{"id":346525,"date":"2026-11-13T13:24:12","date_gmt":"2026-11-13T07:54:12","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=346525"},"modified":"2026-11-13T13:24:12","modified_gmt":"2026-11-13T07:54:12","slug":"capacit-e-infraprojects-share-price-target-2027","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/","title":{"rendered":"Capacit&#8217;e Infraprojects Share Price Target 2027: 21.9% Upside to Rs 214, Bull Rs 258"},"content":{"rendered":"<p style=\"border-left:4px solid #1F4E79;background:#EBF3FB;padding:10px 16px;font-style:italic;\"><em>Capacit&#8217;e Infraprojects share price Rs 175.56 (13 November 2026). Base target Rs 214, bull Rs 258, downside risk Rs 144. PE 8.33. 52W range Rs 144.20 to Rs 314.25.<\/em><\/p>\n<div style=\"background:#F0F9FF;border-left:4px solid #2E7D32;border-radius:6px;padding:14px 18px;margin:18px 0;\">\n<p style=\"margin:0;color:#1F4E79;font-size:14px;\"><strong>Quick Answer<\/strong><\/p>\n<p style=\"margin:8px 0 0;\">The Capacit&#8217;e Infraprojects share price target for 2027 is Rs 214, about 21.9% above the current price of Rs 175.56. The bull case is Rs 258, and the downside risk level, which is not a target, is Rs 144. The base case assumes earnings per share grow 19.1% a year, the pace seen from FY24 to FY26, with the stock holding its PE of 8.33. These are model-based estimates built from reported financials, not guaranteed outcomes.<\/p>\n<\/p><\/div>\n<p>Investors weighing a Capacit&#8217;e Infraprojects target price for 2027 should start with where the stock sits today. At Rs 175.56 on 13 November 2026, it is 44.1% below its 52-week high of Rs 314.25 and 21.7% above its 52-week low of Rs 144.20. That range spans 118% from low to high, so the entry point matters as much as the Capacit&#8217;e Infraprojects price forecast itself.<\/p>\n<p>This article builds the Capacit&#8217;e Infraprojects share price target from reported numbers only: five years of annual results, the last five quarters, the latest shareholding pattern and current valuation ratios from company filings and exchange data. Each scenario states its assumptions, so you can trace how the base case, the bull case and the downside risk level were reached and test them against your own view.<\/p>\n<p style=\"margin-top:24px;\"><a href=\"https:\/\/univest.in\/user\/log-in?utm_source=blogs&amp;utm_medium=capacit-e-infraprojects-share-price-target-2027\"><strong>Click Here &#8211; Get Free Investment Predictions<\/strong><\/a><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Capacite_Infraprojects_Stock_Analysis_Company_Overview_and_Key_Stats\" title=\"Capacit&#8217;e Infraprojects Stock Analysis: Company Overview and Key Stats\">Capacit&#8217;e Infraprojects Stock Analysis: Company Overview and Key Stats<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Why_Is_Capacite_Infraprojects_Share_Price_Target_Set_at_Rs_214_for_2027\" title=\"Why Is Capacit&#8217;e Infraprojects Share Price Target Set at Rs 214 for 2027?\">Why Is Capacit&#8217;e Infraprojects Share Price Target Set at Rs 214 for 2027?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Earnings_Growth_Behind_the_Capacite_Infraprojects_Target_Price_Five_Years_of_Results\" title=\"Earnings Growth Behind the Capacit&#8217;e Infraprojects Target Price: Five Years of Results\">Earnings Growth Behind the Capacit&#8217;e Infraprojects Target Price: Five Years of Results<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Margins_and_the_Latest_Quarter\" title=\"Margins and the Latest Quarter\">Margins and the Latest Quarter<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Balance_Sheet_and_Cash_Flow\" title=\"Balance Sheet and Cash Flow\">Balance Sheet and Cash Flow<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Valuation_Check_for_the_Capacite_Infraprojects_Stock_Target_PE_Price_to_Book_and_ROE\" title=\"Valuation Check for the Capacit&#8217;e Infraprojects Stock Target: PE, Price to Book and ROE\">Valuation Check for the Capacit&#8217;e Infraprojects Stock Target: PE, Price to Book and ROE<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Shareholding_Pattern_and_Institutional_Holding\" title=\"Shareholding Pattern and Institutional Holding\">Shareholding Pattern and Institutional Holding<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Capacite_Infraprojects_Share_Price_Targets_for_the_Short_Term_and_12_Months\" title=\"Capacit&#8217;e Infraprojects Share Price Targets for the Short Term and 12 Months\">Capacit&#8217;e Infraprojects Share Price Targets for the Short Term and 12 Months<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Short_Term_Capacite_Infraprojects_Stock_Target_Levels_Technical_Setup\" title=\"Short