{"id":328095,"date":"2026-10-27T12:05:51","date_gmt":"2026-10-27T06:35:51","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=328095"},"modified":"2026-10-27T12:05:51","modified_gmt":"2026-10-27T06:35:51","slug":"why-ravita-share-lower-circuit-consecutive-2026","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/","title":{"rendered":"RAVITA ENGINEERING SER L Hits Lower Circuit for the 2nd Straight Session on NSE, 27 October 2026"},"content":{"rendered":"<p>A buyer weighing <a href=\"https:\/\/univest.in\/stocks\/ravita\/ravita-engineering-ser-l-share-price-today\">RAVITA ENGINEERING SER L<\/a> today and a shareholder already in the stock look at the same screen and see different things: one a lower price tag, the other a fall. The RAVITA ENGINEERING SER lower circuit streak has run for 2 sessions, and on 27 October 2026 the stock was locked at Rs 107.7 on NSE, 4.98% below the previous close of Rs 113.35. Market cap stood at Rs 427.11 crore.<\/p>\n<p>It was still held at that level at the time of writing.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Key_Takeaways\" title=\"Key Takeaways\">Key Takeaways<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Key_Market_Data\" title=\"Key Market Data\">Key Market Data<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Price_Action_and_Trading_Activity\" title=\"Price Action and Trading Activity\">Price Action and Trading Activity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#The_RAVITA_ENGINEERING_SER_Lower_Circuit_Streak_So_Far\" title=\"The RAVITA ENGINEERING SER Lower Circuit Streak So Far\">The RAVITA ENGINEERING SER Lower Circuit Streak So Far<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Why_RAVITA_ENGINEERING_SER_L_Hit_Lower_Circuit\" title=\"Why RAVITA ENGINEERING SER L Hit Lower Circuit\">Why RAVITA ENGINEERING SER L Hit Lower Circuit<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#What_the_RAVITA_ENGINEERING_SER_Lower_Circuit_Means\" title=\"What the RAVITA ENGINEERING SER Lower Circuit Means\">What the RAVITA ENGINEERING SER Lower Circuit Means<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#RAVITA_ENGINEERING_SER_L_Fundamentals_and_Valuation\" title=\"RAVITA ENGINEERING SER L Fundamentals and Valuation\">RAVITA ENGINEERING SER L Fundamentals and Valuation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Peer_and_Sector_Context\" title=\"Peer and Sector Context\">Peer and Sector Context<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Technical_Snapshot\" title=\"Technical Snapshot\">Technical Snapshot<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#What_Readers_Should_Know\" title=\"What Readers Should Know\">What Readers Should Know<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Frequently_Asked_Questions\" title=\"Frequently Asked Questions\">Frequently Asked Questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Why_did_RAVITA_ENGINEERING_SER_L_hit_lower_circuit_on_27_October_2026\" title=\"Why did RAVITA ENGINEERING SER L hit lower circuit on 27 October 2026?\">Why did RAVITA ENGINEERING SER L hit lower circuit on 27 October 2026?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#How_many_sessions_has_RAVITA_ENGINEERING_SER_L_hit_lower_circuit_in_a_row\" title=\"How many sessions has RAVITA ENGINEERING SER L hit lower circuit in a row?\">How many sessions has RAVITA ENGINEERING SER L hit lower circuit in a row?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#What_was_RAVITA_share_price_on_27_October_2026\" title=\"What was RAVITA share price on 27 October 2026?\">What was RAVITA share price on 27 October 2026?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#What_was_the_lower_circuit_price_for_RAVITA\" title=\"What was the lower circuit price for RAVITA?\">What was the lower circuit price for RAVITA?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#What_is_RAVITA_ENGINEERING_SER_Ls_market_cap_and_PE_ratio\" title=\"What is RAVITA ENGINEERING SER L&#8217;s market cap and PE ratio?\">What is RAVITA ENGINEERING SER L&#8217;s market cap and PE ratio?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Which_exchange_and_data_source_were_used\" title=\"Which exchange and data source were used?\">Which exchange and data source were used?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Does_hitting_a_lower_circuit_mean_RAVITA_ENGINEERING_SER_L_is_a_buy_or_a_sell\" title=\"Does hitting a lower circuit mean RAVITA ENGINEERING SER L is a buy or a sell?