{"id":282063,"date":"2026-10-01T09:33:36","date_gmt":"2026-10-01T04:03:36","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=282063"},"modified":"2026-10-01T09:33:36","modified_gmt":"2026-10-01T04:03:36","slug":"acme-solar-share-price-bess-commissioning","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/","title":{"rendered":"ACME Solar Commissions a 53.7 MW Battery Storage Phase in Rajasthan, and the Stock Is Already Overbought at an RSI of 71"},"content":{"rendered":"<p style=\"border-left:4px solid #1F4E79;background:#EBF3FB;padding:10px 16px;font-style:italic;\"><em>ACME Solar Rs 442, up 0.68% (1 Oct, 9:13 AM). Subsidiary commissions Phase-I BESS: 53.73 MW\/222.97 MWh of a 250 MW\/1,069 MWh FDRE project in Rajasthan. RSI 71.4, overbought.<\/em><\/p>\n<div style=\"background:#F0F9FF;border-left:4px solid #2E7D32;border-radius:6px;padding:14px 18px;margin:18px 0;\">\n<p style=\"margin:0;color:#1F4E79;font-size:14px;\"><strong>Quick Answer<\/strong><\/p>\n<p style=\"margin:8px 0 0;\">The ACME Solar share price was Rs 442 at 9:13 AM on 1 October 2026, up 0.68 percent, after the company&#8217;s wholly-owned subsidiary ACME Sigma Urja Private Limited commissioned Phase-I of the battery energy storage system component of a larger renewable project in Rajasthan. The commissioned phase covers 53.73 MW with 222.969 MWh of storage capacity, out of a total planned 250 MW and 1,069 MWh discharge capacity for the full firm dispatchable renewable energy project. Only the battery storage component has been commissioned so far; the corresponding renewable energy generation component of the project remains under development. The stock&#8217;s RSI of 71.4 is above the conventional overbought threshold of 70, suggesting the shares have already run up sharply ahead of today&#8217;s announcement.<\/p>\n<\/div>\n<p>ACME Solar Holdings Limited said its wholly-owned subsidiary ACME Sigma Urja Private Limited has commissioned Phase-I of the battery energy storage system component at a renewable project located in Neemri village, Rawatbhata tehsil, Chittorgarh district, Rajasthan, on 30 September 2026. The commissioned phase comprises 53.73 MW with 222.969 MWh of storage capacity.<\/p>\n<p style=\"margin-top:24px;\"><a href=\"https:\/\/univest.in\/user\/log-in?utm_source=blogs&#038;utm_medium=acme-solar-share-price-bess-commissioning\"><strong>Click Here &#8211; Get Free Investment Predictions<\/strong><\/a><\/p>\n<p>This is part of a larger firm dispatchable renewable energy project with a total planned capacity of 250 MW and 1,069 MWh of discharge capacity, of which only the battery storage portion has been commissioned so far. This article covers the project, the stock&#8217;s stretched technical position, and the risks for investors.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#What_ACME_Solars_Rajasthan_BESS_Commissioning_Covers\" title=\"What ACME Solar&#8217;s Rajasthan BESS Commissioning Covers\">What ACME Solar&#8217;s Rajasthan BESS Commissioning Covers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#ACME_Solar_Share_Price_Today_Numbers_and_Technical_Levels\" title=\"ACME Solar Share Price Today: Numbers and Technical Levels\">ACME Solar Share Price Today: Numbers and Technical Levels<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#Valuation_and_Leverage_Behind_the_ACME_Solar_Share_Price\" title=\"Valuation and Leverage Behind the ACME Solar Share Price\">Valuation and Leverage Behind the ACME Solar Share Price<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#Risks_for_the_ACME_Solar_Share_Price\" title=\"Risks for the ACME Solar Share Price\">Risks for the ACME Solar Share Price<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#Frequently_Asked_Questions\" title=\"Frequently Asked Questions\">Frequently Asked Questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#What_is_the_ACME_Solar_share_price_today\" title=\"What is the ACME Solar share price today?\">What is the ACME Solar share price today?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#What_has_ACME_Solar_commissioned_in_Rajasthan\" title=\"What has ACME Solar commissioned in Rajasthan?\">What has ACME Solar commissioned in Rajasthan?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#Has_the_full_Rajasthan_project_been_commissioned\" title=\"Has the full Rajasthan project been commissioned?\">Has the full Rajasthan project been commissioned?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#Is_the_ACME_Solar_share_price_overbought\" title=\"Is the ACME Solar share price overbought?