Term Capacit&#8217;e Infraprojects Stock Target Levels: Technical Setup\">Short Term Capacit&#8217;e Infraprojects Stock Target Levels: Technical Setup<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#12_Month_Capacite_Infraprojects_Target_Price_for_2027\" title=\"12 Month Capacit&#8217;e Infraprojects Target Price for 2027\">12 Month Capacit&#8217;e Infraprojects Target Price for 2027<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#How_EPS_Growth_and_PE_Multiple_Change_the_Capacite_Infraprojects_Target_Price\" title=\"How EPS Growth and PE Multiple Change the Capacit&#8217;e Infraprojects Target Price\">How EPS Growth and PE Multiple Change the Capacit&#8217;e Infraprojects Target Price<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Bull_Case_and_Downside_Risk_for_Capacite_Infraprojects_Stock_Target_in_2027\" title=\"Bull Case and Downside Risk for Capacit&#8217;e Infraprojects Stock Target in 2027\">Bull Case and Downside Risk for Capacit&#8217;e Infraprojects Stock Target in 2027<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Bull_Case_Rs_258\" title=\"Bull Case Rs 258\">Bull Case Rs 258<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Downside_Risk_Level_Rs_144\" title=\"Downside Risk Level Rs 144\">Downside Risk Level Rs 144<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Key_Risks_to_the_Capacite_Infraprojects_Target_Price_for_2027\" title=\"Key Risks to the Capacit&#8217;e Infraprojects Target Price for 2027\">Key Risks to the Capacit&#8217;e Infraprojects Target Price for 2027<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Growth_Slowdown_Risk_for_the_Capacite_Infraprojects_Price_Target\" title=\"Growth Slowdown Risk for the Capacit&#8217;e Infraprojects Price Target\">Growth Slowdown Risk for the Capacit&#8217;e Infraprojects Price Target<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Liquidity_and_Size_Risk\" title=\"Liquidity and Size Risk\">Liquidity and Size Risk<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Valuation_and_Margin_Risk\" title=\"Valuation and Margin Risk\">Valuation and Margin Risk<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Market_and_Technical_Risk\" title=\"Market and Technical Risk\">Market and Technical Risk<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#How_to_Invest_in_Capacite_Infraprojects\" title=\"How to Invest in Capacit&#8217;e Infraprojects\">How to Invest in Capacit&#8217;e Infraprojects<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#FAQs_on_Capacite_Infraprojects_Share_Price_Target_2027\" title=\"FAQs on Capacit&#8217;e Infraprojects Share Price Target 2027\">FAQs on Capacit&#8217;e Infraprojects Share Price Target 2027<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#What_is_the_Capacite_Infraprojects_share_price_target_for_2027\" title=\"What is the Capacit&#8217;e Infraprojects share price target for 2027?\">What is the Capacit&#8217;e Infraprojects share price target for 2027?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#What_is_the_Capacite_Infraprojects_share_price_today\" title=\"What is the Capacit&#8217;e Infraprojects share price today?\">What is the Capacit&#8217;e Infraprojects share price today?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Is_Capacite_Infraprojects_a_buy_or_sell_at_the_current_price\" title=\"Is Capacit&#8217;e Infraprojects a buy or sell at the current price?\">Is Capacit&#8217;e Infraprojects a buy or sell at the current price?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#What_are_the_bull_case_target_and_downside_risk_level_for_Capacite_Infraprojects_shares\" title=\"What are the bull case target and downside risk level for Capacit&#8217;e Infraprojects shares?\">What are the bull case target and downside risk level for Capacit&#8217;e Infraprojects shares?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#What_are_the_main_risks_to_the_Capacite_Infraprojects_price_target\" title=\"What are the main risks to the Capacit&#8217;e Infraprojects price target?\">What are the main risks to the Capacit&#8217;e Infraprojects price target?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#What_is_the_PE_ratio_of_Capacite_Infraprojects_and_how_does_it_compare_with_the_industry\" title=\"What is the PE ratio of Capacit&#8217;e Infraprojects and how does it compare with the industry?\">What is the PE ratio of Capacit&#8217;e Infraprojects and how does it compare with the industry?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#Who_owns_Capacite_Infraprojects_and_what_is_the_promoter_holding\" title=\"Who owns Capacit&#8217;e Infraprojects, and what is the promoter holding?