>\n<td>Rs 51.8<\/td>\n<\/tr>\n<tr>\n<td>Downside Risk Level (not a target)<\/td>\n<td>Rs 31.5<\/td>\n<\/tr>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Why_Is_Globe_Civil_Projects_Share_Price_Target_Set_at_Rs_426_for_2027\"><\/span><strong>Why Is Globe Civil Projects Share Price Target Set at Rs 42.6 for 2027?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The arithmetic is short. Trailing EPS of Rs 4.24 grown for one year gives a forward EPS estimate of Rs 4.58, and multiplying it by the unchanged PE of 9.30 gives the Rs 42.6 base-case Globe Civil Projects stock target. The bull case adds faster earnings growth and a higher multiple, while the downside risk level assumes flat earnings and a lower multiple.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Earnings_Growth_Behind_the_Globe_Civil_Projects_Target_Price_Five_Years_of_Results\"><\/span><strong>Earnings Growth Behind the Globe Civil Projects Target Price: Five Years of Results<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Globe Civil Projects grew revenue from Rs 286.78 crore in FY22 to Rs 409.04 crore in FY26, a compound annual growth rate of 9.3%. Net profit grew faster, from Rs 5.20 crore to Rs 23.30 crore (45.5% a year), which shows margin gains did part of the work and not just higher sales.<\/p>\n<table style=\"border-collapse:collapse;width:100%;\" border=\"1\" cellpadding=\"8\">\n<tr>\n<th>Financial Year<\/th>\n<th>Revenue (Rs Cr)<\/th>\n<th>Net Profit (Rs Cr)<\/th>\n<th>EPS (Rs)<\/th>\n<th>Dividend per Share (Rs)<\/th>\n<\/tr>\n<tr>\n<td>FY22<\/td>\n<td>286.78<\/td>\n<td>5.20<\/td>\n<td>1.21<\/td>\n<td>0.00<\/td>\n<\/tr>\n<tr>\n<td>FY23<\/td>\n<td>235.17<\/td>\n<td>4.85<\/td>\n<td>1.13<\/td>\n<td>0.00<\/td>\n<\/tr>\n<tr>\n<td>FY24<\/td>\n<td>334.81<\/td>\n<td>15.38<\/td>\n<td>3.58<\/td>\n<td>0.00<\/td>\n<\/tr>\n<tr>\n<td>FY25<\/td>\n<td>381.57<\/td>\n<td>24.05<\/td>\n<td>5.52<\/td>\n<td>0.00<\/td>\n<\/tr>\n<tr>\n<td>FY26<\/td>\n<td>409.04<\/td>\n<td>23.30<\/td>\n<td>4.18<\/td>\n<td>0.00<\/td>\n<\/tr>\n<\/table>\n<p>FY26 revenue growth was 7.2%, slower than the four-year average of 9.3%, and net profit moved down 3.1%. EPS rose from Rs 3.58 in FY24 to Rs 4.18 in FY26. The FY27 outlook for the Globe Civil Projects price target depends on whether that EPS estimate keeps compounding.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Margins_and_the_Latest_Quarter\"><\/span><strong>Margins and the Latest Quarter<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Globe Civil Projects converted 5.7% of FY26 revenue into net profit, against 6.3% in FY25, within a five-year range of 1.8% to 6.3%. EBITDA margin was 14.0% in FY26 versus 14.8% in FY25.<\/p>\n<p>In the June 2026 quarter, revenue was Rs 92.92 crore, up 37.3% from the same quarter a year earlier, while net profit of Rs 7.09 crore was up 40.4%. EBITDA came in at Rs 15.80 crore, up 33.0% year on year. The next quarterly result is the first test of whether the earnings assumption behind the Globe Civil Projects stock target holds.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Balance_Sheet_and_Cash_Flow\"><\/span><strong>Balance Sheet and Cash Flow<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Debt to equity stands at 0.63, and shareholders&#8217; equity grew from Rs 57.45 crore in FY22 to Rs 237.87 crore in FY26. Operating cash flow in FY26 was negative at Rs 54.07 crore against capital expenditure of Rs 20.81 crore, leaving negative free cash flow of Rs 74.88 crore. In FY25 free cash flow was negative at Rs 12.51 crore.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Valuation_Check_for_the_Globe_Civil_Projects_Stock_Target_PE_Price_to_Book_and_ROE\"><\/span><strong>Valuation Check for the Globe Civil Projects Stock Target: PE, Price to Book and ROE<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>At a PE of 9.30 against an industry PE of 23.79, Globe Civil Projects trades at a discount to its industry. Price to book is 0.99 on a book value of Rs 39.83 per share, and return on equity is 9.79%. A PE of 9.30 equals an earnings yield of 10.8%, and the FY26 dividend of Rs 0.00 per share gives a yield of 0.00%.