\">Is the ACME Solar share price overbought?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#Is_the_ACME_Solar_share_price_expensive\" title=\"Is the ACME Solar share price expensive?\">Is the ACME Solar share price expensive?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#What_is_ACME_Solars_debt_level\" title=\"What is ACME Solar&#8217;s debt level?\">What is ACME Solar&#8217;s debt level?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#What_are_the_key_technical_levels_for_the_ACME_Solar_share_price\" title=\"What are the key technical levels for the ACME Solar share price?\">What are the key technical levels for the ACME Solar share price?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/univest.in\/blogs-2\/acme-solar-share-price-bess-commissioning\/#Should_I_buy_ACME_Solar_shares_after_this_announcement\" title=\"Should I buy ACME Solar shares after this announcement?\">Should I buy ACME Solar shares after this announcement?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"What_ACME_Solars_Rajasthan_BESS_Commissioning_Covers\"><\/span><strong>What ACME Solar&#8217;s Rajasthan BESS Commissioning Covers<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table border=\"1\" cellpadding=\"6\" style=\"border-collapse:collapse;width:100%;\">\n<tr>\n<th style=\"text-align:left;\">Item<\/th>\n<th style=\"text-align:left;\">Detail<\/th>\n<\/tr>\n<tr>\n<td>Subsidiary<\/td>\n<td>ACME Sigma Urja Private Limited<\/td>\n<\/tr>\n<tr>\n<td>Commissioned<\/td>\n<td>Phase-I of the battery energy storage system (BESS) component<\/td>\n<\/tr>\n<tr>\n<td>Capacity commissioned<\/td>\n<td>53.73 MW \/ 222.969 MWh<\/td>\n<\/tr>\n<tr>\n<td>Full project size<\/td>\n<td>250 MW \/ 1,069 MWh discharge capacity<\/td>\n<\/tr>\n<tr>\n<td>Location<\/td>\n<td>Neemri, Rawatbhata, Chittorgarh, Rajasthan<\/td>\n<\/tr>\n<tr>\n<td>Status of remaining components<\/td>\n<td>Renewable energy generation component still under development<\/td>\n<\/tr>\n<\/table>\n<p>The commissioned capacity represents about 21.5 percent of the full project&#8217;s planned MW capacity, so this is an early phase of a larger firm dispatchable renewable energy project that combines battery storage with generation capacity to provide more reliable, round-the-clock renewable power than standalone solar or wind.<\/p>\n<p style=\"font-style:italic;color:#000000;margin:14px 0;\">Also read &#8211; <a href=\"https:\/\/univest.in\/blogs\/stocks-to-watch-today-01102026\">Stocks to Watch Today: Alicon Castalloy Jumps 20%, Ircon and Rites Surge on Heavy Volume<\/a><\/p>\n<h2 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"ACME_Solar_Share_Price_Today_Numbers_and_Technical_Levels\"><\/span><strong>ACME Solar Share Price Today: Numbers and Technical Levels<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table border=\"1\" cellpadding=\"6\" style=\"border-collapse:collapse;width:100%;\">\n<tr>\n<th style=\"text-align:left;\">Metric<\/th>\n<th style=\"text-align:left;\">Value (1 Oct, 9:13 AM)<\/th>\n<\/tr>\n<tr>\n<td>ACME Solar share price<\/td>\n<td>Rs 442.00 (up 0.68%)<\/td>\n<\/tr>\n<tr>\n<td>Previous close<\/td>\n<td>Rs 439.00<\/td>\n<\/tr>\n<tr>\n<td>52-week high \/ low<\/td>\n<td>Rs 476.90 \/ Rs 195.90<\/td>\n<\/tr>\n<tr>\n<td>RSI (14-day)<\/td>\n<td>71.4<\/td>\n<\/tr>\n<tr>\n<td>SuperTrend<\/td>\n<td>Bullish, support at Rs 397.70<\/td>\n<\/tr>\n<tr>\n<td>20-day average<\/td>\n<td>Rs 427.36<\/td>\n<\/tr>\n<tr>\n<td>Market cap<\/td>\n<td>Rs 31,092 crore<\/td>\n<\/tr>\n<tr>\n<td>P\/E vs industry P\/E<\/td>\n<td>51.63 vs 23.35<\/td>\n<\/tr>\n<tr>\n<td>Debt to equity<\/td>\n<td>3.93<\/td>\n<\/tr>\n<\/table>\n<p>The ACME Solar share price is just 7.3 percent below its 52-week high of Rs 476.90, having more than doubled from its 52-week low of Rs 195.90. An RSI of 71.4 is above the conventional overbought line of 70, and the stock trades well above its 20-day average of Rs 427.36.<\/p>\n<p style=\"margin-top:24px;\"><a href=\"https:\/\/univest.in\/screeners\"><strong>Compare Renewable Energy Stocks on the Univest Screener<\/strong><\/a><\/p>\n<h2 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"Valuation_and_Leverage_Behind_the_ACME_Solar_Share_Price\"><\/span><strong>Valuation and Leverage Behind the ACME Solar Share Price<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>ACME Solar trades at a P\/E of 51.63 against a power sector industry average of 23.35, a substantial premium. Debt to equity of 3.93 is high, typical of a renewable energy developer that finances large capital-intensive projects with significant borrowing ahead of generating steady cash flows from long-term power purchase agreements.