{"id":228600,"date":"2026-09-03T10:23:03","date_gmt":"2026-09-03T04:53:03","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=228600"},"modified":"2026-09-03T10:23:04","modified_gmt":"2026-09-03T04:53:04","slug":"power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/","title":{"rendered":"Power Grid Share Price in Focus After Receiving Rs 3,244 Crore Letter of Intent for Rajasthan-Maharashtra Transmission Project"},"content":{"rendered":"<div class=\"meta-block\"><\/div>\n<p style=\"border-left: 4px solid #1F4E79; background: #EBF3FB; padding: 10px 16px; font-style: italic;\"><em>Power Grid share price Rs 269.9, up 1.16%. Received LoI for Rs 3,244.33 crore Rajasthan-Maharashtra transmission project on BOOT basis, including 6,000 MW HVDC terminals.<\/em><\/p>\n<div style=\"background: #F0F9FF; border-left: 4px solid #2E7D32; border-radius: 6px; padding: 14px 18px; margin: 18px 0;\">\n<p style=\"margin: 0; color: #1f4e79; font-size: 14px;\"><strong>Quick Answer<\/strong><\/p>\n<p style=\"margin: 8px 0 0;\">Power Grid share price is in focus on 3 September 2026 after the company received a Letter of Intent for an inter-state transmission system project for the evacuation of power from Rajasthan REZ Phase-IV, structured on a build, own, operate and transfer basis, at quoted annual transmission charges of Rs 3,244.33 crore. The project comprises the establishment of 6,000 MW plus or minus 800 kV HVDC terminals at Barmer-II in Rajasthan and South Kalamb substation in Maharashtra, along with the augmentation of the South Kalamb substation. Power Grid share price traded at Rs 269.9 on 3 September 2026, up 1.16 percent on the day.<\/p>\n<\/div>\n<p>Power Grid share price is in focus on 3 September 2026 after the company received a Letter of Intent for a major inter-state transmission project. The project is designed for the evacuation of power from Rajasthan&#8217;s renewable energy zone Phase-IV, structured on a build, own, operate and transfer basis.<\/p>\n<p>The quoted annual transmission charges for the project stand at Rs 3,244.33 crore, and the scope includes the establishment of 6,000 MW plus or minus 800 kV HVDC terminals at Barmer-II in Rajasthan and the South Kalamb substation in Maharashtra, along with augmentation works at the South Kalamb substation.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/user\/log-in?utm_source=blogs&amp;utm_medium=d2art10\"><strong>Click Here &#8211; Get Free Investment Predictions<\/strong><\/a><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#What_Does_the_Rajasthan-Maharashtra_Transmission_Project_Involve\" title=\"What Does the Rajasthan-Maharashtra Transmission Project Involve?\">What Does the Rajasthan-Maharashtra Transmission Project Involve?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#What_Is_the_BOOT_Structure_and_Why_Does_It_Matter_for_Power_Grid_Share_Price\" title=\"What Is the BOOT Structure and Why Does It Matter for Power Grid Share Price?\">What Is the BOOT Structure and Why Does It Matter for Power Grid Share Price?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#Power_Grid_Company_Overview_and_Valuation\" title=\"Power Grid Company Overview and Valuation\">Power Grid Company Overview and Valuation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#What_Should_Investors_Watch_for_Power_Grid_Going_Forward\" title=\"What Should Investors Watch for Power Grid Going Forward?\">What Should Investors Watch for Power Grid Going Forward?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#Frequently_Asked_Questions\" title=\"Frequently Asked Questions\">Frequently Asked Questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#Why_is_Power_Grid_share_price_in_focus_today\" title=\"Why is Power Grid share price in focus today?\">Why is Power Grid share price in focus today?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#What_does_the_Rajasthan-Maharashtra_transmission_project_involve\" title=\"What does the Rajasthan-Maharashtra transmission project involve?\">What does the Rajasthan-Maharashtra transmission project involve?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#What_is_the_BOOT_basis_mentioned_in_the_Power_Grid_project\" title=\"What is the BOOT basis mentioned in the Power Grid project?\">What is the BOOT basis mentioned in the Power Grid project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#What_is_Power_Grids_current_share_price\" title=\"What is Power Grid&#8217;s current share price?\">What is Power Grid&#8217;s current share price?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#What_is_Power_Grids_market_capitalisation\" title=\"What is Power Grid&#8217;s market capitalisation?\">What is Power Grid&#8217;s market capitalisation?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#What_is_Power_Grids_dividend_yield\" title=\"What is Power Grid&#8217;s dividend yield?\">What is Power Grid&#8217;s dividend yield?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03\/#Why_is_transmission_infrastructure_important_for_renewable_energy\" title=\"Why is transmission infrastructure important for renewable energy?\">Why is transmission infrastructure important for renewable energy?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"What_Does_the_Rajasthan-Maharashtra_Transmission_Project_Involve\"><\/span><strong>What Does the Rajasthan-Maharashtra Transmission Project Involve?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The project behind today&#8217;s move in Power Grid share price is designed to evacuate power generated from Rajasthan&#8217;s renewable energy zone Phase-IV over long distances to Maharashtra. It involves setting up 6,000 MW HVDC terminals rated at plus or minus 800 kV at Barmer-II in Rajasthan and at the South Kalamb substation in Maharashtra, technology used for transmitting large amounts of power efficiently over long distances with lower losses than conventional AC transmission.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_Is_the_BOOT_Structure_and_Why_Does_It_Matter_for_Power_Grid_Share_Price\"><\/span><strong>What Is the BOOT Structure and Why Does It Matter for Power Grid Share Price?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The project is structured on a build, own, operate and transfer, or BOOT, basis, meaning Power Grid will build, own and operate the transmission assets and earn revenue through the quoted annual transmission charges of Rs 3,244.33 crore over the contract period, providing long-term, annuity-like cash flows that support Power Grid share price over time.<\/p>\n<p>This BOOT-based revenue model is central to Power Grid&#8217;s business, since the company earns a regulated or competitively-bid tariff for building and operating transmission infrastructure, offering relatively predictable and inflation-linked cash flows that are attractive to long-term investors in Power Grid share price.