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Shareholding_Pattern_and_Institutional_Holding\"><\/span><strong>Shareholding Pattern and Institutional Holding<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Promoters held 63.44% of Globe Civil Projects in September 2026, and promoter holding has stayed near 63.44% since September 2025. Foreign institutional investors (FII) held 0.92% and domestic institutions (DII) held 6.18%, which puts total institutional holding at 7.10%. FII holding fell from 2.00% in September 2025 to 0.92% in September 2026. Public shareholders own the remaining 29.47%.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Globe_Civil_Projects_Share_Price_Targets_for_the_Short_Term_and_12_Months\"><\/span><strong>Globe Civil Projects Share Price Targets for the Short Term and 12 Months<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Short_Term_Globe_Civil_Projects_Stock_Target_Levels_Technical_Setup\"><\/span><strong>Short Term Globe Civil Projects Stock Target Levels: Technical Setup<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>At Rs 39.41 on 13 November 2026, Globe Civil Projects trades below its 50-day simple moving average of Rs 41.10 and below its 200-day exponential moving average of Rs 46.75. The 14-day RSI reads 61.6, which is neutral territory, and the MACD line sits above its signal line. The nearest resistance level is Rs 41.10 (50-day simple moving average) and the nearest support is Rs 33.50 (52-week low). A sustained move above Rs 41.10 would improve the short-term setup, while a close below Rs 33.50 would shift attention to the next support.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"12_Month_Globe_Civil_Projects_Target_Price_for_2027\"><\/span><strong>12 Month Globe Civil Projects Target Price for 2027<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The 12-month target of Rs 42.6 means a move of 8.1% up from Rs 39.41 over the next 12 months. It would still leave the stock 46.8% below its 52-week high of Rs 80.00. Anyone checking the Globe Civil Projects share price target against their own view should focus on two inputs: the EPS estimate and the PE multiple.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_EPS_Growth_and_PE_Multiple_Change_the_Globe_Civil_Projects_Target_Price\"><\/span><strong>How EPS Growth and PE Multiple Change the Globe Civil Projects Target Price<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<table style=\"border-collapse:collapse;width:100%;\" border=\"1\" cellpadding=\"8\">\n<tr>\n<th>EPS Growth<\/th>\n<th>PE 7.44<\/th>\n<th>PE 9.30<\/th>\n<th>PE 10.70<\/th>\n<\/tr>\n<tr>\n<td>0.0% (EPS Rs 4.24)<\/td>\n<td>Rs 31.5<\/td>\n<td>Rs 39.4<\/td>\n<td>Rs 45.4<\/td>\n<\/tr>\n<tr>\n<td>8.1% (EPS Rs 4.58)<\/td>\n<td>Rs 34.1<\/td>\n<td>Rs 42.6<\/td>\n<td>Rs 49.0<\/td>\n<\/tr>\n<tr>\n<td>14.1% (EPS Rs 4.84)<\/td>\n<td>Rs 36.0<\/td>\n<td>Rs 45.0<\/td>\n<td>Rs 51.8<\/td>\n<\/tr>\n<\/table>\n<p>Each cell multiplies the forward EPS estimate by the PE shown. Reading across a row shows what a de-rating or re-rating does to the Globe Civil Projects price forecast, and reading down a column shows what earnings growth is worth at a fixed multiple.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Bull_Case_and_Downside_Risk_for_Globe_Civil_Projects_Stock_Target_in_2027\"><\/span><strong>Bull Case and Downside Risk for Globe Civil Projects Stock Target in 2027<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Bull_Case_Rs_518\"><\/span><strong>Bull Case Rs 51.8<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The bull case Globe Civil Projects price target needs EPS growth of 14.1%, which lifts forward EPS to Rs 4.84, and a PE multiple that rises 15% to 10.70. That gives Rs 51.8, 31.4% above the current price and below the 52-week high of Rs 80.00.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Downside_Risk_Level_Rs_315\"><\/span><strong>Downside Risk Level Rs 31.5<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The downside risk level is not a target. It assumes EPS stays flat at Rs 4.24 and the PE falls 20% to 7.44. That gives Rs 31.5, 20.1% below the current price and below the 52-week low of Rs 33.50.