<\/p>\n<h2 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"Risks_for_the_ACME_Solar_Share_Price\"><\/span><strong>Risks for the ACME Solar Share Price<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>An overbought RSI of 71.4 raises the risk of near-term profit-taking, especially since the stock has already more than doubled from its 52-week low. High leverage, with debt to equity of 3.93, makes the company sensitive to interest rate movements and the pace at which new capacity starts generating revenue. Execution risk on the remaining renewable generation component of this Rajasthan project, and on ACME&#8217;s broader project pipeline, is a further factor, since only the storage portion has been commissioned so far.<\/p>\n<p style=\"margin-top:24px;\"><em>Download the <a href=\"http:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\">Univest iOS App<\/a> or <a href=\"http:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&#038;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\">Univest Android App<\/a> to track the ACME Solar share price and get alerts on project commissioning news.<\/em><\/p>\n<h2 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>ACME Solar Holdings&#8217; share price edged higher after its subsidiary commissioned the first phase of a battery storage project in Rajasthan, though the stock&#8217;s RSI of 71.4 shows it is already technically overbought after more than doubling from its 52-week low. The commissioning is a genuine project milestone, but high leverage and stretched near-term momentum are risks. Investors deciding whether to buy ACME Solar shares should watch the Rs 427.36 average as support, follow stop-loss levels and consult a SEBI-registered adviser.<\/p>\n<div style=\"background:#CC0000;border-radius:8px;padding:16px 20px;margin:24px 0;\">\n<p style=\"color:#FFFFFF;font-size:13px;line-height:1.7;margin:0;\"><strong style=\"color:#FFFFFF;\">Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data independently before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).<\/p>\n<\/div>\n<h2 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span><strong>Frequently Asked Questions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"What_is_the_ACME_Solar_share_price_today\"><\/span><strong>What is the ACME Solar share price today?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The ACME Solar Holdings share price was Rs 442 at 9:13 AM on 1 October 2026, up 0.68 percent from Rs 439.<\/p>\n<h3 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"What_has_ACME_Solar_commissioned_in_Rajasthan\"><\/span><strong>What has ACME Solar commissioned in Rajasthan?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Subsidiary ACME Sigma Urja commissioned Phase-I of a battery energy storage system, comprising 53.73 MW and 222.969 MWh, part of a larger 250 MW \/ 1,069 MWh firm dispatchable renewable energy project.<\/p>\n<h3 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"Has_the_full_Rajasthan_project_been_commissioned\"><\/span><strong>Has the full Rajasthan project been commissioned?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> No. Only the battery storage component has been commissioned so far; the renewable energy generation component remains under development.<\/p>\n<h3 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"Is_the_ACME_Solar_share_price_overbought\"><\/span><strong>Is the ACME Solar share price overbought?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Yes. The RSI of 71.4 is above the conventional overbought threshold of 70, after the stock more than doubled from its 52-week low.<\/p>\n<h3 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"Is_the_ACME_Solar_share_price_expensive\"><\/span><strong>Is the ACME Solar share price expensive?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The P\/E of 51.63 is well above the power sector industry average of 23.35.<\/p>\n<h3 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"What_is_ACME_Solars_debt_level\"><\/span><strong>What is ACME Solar&#8217;s debt level?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Debt to equity is 3.93, high and typical of a renewable energy developer funding large capital-intensive projects.