\">Who owns Capacit&#8217;e Infraprojects, and what is the promoter holding?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/univest.in\/blogs-2\/capacit-e-infraprojects-share-price-target-2027\/#What_were_Capacite_Infraprojects_latest_quarterly_results\" title=\"What were Capacit&#8217;e Infraprojects&#8217; latest quarterly results?\">What were Capacit&#8217;e Infraprojects&#8217; latest quarterly results?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Capacite_Infraprojects_Stock_Analysis_Company_Overview_and_Key_Stats\"><\/span><strong>Capacit&#8217;e Infraprojects Stock Analysis: Company Overview and Key Stats<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Capacit&#8217;e Infraprojects (NSE: CAPACITE) has a market capitalisation of Rs 1,519 crore. In FY26 it reported revenue of Rs 2,644 crore and net profit of Rs 193.09 crore. The table collects the figures the Capacit&#8217;e Infraprojects share price target is built on.<\/p>\n<table style=\"border-collapse:collapse;width:100%;\" border=\"1\" cellpadding=\"8\">\n<tr>\n<th>Metric<\/th>\n<th>Value<\/th>\n<\/tr>\n<tr>\n<td>Company<\/td>\n<td><a href=\"https:\/\/univest.in\/stocks\/capacite\/capacit'e-infraprojects-ltd-share-price-today\">Capacit&#8217;e Infraprojects<\/a><\/td>\n<\/tr>\n<tr>\n<td>NSE Ticker<\/td>\n<td>CAPACITE<\/td>\n<\/tr>\n<tr>\n<td>CMP (13 November 2026)<\/td>\n<td>Rs 175.56<\/td>\n<\/tr>\n<tr>\n<td>52-Week High<\/td>\n<td>Rs 314.25<\/td>\n<\/tr>\n<tr>\n<td>52-Week Low<\/td>\n<td>Rs 144.20<\/td>\n<\/tr>\n<tr>\n<td>Market Cap<\/td>\n<td>Rs 1,519 crore<\/td>\n<\/tr>\n<tr>\n<td>PE Ratio (TTM)<\/td>\n<td>8.33<\/td>\n<\/tr>\n<tr>\n<td>Industry PE<\/td>\n<td>23.54<\/td>\n<\/tr>\n<tr>\n<td>Price to Book<\/td>\n<td>0.76<\/td>\n<\/tr>\n<tr>\n<td>Return on Equity<\/td>\n<td>9.21%<\/td>\n<\/tr>\n<tr>\n<td>Debt to Equity<\/td>\n<td>0.28<\/td>\n<\/tr>\n<tr>\n<td>EPS (TTM)<\/td>\n<td>Rs 21.56<\/td>\n<\/tr>\n<tr>\n<td>Dividend Yield<\/td>\n<td>0.00%<\/td>\n<\/tr>\n<tr>\n<td>12-Month Base Target<\/td>\n<td>Rs 214<\/td>\n<\/tr>\n<tr>\n<td>Bull Case<\/td>\n<td>Rs 258<\/td>\n<\/tr>\n<tr>\n<td>Downside Risk Level (not a target)<\/td>\n<td>Rs 144<\/td>\n<\/tr>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Why_Is_Capacite_Infraprojects_Share_Price_Target_Set_at_Rs_214_for_2027\"><\/span><strong>Why Is Capacit&#8217;e Infraprojects Share Price Target Set at Rs 214 for 2027?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The arithmetic is short. Trailing EPS of Rs 21.56 grown for one year gives a forward EPS estimate of Rs 25.68, and multiplying it by the unchanged PE of 8.33 gives the Rs 214 base-case Capacit&#8217;e Infraprojects stock target. The bull case adds faster earnings growth and a higher multiple, while the downside risk level assumes flat earnings and a lower multiple.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Earnings_Growth_Behind_the_Capacite_Infraprojects_Target_Price_Five_Years_of_Results\"><\/span><strong>Earnings Growth Behind the Capacit&#8217;e Infraprojects Target Price: Five Years of Results<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Capacit&#8217;e Infraprojects grew revenue from Rs 1,353 crore in FY22 to Rs 2,644 crore in FY26, a compound annual growth rate of 18.2%. Net profit grew faster, from Rs 47.76 crore to Rs 193.09 crore (41.8% a year), which shows margin gains did part of the work and not just higher sales.<\/p>\n<table style=\"border-collapse:collapse;width:100%;\" border=\"1\" cellpadding=\"8\">\n<tr>\n<th>Financial Year<\/th>\n<th>Revenue (Rs Cr)<\/th>\n<th>Net Profit (Rs Cr)<\/th>\n<th>EPS (Rs)<\/th>\n<th>Dividend per Share (Rs)<\/th>\n<\/tr>\n<tr>\n<td>FY22<\/td>\n<td>1,352.96<\/td>\n<td>47.76<\/td>\n<td>7.03<\/td>\n<td>0.00<\/td>\n<\/tr>\n<tr>\n<td>FY23<\/td>\n<td>1,808.11<\/td>\n<td>95.30<\/td>\n<td>14.04<\/td>\n<td>0.00<\/td>\n<\/tr>\n<tr>\n<td>FY24<\/td>\n<td>1,963.65<\/td>\n<td>120.33<\/td>\n<td>16.09<\/td>\n<td>0.00<\/td>\n<\/tr>\n<tr>\n<td>FY25<\/td>\n<td>2,407.11<\/td>\n<td>203.77<\/td>\n<td>24.08<\/td>\n<td>0.00<\/td>\n<\/tr>\n<tr>\n<td>FY26<\/td>\n<td>2,643.63<\/td>\n<td>193.09<\/td>\n<td>22.82<\/td>\n<td>0.00<\/td>\n<\/tr>\n<\/table>\n<p>FY26 revenue growth was 9.8%, slower than the four-year average of 18.2%, and net profit moved down 5.2%. EPS rose from Rs 16.09 in FY24 to Rs 22.82 in FY26. The FY27 outlook for the Capacit&#8217;e Infraprojects price target depends on whether that EPS estimate keeps compounding.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Margins_and_the_Latest_Quarter\"><\/span><strong>Margins and the Latest Quarter<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Capacit&#8217;e Infraprojects converted 7.3% of FY26 revenue into net profit, against 8.5% in FY25, within a five-year range of 3.5% to 8.5%. EBITDA margin was 17.2% in FY26 versus 18.8% in FY25.