<\/p>\n<table style=\"border-collapse:collapse;width:100%;\" border=\"1\" cellpadding=\"8\">\n<tr>\n<th>Scenario<\/th>\n<th>EPS Growth<\/th>\n<th>PE Multiple<\/th>\n<th>Price (Rs)<\/th>\n<th>Change vs CMP<\/th>\n<\/tr>\n<tr>\n<td>Bull Case<\/td>\n<td>14.1%<\/td>\n<td>10.70<\/td>\n<td>Rs 51.8<\/td>\n<td>+31.4%<\/td>\n<\/tr>\n<tr>\n<td>Base Case<\/td>\n<td>8.1%<\/td>\n<td>9.30<\/td>\n<td>Rs 42.6<\/td>\n<td>+8.1%<\/td>\n<\/tr>\n<tr>\n<td>Downside Risk<\/td>\n<td>0.0%<\/td>\n<td>7.44<\/td>\n<td>Rs 31.5<\/td>\n<td>-20.1%<\/td>\n<\/tr>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Key_Risks_to_the_Globe_Civil_Projects_Target_Price_for_2027\"><\/span><strong>Key Risks to the Globe Civil Projects Target Price for 2027<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Growth_Slowdown_Risk_for_the_Globe_Civil_Projects_Price_Target\"><\/span><strong>Growth Slowdown Risk for the Globe Civil Projects Price Target<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Revenue in the June 2026 quarter was up 37.3% year on year, and FY26 revenue growth was 7.2%. If growth slows from here, the EPS estimate behind the Globe Civil Projects stock target will need revising.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Liquidity_and_Size_Risk\"><\/span><strong>Liquidity and Size Risk<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Globe Civil Projects has a market capitalisation of Rs 235.00 crore. Institutional holding is 7.10%, and promoters hold 63.44%. Stocks of this size can move sharply on small volumes, and exits can take longer than entries.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Valuation_and_Margin_Risk\"><\/span><strong>Valuation and Margin Risk<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Net margin was 5.7% in FY26, so a small slip in costs moves profit noticeably. At a PE of 9.30 versus an industry PE of 23.79, a de-rating toward the downside-risk PE of 7.44 would cut the price even if earnings hold.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Market_and_Technical_Risk\"><\/span><strong>Market and Technical Risk<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Technical indicators add short-term risk: the 14-day RSI is 61.6 and the MACD sits above its signal line. A broad fall in the <a href=\"https:\/\/univest.in\/indices\/nifty-50\/nifty-50-share-price-today\">Nifty 50<\/a> or the <a href=\"https:\/\/univest.in\/indices\/sensex\/sensex-share-price-today\">Sensex<\/a> can override company fundamentals for weeks at a time.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_to_Invest_in_Globe_Civil_Projects\"><\/span><strong>How to Invest in Globe Civil Projects<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Start with the live price and volume. Any Globe Civil Projects share price target is only as current as the data behind it, and the data here is as of 13 November 2026, so refresh the Rs 39.41 price before acting on any level.<\/p>\n<p>Next, review the fundamentals yourself. The Univest Screener lets you check Globe Civil Projects&#8217; PE, ROE, debt and shareholding in one place.<\/p>\n<p style=\"margin-top:24px;\"><a href=\"https:\/\/univest.in\/screeners\"><strong>Check Globe Civil Projects fundamentals on the Univest Screener<\/strong><\/a><\/p>\n<p>Then compare the three Globe Civil Projects target price scenarios with your own view. If you expect EPS growth below 8.1%, the base case is too optimistic for you; if you expect more, the bull case deserves weight.<\/p>\n<p>Decide your position size and exit levels before you buy. The support and resistance levels above can serve as reference points, but they are not recommendations.<\/p>\n<p>Finally, place the order through a SEBI-registered broker or the Univest app, and review the position after each quarterly result. Consult a SEBI-registered advisor if you are unsure.<\/p>\n<p style=\"margin-top:24px;\"><em>Download the <a href=\"http:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\">Univest iOS App<\/a> or <a href=\"http:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&#038;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\">Univest Android App<\/a> to track Globe Civil Projects live price and get daily stock recommendations.