\">Does hitting a lower circuit mean RAVITA ENGINEERING SER L is a buy or a sell?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#Can_you_buy_or_sell_RAVITA_ENGINEERING_SER_L_shares_when_the_stock_is_at_the_lower_circuit\" title=\"Can you buy or sell RAVITA ENGINEERING SER L shares when the stock is at the lower circuit?\">Can you buy or sell RAVITA ENGINEERING SER L shares when the stock is at the lower circuit?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#What_happens_the_next_trading_session_after_a_lower_circuit\" title=\"What happens the next trading session after a lower circuit?\">What happens the next trading session after a lower circuit?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/univest.in\/blogs-2\/why-ravita-share-lower-circuit-consecutive-2026\/#What_is_the_lower_circuit_limit_set_at_for_Indian_stocks\" title=\"What is the lower circuit limit set at for Indian stocks?\">What is the lower circuit limit set at for Indian stocks?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Key_Takeaways\"><\/span><strong>Key Takeaways<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>RAVITA ENGINEERING SER L (RAVITA) hit the lower circuit on NSE at Rs 107.7 on 27 October 2026.<\/li>\n<li>The session move was -4.98% against a previous close of Rs 113.35.<\/li>\n<li>Market capitalisation stood at Rs 427.11 crore with a PE ratio of 15.23.<\/li>\n<li>This is the 2nd straight session at the lower circuit, with the run starting on 26 October 2026.<\/li>\n<li>A price band is an exchange trading rule, not a view on the company or a recommendation.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Key_Market_Data\"><\/span><strong>Key Market Data<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<th>Metric<\/th>\n<th>Value<\/th>\n<\/tr>\n<tr>\n<td>Stock<\/td>\n<td><a href=\"https:\/\/univest.in\/stocks\/ravita\/ravita-engineering-ser-l-share-price-today\">RAVITA ENGINEERING SER L<\/a><\/td>\n<\/tr>\n<tr>\n<td>Current Price \/ LTP<\/td>\n<td>Rs 107.7<\/td>\n<\/tr>\n<tr>\n<td>Day Move<\/td>\n<td>-4.98%<\/td>\n<\/tr>\n<tr>\n<td>Previous Close<\/td>\n<td>Rs 113.35<\/td>\n<\/tr>\n<tr>\n<td>Day Open<\/td>\n<td>Rs 108.3<\/td>\n<\/tr>\n<tr>\n<td>Day High<\/td>\n<td>Rs 113.5<\/td>\n<\/tr>\n<tr>\n<td>Day Low<\/td>\n<td>Rs 107.7<\/td>\n<\/tr>\n<tr>\n<td>Lower Circuit Price<\/td>\n<td>Rs 107.7<\/td>\n<\/tr>\n<tr>\n<td>Lower Circuit Limit<\/td>\n<td>Rs 107.7<\/td>\n<\/tr>\n<tr>\n<td>Market Cap<\/td>\n<td>Rs 427.11 crore<\/td>\n<\/tr>\n<tr>\n<td>Selected Exchange<\/td>\n<td>NSE<\/td>\n<\/tr>\n<tr>\n<td>PE Ratio<\/td>\n<td>15.23<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>All figures above are as of 27 October 2026, sourced from Univest market data for the NSE listing. Only fields present in the source for this session are shown.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Price_Action_and_Trading_Activity\"><\/span><strong>Price Action and Trading Activity<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The stock opened at Rs 108.3 on NSE, under the previous close of Rs 113.35, rose as far as Rs 113.5 and then dropped to Rs 107.7, which was both the session low and the circuit price. For a holder who carried the position over from the previous close, that is a fall of Rs 5.65 a share, or -4.98%.<\/p>\n<p>Only NSE figures are used throughout, since band levels, day ranges and previous-close values can differ across exchanges and a mixed set would not compare cleanly. The recorded lower circuit limit was Rs 107.7, the level the price reached.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"The_RAVITA_ENGINEERING_SER_Lower_Circuit_Streak_So_Far\"><\/span><strong>The RAVITA ENGINEERING SER Lower Circuit Streak So Far<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>This is session 2 of an unbroken run for RAVITA ENGINEERING SER L. The streak began on 26 October 2026, from a base price of Rs 119.3. Across the run the stock has moved -9.72% in total.<\/p>\n<p>A repeated lower circuit matters more than a single one. It says the order book has stayed one-sided across multiple sessions rather than reacting to a single day of news, and for anyone holding the stock it means the price on screen has been hard to trade at for several days running.