<\/p>\n<p>In the September 2026 quarter, revenue was Rs 775.81 crore, up 19.3% from the same quarter a year earlier, while net profit of Rs 47.56 crore was down 6.9%. EBITDA came in at Rs 124.00 crore, up 10.2% year on year. The next quarterly result is the first test of whether the earnings assumption behind the Capacit&#8217;e Infraprojects stock target holds.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Balance_Sheet_and_Cash_Flow\"><\/span><strong>Balance Sheet and Cash Flow<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Debt to equity stands at 0.28, and shareholders&#8217; equity grew from Rs 965.17 crore in FY22 to Rs 1,912 crore in FY26. Operating cash flow in FY26 was Rs 223.30 crore against capital expenditure of Rs 174.84 crore, leaving free cash flow of Rs 48.46 crore, or 3.2% of the current market capitalisation. In FY25 free cash flow was negative at Rs 51.18 crore, so cash generation has not been steady year to year.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Valuation_Check_for_the_Capacite_Infraprojects_Stock_Target_PE_Price_to_Book_and_ROE\"><\/span><strong>Valuation Check for the Capacit&#8217;e Infraprojects Stock Target: PE, Price to Book and ROE<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>At a PE of 8.33 against an industry PE of 23.54, Capacit&#8217;e Infraprojects trades at a discount to its industry. Price to book is 0.76 on a book value of Rs 236.15 per share, and return on equity is 9.21%. A PE of 8.33 equals an earnings yield of 12.0%, and the FY26 dividend of Rs 0.00 per share gives a yield of 0.00%.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Shareholding_Pattern_and_Institutional_Holding\"><\/span><strong>Shareholding Pattern and Institutional Holding<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Promoters held 31.69% of Capacit&#8217;e Infraprojects in September 2026, and promoter holding has stayed near 31.69% since September 2025. Foreign institutional investors (FII) held 11.65% and domestic institutions (DII) held 6.66%, which puts total institutional holding at 18.31%. FII holding fell from 13.95% in September 2025 to 11.65% in September 2026. Public shareholders own the remaining 50.00%. A meaningful institutional holding adds a layer of research coverage and trading depth.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Capacite_Infraprojects_Share_Price_Targets_for_the_Short_Term_and_12_Months\"><\/span><strong>Capacit&#8217;e Infraprojects Share Price Targets for the Short Term and 12 Months<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Short_Term_Capacite_Infraprojects_Stock_Target_Levels_Technical_Setup\"><\/span><strong>Short Term Capacit&#8217;e Infraprojects Stock Target Levels: Technical Setup<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>At Rs 175.56 on 13 November 2026, Capacit&#8217;e Infraprojects trades below its 50-day simple moving average of Rs 178.93 and below its 200-day exponential moving average of Rs 217.01. The 14-day RSI reads 73.2, which is overbought territory, and the MACD line sits above its signal line. The nearest resistance level is Rs 178.93 (50-day simple moving average) and the nearest support is Rs 144.20 (52-week low). A sustained move above Rs 178.93 would improve the short-term setup, while a close below Rs 144.20 would shift attention to the next support.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"12_Month_Capacite_Infraprojects_Target_Price_for_2027\"><\/span><strong>12 Month Capacit&#8217;e Infraprojects Target Price for 2027<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The 12-month target of Rs 214 means a move of 21.9% up from Rs 175.56 over the next 12 months. It would still leave the stock 31.9% below its 52-week high of Rs 314.25. Anyone checking the Capacit&#8217;e Infraprojects share price target against their own view should focus on two inputs: the EPS estimate and the PE multiple.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_EPS_Growth_and_PE_Multiple_Change_the_Capacite_Infraprojects_Target_Price\"><\/span><strong>How EPS Growth and PE Multiple Change the Capacit&#8217;e Infraprojects Target Price<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<table style=\"border-collapse:collapse;width:100%;\" border=\"1\" cellpadding=\"8\">\n<tr>\n<th>EPS Growth<\/th>\n<th>PE 6.66<\/th>\n<th>PE 8.33<\/th>\n<th>PE 9.58<\/th>\n<\/tr>\n<tr>\n<td>0.0% (EPS Rs 21.56)<\/td>\n<td>Rs 144<\/td>\n<td>Rs 180<\/td>\n<td>Rs 207<\/td>\n<\/tr>\n<tr>\n<td>19.1% (EPS Rs 25.68)<\/td>\n<td>Rs 171<\/td>\n<td>Rs 214<\/td>\n<td>Rs 246<\/td>\n<\/tr>\n<tr>\n<td>25.0% (EPS Rs 26.95)<\/td>\n<td>Rs 179<\/td>\n<td>Rs 224<\/td>\n<td>Rs 258<\/td>\n<\/tr>\n<\/table>\n<p>Each cell multiplies the forward EPS estimate by the PE shown. Reading across a row shows what a de-rating or re-rating does to the Capacit&#8217;e Infraprojects price forecast, and reading down a column shows what earnings growth is worth at a fixed multiple.