<\/em><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The Globe Civil Projects share price target for 2027 is Rs 42.6 in the base case, with Rs 51.8 as the bull case. The support for that view is arithmetic you can check: EPS grew 8.1% a year over FY24 to FY26, and the stock trades at a PE of 9.30. The risks are equally concrete, including a net margin of just 5.7% that leaves profit sensitive to costs and a downside scenario that cuts the price 20% if earnings stall. Use these numbers as a framework for judging the Globe Civil Projects price target, check them against the latest filings, and size any position to your own risk appetite.<\/p>\n<div style=\"background:#CC0000;border-radius:8px;padding:16px 20px;margin:24px 0;\">\n<p style=\"color:#FFFFFF;font-size:13px;line-height:1.7;margin:0;\"><strong style=\"color:#FFFFFF;\">Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data with the official NSE (nseindia.com) and BSE (bseindia.com) websites before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).<\/p>\n<\/p><\/div>\n<h2><span class=\"ez-toc-section\" id=\"FAQs_on_Globe_Civil_Projects_Share_Price_Target_2027\"><\/span><strong>FAQs on Globe Civil Projects Share Price Target 2027<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_Globe_Civil_Projects_share_price_target_for_2027\"><\/span><strong>What is the Globe Civil Projects share price target for 2027?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The base-case Globe Civil Projects share price target for 2027 is Rs 42.6, which is 8.1% above the price of Rs 39.41 on 13 November 2026. The bull case is Rs 51.8 and the downside risk level, which is not a target, is Rs 31.5. All three come from one method: forward EPS multiplied by a PE multiple, using only reported results. They are model estimates and not guaranteed outcomes, and the next quarterly result is the first check on the EPS assumption.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_Globe_Civil_Projects_share_price_today\"><\/span><strong>What is the Globe Civil Projects share price today?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> As of 13 November 2026, 9:21 AM IST, Globe Civil Projects (NSE: GLOBECIVIL) trades at Rs 39.41, down 2.52% on the day. That is 50.7% below the 52-week high of Rs 80.00 and 17.6% above the 52-week low of Rs 33.50. The market capitalisation of Rs 235.00 crore places it among small-cap stocks. Prices change through the trading session, so check the live quote before acting on any level in this article.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Is_Globe_Civil_Projects_a_buy_or_sell_at_the_current_price\"><\/span><strong>Is Globe Civil Projects a buy or sell at the current price?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The data points both ways. On the positive side, EPS has grown 8.1% a year over FY24 to FY26 and the base case implies 8.1% upside; on the cautious side, the net margin is a thin 5.7%, and the downside risk level of Rs 31.5 is 20% below the current price. Whether Globe Civil Projects fits your portfolio depends on your time horizon, position size and risk appetite. Consult a SEBI-registered advisor before investing, as this article is not investment advice.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_are_the_bull_case_target_and_downside_risk_level_for_Globe_Civil_Projects_shares\"><\/span><strong>What are the bull case target and downside risk level for Globe Civil Projects shares?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The bull case in the Globe Civil Projects share price target for 2027 is Rs 51.8, which assumes 14.1% EPS growth and a PE of 10.70, a 15% re-rating from today&#8217;s multiple. That is 31.4% above the current price and below the 52-week high of Rs 80.00. The downside risk level is Rs 31.5, which assumes flat EPS and a PE of 7.44, 20% lower than today. It sits 20.1% below the current price and below the 52-week low of Rs 33.50, and it marks a risk to watch, not a target.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_are_the_main_risks_to_the_Globe_Civil_Projects_price_target\"><\/span><strong>What are the main risks to the Globe Civil Projects price target?