<\/p>\n<p>This page is the running record for the streak and is updated each session rather than being replaced by a fresh article. That keeps one address for the event instead of splitting the same story across competing pages.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Why_RAVITA_ENGINEERING_SER_L_Hit_Lower_Circuit\"><\/span><strong>Why RAVITA ENGINEERING SER L Hit Lower Circuit<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Heavy selling took RAVITA ENGINEERING SER L to the bottom of its exchange-defined price band, where the lower circuit applied. At the time of writing, no official company announcement and no verified external catalyst had been confirmed, so the only explanation the data supports is price action and market sentiment.<\/p>\n<p>In the absence of a verified driver, the move is not linked to earnings, corporate action, sector news or market rumours. Any confirmed announcement that surfaces later would be covered in a separate update.<\/p>\n<p>During the session, the stock reached the band level of Rs 107.7.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_the_RAVITA_ENGINEERING_SER_Lower_Circuit_Means\"><\/span><strong>What the RAVITA ENGINEERING SER Lower Circuit Means<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>To an existing shareholder, the lower circuit means the exchange band has halted the slide for the session; to a prospective buyer, the same level is simply where the day&#8217;s price floor sat. For RAVITA ENGINEERING SER L, that captured floor was Rs 107.7 on 27 October 2026.<\/p>\n<p>Circuit bands are meant to slow extreme price movement and keep trading orderly. They are a market-structure fact and not a return forecast, so the circuit here only marks what happened in the session.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"RAVITA_ENGINEERING_SER_L_Fundamentals_and_Valuation\"><\/span><strong>RAVITA ENGINEERING SER L Fundamentals and Valuation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>RAVITA ENGINEERING SER L, an Engineering company in the Capital Goods sector, showed a PE ratio of 15.23 and a PB ratio of 4.08, with book value of Rs 27.8 and EPS of 7.44, on a market cap of Rs 427.11 crore. These indicators are reference points and not a buy, sell or hold view.<\/p>\n<p>A PB ratio of 4.08 means the market valued the stock above its reported book value per share. Holders and new buyers would each read that premium differently, and the data does not say what sits behind it.<\/p>\n<p>A sharp one-day move can attract attention, but valuation and returns still need to be reviewed on their own terms, apart from the price event.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Peer_and_Sector_Context\"><\/span><strong>Peer and Sector Context<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>RAVITA ENGINEERING SER L belongs to the Engineering industry within the Capital Goods sector. The peer table below uses available companies from the same sector or industry to give broader valuation context.<\/p>\n<table>\n<tbody>\n<tr>\n<th>Peer Company<\/th>\n<th>Market Cap<\/th>\n<th>PE<\/th>\n<th>PB<\/th>\n<th>ROE<\/th>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/univest.in\/stocks\/kpgel\/kp-green-engineering-ltd-share-price-today\">KP Green Engineering Ltd.<\/a><\/td>\n<td>Rs 1368 crore<\/td>\n<td>10.08<\/td>\n<td>4.22<\/td>\n<td>24.9%<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/univest.in\/stocks\/southwest\/south-west-pinnacle-exploration-ltd-share-price-today\">South West Pinnacle Exploration Ltd.<\/a><\/td>\n<td>Rs 570.42 crore<\/td>\n<td>14.27<\/td>\n<td>2.38<\/td>\n<td>18.58%<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/univest.in\/stocks\/anlon-sm\/anlon-technology-solution-ltd-share-price-today\">Anlon Technology Solution Ltd.<\/a><\/td>\n<td>Rs 502.41 crore<\/td>\n<td>36.21<\/td>\n<td>6.79<\/td>\n<td>21.1%<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/univest.in\/stocks\/taurian-st\/taurian-mps-limited-share-price-today\">TAURIAN MPS LIMITED<\/a><\/td>\n<td>Rs 469.65 crore<\/td>\n<td>28.97<\/td>\n<td>5.4<\/td>\n<td>26.73%<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/univest.in\/stocks\/kataria-st\/kataria-industries-ltd-share-price-today\">Kataria Industries Ltd.