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Bull_Case_and_Downside_Risk_for_Capacite_Infraprojects_Stock_Target_in_2027\"><\/span><strong>Bull Case and Downside Risk for Capacit&#8217;e Infraprojects Stock Target in 2027<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Bull_Case_Rs_258\"><\/span><strong>Bull Case Rs 258<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The bull case Capacit&#8217;e Infraprojects price target needs EPS growth of 25.0%, which lifts forward EPS to Rs 26.95, and a PE multiple that rises 15% to 9.58. That gives Rs 258, 47.0% above the current price and below the 52-week high of Rs 314.25.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Downside_Risk_Level_Rs_144\"><\/span><strong>Downside Risk Level Rs 144<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The downside risk level is not a target. It assumes EPS stays flat at Rs 21.56 and the PE falls 20% to 6.66. That gives Rs 144, 18.0% below the current price and below the 52-week low of Rs 144.20.<\/p>\n<table style=\"border-collapse:collapse;width:100%;\" border=\"1\" cellpadding=\"8\">\n<tr>\n<th>Scenario<\/th>\n<th>EPS Growth<\/th>\n<th>PE Multiple<\/th>\n<th>Price (Rs)<\/th>\n<th>Change vs CMP<\/th>\n<\/tr>\n<tr>\n<td>Bull Case<\/td>\n<td>25.0%<\/td>\n<td>9.58<\/td>\n<td>Rs 258<\/td>\n<td>+47.0%<\/td>\n<\/tr>\n<tr>\n<td>Base Case<\/td>\n<td>19.1%<\/td>\n<td>8.33<\/td>\n<td>Rs 214<\/td>\n<td>+21.9%<\/td>\n<\/tr>\n<tr>\n<td>Downside Risk<\/td>\n<td>0.0%<\/td>\n<td>6.66<\/td>\n<td>Rs 144<\/td>\n<td>-18.0%<\/td>\n<\/tr>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Key_Risks_to_the_Capacite_Infraprojects_Target_Price_for_2027\"><\/span><strong>Key Risks to the Capacit&#8217;e Infraprojects Target Price for 2027<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Growth_Slowdown_Risk_for_the_Capacite_Infraprojects_Price_Target\"><\/span><strong>Growth Slowdown Risk for the Capacit&#8217;e Infraprojects Price Target<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Revenue in the September 2026 quarter was up 19.3% year on year, and FY26 revenue growth was 9.8%. If growth slows from here, the EPS estimate behind the Capacit&#8217;e Infraprojects stock target will need revising.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Liquidity_and_Size_Risk\"><\/span><strong>Liquidity and Size Risk<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Capacit&#8217;e Infraprojects has a market capitalisation of Rs 1,519 crore. Institutional holding is 18.31%, and promoters hold 31.69%. Stocks of this size can move sharply on small volumes, and exits can take longer than entries.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Valuation_and_Margin_Risk\"><\/span><strong>Valuation and Margin Risk<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Net margin was 7.3% in FY26, so a small slip in costs moves profit noticeably. At a PE of 8.33 versus an industry PE of 23.54, a de-rating toward the downside-risk PE of 6.66 would cut the price even if earnings hold.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Market_and_Technical_Risk\"><\/span><strong>Market and Technical Risk<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Technical indicators add short-term risk: the 14-day RSI is 73.2 and the MACD sits above its signal line. A broad fall in the <a href=\"https:\/\/univest.in\/indices\/nifty-50\/nifty-50-share-price-today\">Nifty 50<\/a> or the <a href=\"https:\/\/univest.in\/indices\/sensex\/sensex-share-price-today\">Sensex<\/a> can override company fundamentals for weeks at a time. That applies to any Capacit&#8217;e Infraprojects stock target, however carefully it is built.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_to_Invest_in_Capacite_Infraprojects\"><\/span><strong>How to Invest in Capacit&#8217;e Infraprojects<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Start with the live price and volume. Any Capacit&#8217;e Infraprojects share price target is only as current as the data behind it, and the data here is as of 13 November 2026, so refresh the Rs 175.56 price before acting on any level.<\/p>\n<p>Next, review the fundamentals yourself. The Univest Screener lets you check Capacit&#8217;e Infraprojects&#8217; PE, ROE, debt and shareholding in one place.