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Four risks matter most for the Globe Civil Projects share price target: slower revenue or profit growth, a PE de-rating, thin liquidity or size risk, and weakness in the broader market. With a market capitalisation of Rs 235.00 crore, the stock can move sharply on small volumes, and exits can take longer than entries. A fall to the downside-risk PE of 7.44 would cut the price even if earnings hold.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_PE_ratio_of_Globe_Civil_Projects_and_how_does_it_compare_with_the_industry\"><\/span><strong>What is the PE ratio of Globe Civil Projects and how does it compare with the industry?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The PE ratio of Globe Civil Projects is 9.30, against an industry PE of 23.79, which is a discount to the industry. Price to book is 0.99 and return on equity is 9.79%, and the PE equals an earnings yield of 10.8%. The base case holds the PE unchanged, so the Globe Civil Projects share price target moves only with earnings, while the bull and downside scenarios change the multiple by +15% and -20%.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Who_owns_Globe_Civil_Projects_and_what_is_the_promoter_holding\"><\/span><strong>Who owns Globe Civil Projects, and what is the promoter holding?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Promoters held 63.44% of Globe Civil Projects in September 2026. FII held 0.92%, DII held 6.18% and the public held 29.47%. Together the two institutional groups hold 7.10%. Shareholding is filed every quarter, so it is worth rechecking after each result.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_were_Globe_Civil_Projects_latest_quarterly_results\"><\/span><strong>What were Globe Civil Projects&#8217; latest quarterly results?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> In the June 2026 quarter, Globe Civil Projects reported revenue of Rs 92.92 crore (up 37.3% year on year) and net profit of Rs 7.09 crore (up 40.4%). For comparison, FY26 full-year revenue growth was 7.2% and net profit moved down 3.1%. Each new quarter either supports or weakens the EPS growth of 8.1% assumed in the base case.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is the Globe Civil Projects share price target for 2027?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The base-case Globe Civil Projects share price target for 2027 is Rs 42.6, which is 8.1% above the price of Rs 39.41 on 13 November 2026. The bull case is Rs 51.8 and the downside risk level, which is not a target, is Rs 31.5. All three come from one method: forward EPS multiplied by a PE multiple, using only reported results. They are model estimates and not guaranteed outcomes, and the next quarterly result is the first check on the EPS assumption.\"}},{\"@type\":\"Question\",\"name\":\"What is the Globe Civil Projects share price today?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"As of 13 November 2026, 9:21 AM IST, Globe Civil Projects (NSE: GLOBECIVIL) trades at Rs 39.41, down 2.52% on the day. That is 50.7% below the 52-week high of Rs 80.00 and 17.6% above the 52-week low of Rs 33.50. The market capitalisation of Rs 235.00 crore places it among small-cap stocks. Prices change through the trading session, so check the live quote before acting on any level in this article.\"}},{\"@type\":\"Question\",\"name\":\"Is Globe Civil Projects a buy or sell at the current price?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The data points both ways. On the positive side, EPS has grown 8.1% a year over FY24 to FY26 and the base case implies 8.1% upside; on the cautious side, the net margin is a thin 5.7%, and the downside risk level of Rs 31.5 is 20% below the current price. Whether Globe Civil Projects fits your portfolio depends on your time horizon, position size and risk appetite. Consult a SEBI-registered advisor before investing, as this article is not investment advice.\"}},{\"@type\":\"Question\",\"name\":\"What are the bull case target and downside risk level for Globe Civil Projects shares?