<\/a><\/td>\n<td>Rs 348.54 crore<\/td>\n<td>28.75<\/td>\n<td>2.77<\/td>\n<td>10.53%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>RAVITA ENGINEERING SER L&#8217;s PE ratio was 15.23, compared with an available peer PE average of 23.66, calculated from the 5 peer companies that had a PE on record. This comparison is a valuation reference point, not a recommendation.<\/p>\n<div class=\"univest-cta\" style=\"border:1px solid #dbe7f3;background:#f8fbff;padding:18px 22px;border-radius:8px;margin:24px 0;\"><strong>Want to know more?<\/strong> <a href=\"https:\/\/univest.in\/user\/log-in\">Log in to Univest<\/a> for more stock insights.<\/div>\n<h2><span class=\"ez-toc-section\" id=\"Technical_Snapshot\"><\/span><strong>Technical Snapshot<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Technical indicators were limited in the latest market dataset, so this article does not draw a technical conclusion beyond the confirmed lower circuit event.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_Readers_Should_Know\"><\/span><strong>What Readers Should Know<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>What is confirmed is limited: RAVITA ENGINEERING SER L hit the lower circuit on NSE at Rs 107.7 on 27 October 2026, a day move of -4.98%.<\/p>\n<p>For current holders, the practical constraint is exit, because sell orders pile up at the band while buyers are scarce and the quoted price may not be available. For new buyers, the open gap is the cause, since no official catalyst was confirmed at the time of writing.<\/p>\n<p>The event is a market update and not an investment conclusion. The band signals heavy selling pressure in the near term, and a fuller read would add the business, valuation, liquidity, risk and confirmed company disclosures.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span><strong>Frequently Asked Questions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Why_did_RAVITA_ENGINEERING_SER_L_hit_lower_circuit_on_27_October_2026\"><\/span><strong>Why did RAVITA ENGINEERING SER L hit lower circuit on 27 October 2026?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The stock reached its lower price band after selling pressure during the session. No official company announcement or verified external catalyst was confirmed at the time of writing.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_many_sessions_has_RAVITA_ENGINEERING_SER_L_hit_lower_circuit_in_a_row\"><\/span><strong>How many sessions has RAVITA ENGINEERING SER L hit lower circuit in a row?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>This is session 2 of the current run, which began on 26 October 2026. This page is updated each session rather than replaced with a new article.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_was_RAVITA_share_price_on_27_October_2026\"><\/span><strong>What was RAVITA share price on 27 October 2026?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The last traded price used in this article was Rs 107.7 on NSE. That price matched the lower circuit price captured for the event.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_was_the_lower_circuit_price_for_RAVITA\"><\/span><strong>What was the lower circuit price for RAVITA?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The lower circuit price was Rs 107.7. The stated exchange lower circuit limit was Rs 107.7. The event numbers in this article are aligned to NSE.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_RAVITA_ENGINEERING_SER_Ls_market_cap_and_PE_ratio\"><\/span><strong>What is RAVITA ENGINEERING SER L&#8217;s market cap and PE ratio?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>RAVITA ENGINEERING SER L&#8217;s market cap was Rs 427.11 crore. PE ratio was 15.23.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Which_exchange_and_data_source_were_used\"><\/span><strong>Which exchange and data source were used?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The selected exchange was NSE. The article uses Univest market data available at the time of generation, captured on 27 October 2026.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Does_hitting_a_lower_circuit_mean_RAVITA_ENGINEERING_SER_L_is_a_buy_or_a_sell\"><\/span><strong>Does hitting a lower circuit mean RAVITA ENGINEERING SER L is a buy or a sell?