<\/p>\n<p style=\"margin-top:24px;\"><a href=\"https:\/\/univest.in\/screeners\"><strong>Check Capacit&#8217;e Infraprojects fundamentals on the Univest Screener<\/strong><\/a><\/p>\n<p>Then compare the three Capacit&#8217;e Infraprojects target price scenarios with your own view. If you expect EPS growth below 19.1%, the base case is too optimistic for you; if you expect more, the bull case deserves weight.<\/p>\n<p>Decide your position size and exit levels before you buy. The support and resistance levels above can serve as reference points, but they are not recommendations.<\/p>\n<p>Finally, place the order through a SEBI-registered broker or the Univest app, and review the position after each quarterly result. Consult a SEBI-registered advisor if you are unsure.<\/p>\n<p style=\"margin-top:24px;\"><em>Download the <a href=\"http:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\">Univest iOS App<\/a> or <a href=\"http:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&#038;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\">Univest Android App<\/a> to track Capacit&#8217;e Infraprojects live price and get daily stock recommendations.<\/em><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The Capacit&#8217;e Infraprojects share price target for 2027 is Rs 214 in the base case, with Rs 258 as the bull case. The support for that view is arithmetic you can check: EPS grew 19.1% a year over FY24 to FY26, and the stock trades at a PE of 8.33. The risks are equally concrete, including a net margin of just 7.3% that leaves profit sensitive to costs and a downside scenario that cuts the price 18% if earnings stall. Use these numbers as a framework for judging the Capacit&#8217;e Infraprojects price target, check them against the latest filings, and size any position to your own risk appetite.<\/p>\n<div style=\"background:#CC0000;border-radius:8px;padding:16px 20px;margin:24px 0;\">\n<p style=\"color:#FFFFFF;font-size:13px;line-height:1.7;margin:0;\"><strong style=\"color:#FFFFFF;\">Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data with the official NSE (nseindia.com) and BSE (bseindia.com) websites before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).<\/p>\n<\/p><\/div>\n<h2><span class=\"ez-toc-section\" id=\"FAQs_on_Capacite_Infraprojects_Share_Price_Target_2027\"><\/span><strong>FAQs on Capacit&#8217;e Infraprojects Share Price Target 2027<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_Capacite_Infraprojects_share_price_target_for_2027\"><\/span><strong>What is the Capacit&#8217;e Infraprojects share price target for 2027?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The base-case Capacit&#8217;e Infraprojects share price target for 2027 is Rs 214, which is 21.9% above the price of Rs 175.56 on 13 November 2026. The bull case is Rs 258 and the downside risk level, which is not a target, is Rs 144. All three come from one method: forward EPS multiplied by a PE multiple, using only reported results. They are model estimates and not guaranteed outcomes, and the next quarterly result is the first check on the EPS assumption.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_Capacite_Infraprojects_share_price_today\"><\/span><strong>What is the Capacit&#8217;e Infraprojects share price today?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> As of 13 November 2026, 9:21 AM IST, Capacit&#8217;e Infraprojects (NSE: CAPACITE) trades at Rs 175.56, down 0.72% on the day. That is 44.1% below the 52-week high of Rs 314.25 and 21.7% above the 52-week low of Rs 144.20. The market capitalisation of Rs 1,519 crore places it among small-cap stocks. Prices change through the trading session, so check the live quote before acting on any level in this article.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Is_Capacite_Infraprojects_a_buy_or_sell_at_the_current_price\"><\/span><strong>Is Capacit&#8217;e Infraprojects a buy or sell at the current price?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The data points both ways. On the positive side, EPS has grown 19.1% a year over FY24 to FY26 and the base case implies 21.9% upside; on the cautious side, the net margin is a thin 7.3%, and the downside risk level of Rs 144 is 18% below the current price. Whether Capacit&#8217;e Infraprojects fits your portfolio depends on your time horizon, position size and risk appetite. Consult a SEBI-registered advisor before investing, as this article is not investment advice.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_are_the_bull_case_target_and_downside_risk_level_for_Capacite_Infraprojects_shares\"><\/span><strong>What are the bull case target and downside risk level for Capacit&#8217;e Infraprojects shares?