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Power_Grid_Company_Overview_and_Valuation\"><\/span><strong>Power Grid Company Overview and Valuation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Power Grid share price reflects a market capitalisation of around Rs 2,48,791 crore and a price to earnings ratio of 15.65, below the broader power sector average of 22.77. The company offers a dividend yield of 3.36 percent, with a return on equity of 15.85 percent, reflecting Power Grid&#8217;s position as India&#8217;s dominant inter-state power transmission utility.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/screeners\"><strong>Check Live Stock Data on the Univest Screener<\/strong><\/a><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_Should_Investors_Watch_for_Power_Grid_Going_Forward\"><\/span><strong>What Should Investors Watch for Power Grid Going Forward?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Investors tracking Power Grid share price should watch for the formal award of the project following this Letter of Intent, along with execution timelines for the HVDC terminals at Barmer-II and South Kalamb. India&#8217;s continued renewable energy capacity additions, which require substantial new transmission infrastructure to evacuate power from generation-rich states like Rajasthan, remain a key structural growth driver for Power Grid share price.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Power Grid share price is in focus after the company received a Letter of Intent for a Rs 3,244.33 crore Rajasthan-Maharashtra transmission project on a build, own, operate and transfer basis, involving 6,000 MW HVDC terminals. The project adds to Power Grid&#8217;s already substantial order pipeline tied to India&#8217;s renewable energy build-out. Investors should track the formal award and execution progress, and consult a SEBI-registered advisor before making any investment decision.<\/p>\n<p style=\"margin-top: 24px;\"><em>Download the <a href=\"http:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\">Univest iOS App<\/a> or <a href=\"http:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&amp;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\">Univest Android App<\/a> to track live prices and get daily stock updates.<\/em><\/p>\n<div style=\"background: #CC0000; border-radius: 8px; padding: 16px 20px; margin: 24px 0;\">\n<p style=\"color: #ffffff; font-size: 13px; line-height: 1.7; margin: 0;\"><strong style=\"color: #ffffff;\">Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data with the official NSE (nseindia.com) and BSE (bseindia.com) websites before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).<\/p>\n<\/div>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span><strong>Frequently Asked Questions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Why_is_Power_Grid_share_price_in_focus_today\"><\/span><strong>Why is Power Grid share price in focus today?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Power Grid share price is in focus after the company received a Letter of Intent for a Rs 3,244.33 crore inter-state transmission project connecting Rajasthan and Maharashtra.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_does_the_Rajasthan-Maharashtra_transmission_project_involve\"><\/span><strong>What does the Rajasthan-Maharashtra transmission project involve?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The project involves establishing 6,000 MW plus or minus 800 kV HVDC terminals at Barmer-II in Rajasthan and the South Kalamb substation in Maharashtra, to evacuate power from Rajasthan&#8217;s REZ Phase-IV.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_BOOT_basis_mentioned_in_the_Power_Grid_project\"><\/span><strong>What is the BOOT basis mentioned in the Power Grid project?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> BOOT stands for build, own, operate and transfer, a structure under which Power Grid builds, owns and operates the transmission assets and earns revenue through quoted annual transmission charges.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_Power_Grids_current_share_price\"><\/span><strong>What is Power Grid&#8217;s current share price?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Power Grid share price traded at Rs 269.9 on 3 September 2026, up 1.16 percent on the day.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_Power_Grids_market_capitalisation\"><\/span><strong>What is Power Grid&#8217;s market capitalisation?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Power Grid&#8217;s market capitalisation stood at approximately Rs 2,48,791 crore as of the latest available data.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_Power_Grids_dividend_yield\"><\/span><strong>What is Power Grid&#8217;s dividend yield?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Power Grid offers a dividend yield of around 3.36 percent, reflecting its stable, regulated cash flow business model.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Why_is_transmission_infrastructure_important_for_renewable_energy\"><\/span><strong>Why is transmission infrastructure important for renewable energy?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> New transmission infrastructure like the Rajasthan-Maharashtra HVDC link is needed to evacuate power generated from renewable energy zones to demand centres in other states, making it a key enabler of India&#8217;s renewable energy expansion.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power Grid share price is in focus after the company received a Letter of Intent for an inter-state transmission project evacuating power from Rajasthan REZ Phase-IV, with quoted annual transmission charges of Rs 3,244.33 crore.<\/p>\n","protected":false},"author":28,"featured_media":228597,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[3802],"class_list":["post-228600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-market","tag-news"],"metadata":{"rank_math_internal_links_processed":["1"],"_thumbnail_id":["228597"],"_edit_lock":["1788411187:28"],"_last_editor_used_jetpack":["block-editor"],"rank_math_primary_category":["24"],"rank_math_seo_score":["79"],"rank_math_title":["Power Grid Share Price in Focus on Rs 3,244 Cr LoI"],"rank_math_description":["Power Grid share price is in focus after receiving a Letter of Intent for a Rs 3,244 crore Rajasthan-Maharashtra HVDC transmission project on a BOOT basis."],"rank_math_focus_keyword":["Power Grid share price"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"_edit_last":["28"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["41169"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/09\/power-grid-share-price-rajasthan-maharashtra-transmission-loi-2026-09-03.png","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/228600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=228600"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/228600\/revisions"}],"predecessor-version":[{"id":228871,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/228600\/revisions\/228871"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/228597"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=228600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=228600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=228600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}