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>No. A circuit is an exchange price-band rule that caps how far a stock can move in a single session. It carries no view on valuation or business quality and is not a recommendation. Any decision should rest on fundamentals, valuation, liquidity and your own risk tolerance.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_you_buy_or_sell_RAVITA_ENGINEERING_SER_L_shares_when_the_stock_is_at_the_lower_circuit\"><\/span><strong>Can you buy or sell RAVITA ENGINEERING SER L shares when the stock is at the lower circuit?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>It is usually difficult. At the lower circuit, sell orders queue up with few buyers, so exiting at the quoted price may not be possible. Orders can stay unfilled until buying interest returns.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_happens_the_next_trading_session_after_a_lower_circuit\"><\/span><strong>What happens the next trading session after a lower circuit?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>There is no fixed outcome. The band resets each session, so the stock can open freely, hit the same band again, or reverse. The exchange can also revise the applicable band width. The useful signals to watch are whether the company files any disclosure explaining the move.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_lower_circuit_limit_set_at_for_Indian_stocks\"><\/span><strong>What is the lower circuit limit set at for Indian stocks?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Exchange price bands are commonly set at 2%, 5%, 10% or 20% depending on the security, and the applicable band can be revised by the exchange. For RAVITA ENGINEERING SER L the stated limit was Rs 107.7. For this session, RAVITA ENGINEERING SER L moved -4.98%.<\/p>\n<div style=\"background:#d32f2f;color:#ffffff;padding:16px 20px;border-radius:6px;margin:24px 0;\">\n<p style=\"color:#ffffff;margin:0;\"><strong>Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data with the official NSE (nseindia.com) and BSE (bseindia.com) websites before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Uniresearch Global Pvt. Ltd. (Research Analyst, SEBI Registration Number INH000013776), a subsidiary of Univest Communication Technologies Private Limited.<\/p>\n<\/div>\n<div class=\"faq-schema\"><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"headline\":\"RAVITA ENGINEERING SER L Hits Lower Circuit for the 2nd Straight Session on NSE, 27 October 2026\",\"description\":\"RAVITA ENGINEERING SER lower circuit streak on NSE on 27 October 2026: the stock was locked at Rs 107.7, a -4.98% move. Price action, valuation and peer context.\",\"datePublished\":\"2026-10-27T06:35:37.189Z\",\"dateModified\":\"2026-10-27T06:35:37.189Z\",\"inLanguage\":\"en-IN\",\"articleSection\":\"Stock Market News\",\"keywords\":\"RAVITA ENGINEERING SER lower circuit streak, RAVITA ENGINEERING SER L share price, RAVITA lower circuit, lower circuit stocks today\",\"author\":{\"@type\":\"Organization\",\"name\":\"Univest\",\"url\":\"https:\/\/univest.in\"},\"publisher\":{\"@type\":\"Organization\",\"name\":\"Univest\",\"url\":\"https:\/\/univest.in\"},\"about\":{\"@type\":\"Corporation\",\"name\":\"RAVITA ENGINEERING SER L\",\"tickerSymbol\":\"RAVITA\",\"industry\":\"Engineering\",\"url\":\"https:\/\/univest.in\/stocks\/ravita\/ravita-engineering-ser-l-share-price-today\"},\"mentions\":[{\"@type\":\"Corporation\",\"name\":\"KP Green Engineering Ltd.\"},{\"@type\":\"Corporation\",\"name\":\"South West Pinnacle Exploration Ltd.\"},{\"@type\":\"Corporation\",\"name\":\"Anlon Technology Solution Ltd.\"},{\"@type\":\"Corporation\",\"name\":\"TAURIAN MPS LIMITED\"},{\"@type\":\"Corporation\",\"name\":\"Kataria Industries Ltd.\"}],\"citation\":[]},{\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Why did RAVITA ENGINEERING SER L hit lower circuit on 27 October 2026?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The stock reached its lower price band after selling pressure during the session. No official company announcement or verified external catalyst was confirmed at the time of writing.\"}},{\"@type\":\"Question\",\"name\":\"How many sessions has RAVITA ENGINEERING SER L hit lower circuit in a row?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"This is session 2 of the current run, which began on 26 October 2026. This page is updated each session rather than replaced with a new article.