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The bull case in the Capacit&#8217;e Infraprojects share price target for 2027 is Rs 258, which assumes 25.0% EPS growth and a PE of 9.58, a 15% re-rating from today&#8217;s multiple. That is 47.0% above the current price and below the 52-week high of Rs 314.25. The downside risk level is Rs 144, which assumes flat EPS and a PE of 6.66, 20% lower than today. It sits 18.0% below the current price and below the 52-week low of Rs 144.20, and it marks a risk to watch, not a target.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_are_the_main_risks_to_the_Capacite_Infraprojects_price_target\"><\/span><strong>What are the main risks to the Capacit&#8217;e Infraprojects price target?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Four risks matter most for the Capacit&#8217;e Infraprojects share price target: slower revenue or profit growth, a PE de-rating, thin liquidity or size risk, and weakness in the broader market. With a market capitalisation of Rs 1,519 crore, the stock can move sharply on small volumes, and exits can take longer than entries. A fall to the downside-risk PE of 6.66 would cut the price even if earnings hold.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_PE_ratio_of_Capacite_Infraprojects_and_how_does_it_compare_with_the_industry\"><\/span><strong>What is the PE ratio of Capacit&#8217;e Infraprojects and how does it compare with the industry?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The PE ratio of Capacit&#8217;e Infraprojects is 8.33, against an industry PE of 23.54, which is a discount to the industry. Price to book is 0.76 and return on equity is 9.21%, and the PE equals an earnings yield of 12.0%. The base case holds the PE unchanged, so the Capacit&#8217;e Infraprojects share price target moves only with earnings, while the bull and downside scenarios change the multiple by +15% and -20%.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Who_owns_Capacite_Infraprojects_and_what_is_the_promoter_holding\"><\/span><strong>Who owns Capacit&#8217;e Infraprojects, and what is the promoter holding?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Promoters held 31.69% of Capacit&#8217;e Infraprojects in September 2026. FII held 11.65%, DII held 6.66% and the public held 50.00%. Together the two institutional groups hold 18.31%. Shareholding is filed every quarter, so it is worth rechecking after each result.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_were_Capacite_Infraprojects_latest_quarterly_results\"><\/span><strong>What were Capacit&#8217;e Infraprojects&#8217; latest quarterly results?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> In the September 2026 quarter, Capacit&#8217;e Infraprojects reported revenue of Rs 775.81 crore (up 19.3% year on year) and net profit of Rs 47.56 crore (down 6.9%). For comparison, FY26 full-year revenue growth was 9.8% and net profit moved down 5.2%. Each new quarter either supports or weakens the EPS growth of 19.1% assumed in the base case.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is the Capacit'e Infraprojects share price target for 2027?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The base-case Capacit'e Infraprojects share price target for 2027 is Rs 214, which is 21.9% above the price of Rs 175.56 on 13 November 2026. The bull case is Rs 258 and the downside risk level, which is not a target, is Rs 144. All three come from one method: forward EPS multiplied by a PE multiple, using only reported results. They are model estimates and not guaranteed outcomes, and the next quarterly result is the first check on the EPS assumption.\"}},{\"@type\":\"Question\",\"name\":\"What is the Capacit'e Infraprojects share price today?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"As of 13 November 2026, 9:21 AM IST, Capacit'e Infraprojects (NSE: CAPACITE) trades at Rs 175.56, down 0.72% on the day. That is 44.1% below the 52-week high of Rs 314.25 and 21.7% above the 52-week low of Rs 144.20. The market capitalisation of Rs 1,519 crore places it among small-cap stocks. Prices change through the trading session, so check the live quote before acting on any level in this article.\"}},{\"@type\":\"Question\",\"name\":\"Is Capacit'e Infraprojects a buy or sell at the current price?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The data points both ways. On the positive side, EPS has grown 19.1% a year over FY24 to FY26 and the base case implies 21.9% upside; on the cautious side, the net margin is a thin 7.3%, and the downside risk level of Rs 144 is 18% below the current price. Whether Capacit'e Infraprojects fits your portfolio depends on your time horizon, position size and risk appetite. Consult a SEBI-registered advisor before investing, as this article is not investment advice.