<\/p>\n<h3 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"What_are_the_key_technical_levels_for_the_ACME_Solar_share_price\"><\/span><strong>What are the key technical levels for the ACME Solar share price?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The key levels are SuperTrend support at Rs 397.70 and the 20-day average of Rs 427.36.<\/p>\n<h3 style=\"font-weight:700;\"><span class=\"ez-toc-section\" id=\"Should_I_buy_ACME_Solar_shares_after_this_announcement\"><\/span><strong>Should I buy ACME Solar shares after this announcement?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The project milestone is positive, but the stock is technically overbought and carries high leverage. Use a stop-loss and consult a SEBI-registered adviser.<\/p>\n<div class=\"faq-schema\"><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is the ACME Solar share price today?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The ACME Solar Holdings share price was Rs 442 at 9:13 AM on 1 October 2026, up 0.68 percent from Rs 439.\"}},{\"@type\":\"Question\",\"name\":\"What has ACME Solar commissioned in Rajasthan?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Subsidiary ACME Sigma Urja commissioned Phase-I of a battery energy storage system, comprising 53.73 MW and 222.969 MWh, part of a larger 250 MW \/ 1,069 MWh firm dispatchable renewable energy project.\"}},{\"@type\":\"Question\",\"name\":\"Has the full Rajasthan project been commissioned?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Only the battery storage component has been commissioned so far; the renewable energy generation component remains under development.\"}},{\"@type\":\"Question\",\"name\":\"Is the ACME Solar share price overbought?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. The RSI of 71.4 is above the conventional overbought threshold of 70, after the stock more than doubled from its 52-week low.\"}},{\"@type\":\"Question\",\"name\":\"Is the ACME Solar share price expensive?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The P\/E of 51.63 is well above the power sector industry average of 23.35.\"}},{\"@type\":\"Question\",\"name\":\"What is ACME Solar's debt level?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Debt to equity is 3.93, high and typical of a renewable energy developer funding large capital-intensive projects.\"}},{\"@type\":\"Question\",\"name\":\"What are the key technical levels for the ACME Solar share price?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The key levels are SuperTrend support at Rs 397.70 and the 20-day average of Rs 427.36.\"}},{\"@type\":\"Question\",\"name\":\"Should I buy ACME Solar shares after this announcement?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The project milestone is positive, but the stock is technically overbought and carries high leverage. Use a stop-loss and consult a SEBI-registered adviser.\"}}]}<\/script><\/div>\n","protected":false},"excerpt":{"rendered":"<p>ACME Solar commissioned a battery storage phase in Rajasthan, but the stock is already overbought. Here is the project detail, levels and risks.<\/p>\n","protected":false},"author":28,"featured_media":282061,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[5824,1019],"class_list":["post-282063","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-renewable-energy-stocks","tag-stock-market"],"metadata":{"rank_math_internal_links_processed":["1"],"_thumbnail_id":["282061"],"rank_math_title":["ACME Solar Share Price: 53.7 MW BESS Phase Commissioned"],"rank_math_description":["ACME Solar share price is Rs 442, up 0.68%, after its subsidiary commissioned Phase-I of a 53.7 MW battery storage project in Rajasthan. Levels and risks explained."],"rank_math_focus_keyword":["ACME Solar share price"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/10\/acme-solar-commissions-a-53-7-mw-battery-storage-phase-in-rajasthan-and-the.webp","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/282063","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=282063"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/282063\/revisions"}],"predecessor-version":[{"id":282064,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/282063\/revisions\/282064"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/282061"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=282063"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=282063"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=282063"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}