\"}},{\"@type\":\"Question\",\"name\":\"What was RAVITA share price on 27 October 2026?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The last traded price used in this article was Rs 107.7 on NSE. That price matched the lower circuit price captured for the event.\"}},{\"@type\":\"Question\",\"name\":\"What was the lower circuit price for RAVITA?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The lower circuit price was Rs 107.7. The stated exchange lower circuit limit was Rs 107.7. The event numbers in this article are aligned to NSE.\"}},{\"@type\":\"Question\",\"name\":\"What is RAVITA ENGINEERING SER L's market cap and PE ratio?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"RAVITA ENGINEERING SER L's market cap was Rs 427.11 crore. PE ratio was 15.23.\"}},{\"@type\":\"Question\",\"name\":\"Which exchange and data source were used?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The selected exchange was NSE. The article uses Univest market data available at the time of generation, captured on 27 October 2026.\"}},{\"@type\":\"Question\",\"name\":\"Does hitting a lower circuit mean RAVITA ENGINEERING SER L is a buy or a sell?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. A circuit is an exchange price-band rule that caps how far a stock can move in a single session. It carries no view on valuation or business quality and is not a recommendation. Any decision should rest on fundamentals, valuation, liquidity and your own risk tolerance.\"}},{\"@type\":\"Question\",\"name\":\"Can you buy or sell RAVITA ENGINEERING SER L shares when the stock is at the lower circuit?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It is usually difficult. At the lower circuit, sell orders queue up with few buyers, so exiting at the quoted price may not be possible. Orders can stay unfilled until buying interest returns.\"}},{\"@type\":\"Question\",\"name\":\"What happens the next trading session after a lower circuit?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"There is no fixed outcome. The band resets each session, so the stock can open freely, hit the same band again, or reverse. The exchange can also revise the applicable band width. The useful signals to watch are whether the company files any disclosure explaining the move.\"}},{\"@type\":\"Question\",\"name\":\"What is the lower circuit limit set at for Indian stocks?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Exchange price bands are commonly set at 2%, 5%, 10% or 20% depending on the security, and the applicable band can be revised by the exchange. For RAVITA ENGINEERING SER L the stated limit was Rs 107.7. For this session, RAVITA ENGINEERING SER L moved -4.98%.\"}}]}]}<\/script><\/div>\n","protected":false},"excerpt":{"rendered":"<p>RAVITA ENGINEERING SER lower circuit streak on NSE on 27 October 2026: the stock was locked at Rs 107.7, a -4.98% move. Price action, valuation and peer context.<\/p>\n","protected":false},"author":35,"featured_media":328094,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[],"class_list":["post-328095","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"metadata":{"rank_math_internal_links_processed":["1"],"_thumbnail_id":["328094"],"rank_math_title":["RAVITA ENGINEERING SER Lower Circuit Streak: Day 2 Price and Data"],"rank_math_description":["RAVITA ENGINEERING SER lower circuit streak on NSE on 27 October 2026: the stock was locked at Rs 107.7, a -4.98% move. Price action, valuation and peer context."],"rank_math_focus_keyword":["RAVITA ENGINEERING SER lower circuit streak"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/10\/ravita-engineering-ser-l-hits-lower-circuit-for-the-2nd-straight-session-on-nse.webp","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/328095","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/35"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=328095"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/328095\/revisions"}],"predecessor-version":[{"id":328096,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/328095\/revisions\/328096"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/328094"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=328095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=328095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=328095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}