\"}},{\"@type\":\"Question\",\"name\":\"What are the bull case target and downside risk level for Capacit'e Infraprojects shares?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The bull case in the Capacit'e Infraprojects share price target for 2027 is Rs 258, which assumes 25.0% EPS growth and a PE of 9.58, a 15% re-rating from today's multiple. That is 47.0% above the current price and below the 52-week high of Rs 314.25. The downside risk level is Rs 144, which assumes flat EPS and a PE of 6.66, 20% lower than today. It sits 18.0% below the current price and below the 52-week low of Rs 144.20, and it marks a risk to watch, not a target.\"}},{\"@type\":\"Question\",\"name\":\"What are the main risks to the Capacit'e Infraprojects price target?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Four risks matter most for the Capacit'e Infraprojects share price target: slower revenue or profit growth, a PE de-rating, thin liquidity or size risk, and weakness in the broader market. With a market capitalisation of Rs 1,519 crore, the stock can move sharply on small volumes, and exits can take longer than entries. A fall to the downside-risk PE of 6.66 would cut the price even if earnings hold.\"}},{\"@type\":\"Question\",\"name\":\"What is the PE ratio of Capacit'e Infraprojects and how does it compare with the industry?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The PE ratio of Capacit'e Infraprojects is 8.33, against an industry PE of 23.54, which is a discount to the industry. Price to book is 0.76 and return on equity is 9.21%, and the PE equals an earnings yield of 12.0%. The base case holds the PE unchanged, so the Capacit'e Infraprojects share price target moves only with earnings, while the bull and downside scenarios change the multiple by +15% and -20%.\"}},{\"@type\":\"Question\",\"name\":\"Who owns Capacit'e Infraprojects, and what is the promoter holding?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Promoters held 31.69% of Capacit'e Infraprojects in September 2026. FII held 11.65%, DII held 6.66% and the public held 50.00%. Together the two institutional groups hold 18.31%. Shareholding is filed every quarter, so it is worth rechecking after each result.\"}},{\"@type\":\"Question\",\"name\":\"What were Capacit'e Infraprojects' latest quarterly results?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"In the September 2026 quarter, Capacit'e Infraprojects reported revenue of Rs 775.81 crore (up 19.3% year on year) and net profit of Rs 47.56 crore (down 6.9%). For comparison, FY26 full-year revenue growth was 9.8% and net profit moved down 5.2%. Each new quarter either supports or weakens the EPS growth of 19.1% assumed in the base case.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Capacit&#8217;e Infraprojects share price target 2027: base Rs 214, bull Rs 258, downside risk level Rs 144, built from reported earnings, valuation and shareholding data.<\/p>\n","protected":false},"author":34,"featured_media":346524,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[1019],"class_list":["post-346525","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-market","tag-stock-market"],"metadata":{"rank_math_internal_links_processed":["1"],"_thumbnail_id":["346524"],"rank_math_title":["Capacit'e Infraprojects Share Price Target 2027: 21.9% Upside"],"rank_math_description":["The Capacit'e Infraprojects share price target for 2027 is Rs 214 against a price of Rs 175.56. Bull case, downside risk, earnings and risks explained. November 2026."],"rank_math_focus_keyword":["Capacit'e Infraprojects share price target | Density Target: 1.2 to 1.5%"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/11\/capacit-e-infraprojects-share-price-target-2027-21-9-upside-to-rs-214-bull-rs.webp","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/346525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/34"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=346525"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/346525\/revisions"}],"predecessor-version":[{"id":346526,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/346525\/revisions\/346526"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/346524"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=346525"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=346525"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=346525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}