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The bull case in the Globe Civil Projects share price target for 2027 is Rs 51.8, which assumes 14.1% EPS growth and a PE of 10.70, a 15% re-rating from today's multiple. That is 31.4% above the current price and below the 52-week high of Rs 80.00. The downside risk level is Rs 31.5, which assumes flat EPS and a PE of 7.44, 20% lower than today. It sits 20.1% below the current price and below the 52-week low of Rs 33.50, and it marks a risk to watch, not a target.\"}},{\"@type\":\"Question\",\"name\":\"What are the main risks to the Globe Civil Projects price target?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Four risks matter most for the Globe Civil Projects share price target: slower revenue or profit growth, a PE de-rating, thin liquidity or size risk, and weakness in the broader market. With a market capitalisation of Rs 235.00 crore, the stock can move sharply on small volumes, and exits can take longer than entries. A fall to the downside-risk PE of 7.44 would cut the price even if earnings hold.\"}},{\"@type\":\"Question\",\"name\":\"What is the PE ratio of Globe Civil Projects and how does it compare with the industry?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The PE ratio of Globe Civil Projects is 9.30, against an industry PE of 23.79, which is a discount to the industry. Price to book is 0.99 and return on equity is 9.79%, and the PE equals an earnings yield of 10.8%. The base case holds the PE unchanged, so the Globe Civil Projects share price target moves only with earnings, while the bull and downside scenarios change the multiple by +15% and -20%.\"}},{\"@type\":\"Question\",\"name\":\"Who owns Globe Civil Projects, and what is the promoter holding?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Promoters held 63.44% of Globe Civil Projects in September 2026. FII held 0.92%, DII held 6.18% and the public held 29.47%. Together the two institutional groups hold 7.10%. Shareholding is filed every quarter, so it is worth rechecking after each result.\"}},{\"@type\":\"Question\",\"name\":\"What were Globe Civil Projects' latest quarterly results?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"In the June 2026 quarter, Globe Civil Projects reported revenue of Rs 92.92 crore (up 37.3% year on year) and net profit of Rs 7.09 crore (up 40.4%). For comparison, FY26 full-year revenue growth was 7.2% and net profit moved down 3.1%. Each new quarter either supports or weakens the EPS growth of 8.1% assumed in the base case.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Globe Civil Projects share price target 2027: base Rs 42.6, bull Rs 51.8, downside risk level Rs 31.5, built from reported earnings, valuation and shareholding data.<\/p>\n","protected":false},"author":38,"featured_media":346539,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[1019],"class_list":["post-346540","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-market","tag-stock-market"],"metadata":{"rank_math_internal_links_processed":["1"],"_thumbnail_id":["346539"],"rank_math_title":["Globe Civil Projects Share Price Target 2027: 8.1% Upside"],"rank_math_description":["The Globe Civil Projects share price target for 2027 is Rs 42.6 against a price of Rs 39.41. Bull case, downside risk, earnings trend and risks explained. November 2026."],"rank_math_focus_keyword":["Globe Civil Projects share price target | Density Target: 1.2 to 1.5%"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/11\/globe-civil-projects-share-price-target-2027-8-1-upside-to-rs-42-6-bull-rs-51-8.webp","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/346540","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/38"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=346540"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/346540\/revisions"}],"predecessor-version":[{"id":346541,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/346540\/revisions\/346541"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/346539"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=346540"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=346540"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=346540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}