{"id":198328,"date":"2026-08-12T10:56:48","date_gmt":"2026-08-12T05:26:48","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=198328"},"modified":"2026-08-12T10:56:50","modified_gmt":"2026-08-12T05:26:50","slug":"afcons-infrastructure-vs-power-mech-projects-comparison","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/","title":{"rendered":"Afcons Infrastructure vs Power Mech Projects: Share Price, Comparison and Key Differences"},"content":{"rendered":"<div class=\"meta-block\"><\/div>\n<p style=\"border-left: 4px solid #1F4E79; background: #EBF3FB; padding: 10px 16px; font-style: italic;\"><em>Afcons Infrastructure MCap Rs 10,048 Cr, PE 40.06x, ROE 5.29%, D\/E 0.67. Power Mech Projects MCap Rs 8,263 Cr, PE 20.07x, ROE 14.45%, D\/E 0.26.<\/em><\/p>\n<p>Afcons Infrastructure vs Power Mech Projects is a comparison large-scale EPC investors look up when evaluating two listed Indian construction companies with distinct engineering specialties. Afcons Infrastructure, a Mumbai-based company (Shapoorji Pallonji group), is one of India&#8217;s largest EPC contractors specialising in marine, underground, surface transport and hydro projects globally. Power Mech Projects, a Hyderabad-based company, specialises in power plant construction, operation and maintenance (O&amp;M) services, and has been expanding into civil construction and industrial EPC. Both Afcons Infrastructure vs Power Mech Projects are large infrastructure EPC companies listed in India.<\/p>\n<p>This Afcons Infrastructure vs Power Mech Projects article covers reach and market position, key products, latest declared results and stock valuation. All data is sourced from Groww and public company filings.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Reach_and_Market_Position\" title=\"Reach and Market Position\">Reach and Market Position<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Key_Products_and_Business_Mix\" title=\"Key Products and Business Mix\">Key Products and Business Mix<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Latest_Results_and_Financial_Data\" title=\"Latest Results and Financial Data\">Latest Results and Financial Data<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Stock_Performance_and_Valuation\" title=\"Stock Performance and Valuation\">Stock Performance and Valuation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Afcons_Infrastructure_vs_Power_Mech_Projects_Quick_Comparison_Table\" title=\"Afcons Infrastructure vs Power Mech Projects: Quick Comparison Table\">Afcons Infrastructure vs Power Mech Projects: Quick Comparison Table<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Frequently_Asked_Questions\" title=\"Frequently Asked Questions\">Frequently Asked Questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#What_does_Afcons_Infrastructure_build\" title=\"What does Afcons Infrastructure build?\">What does Afcons Infrastructure build?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#What_does_Power_Mech_Projects_do\" title=\"What does Power Mech Projects do?\">What does Power Mech Projects do?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Who_owns_Afcons_Infrastructure\" title=\"Who owns Afcons Infrastructure?\">Who owns Afcons Infrastructure?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#What_is_power_plant_O_M\" title=\"What is power plant O&amp;M?\">What is power plant O&amp;M?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Which_has_higher_financial_metrics_Afcons_or_Power_Mech\" title=\"Which has higher financial metrics, Afcons or Power Mech?\">Which has higher financial metrics, Afcons or Power Mech?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Are_Afcons_and_Power_Mech_in_Nifty_50\" title=\"Are Afcons and Power Mech in Nifty 50?\">Are Afcons and Power Mech in Nifty 50?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/univest.in\/blogs-2\/afcons-infrastructure-vs-power-mech-projects-comparison\/#Which_is_larger\" title=\"Which is larger?\">Which is larger?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Reach_and_Market_Position\"><\/span><strong>Reach and Market Position<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>In this Afcons Infrastructure vs Power Mech Projects comparison, Afcons executes marine construction, underground metro, highways, bridges and hydropower projects across India and internationally. Market capitalisation is Rs 10,048 Cr.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/user\/log-in?utm_source=blogs&amp;utm_medium=afcons-vs-powermech\"><strong>Click Here &#8211; Get Free Investment Predictions<\/strong><\/a><\/p>\n<p>Power Mech Projects executes power plant construction, balance of plant (BOP) and O&amp;M services and civil construction across India. Market capitalisation is Rs 8,263 Cr.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Key_Products_and_Business_Mix\"><\/span><strong>Key Products and Business Mix<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>For the Afcons Infrastructure vs Power Mech Projects product breakdown, Afcons Infrastructure: Afcons earns from EPC contracts in marine, underground and surface transport infrastructure. EPS is Rs 6.82. PE is 40.06x, ROE 5.29 percent, D\/E 0.67.<\/p>\n<p>Power Mech Projects: Power Mech earns from power plant EPC, BOP, O&amp;M and civil construction contracts. EPS is Rs 130.21. PE is 20.07x, ROE 14.45 percent, D\/E 0.26.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Latest_Results_and_Financial_Data\"><\/span><strong>Latest Results and Financial Data<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>On the Afcons Infrastructure vs Power Mech Projects results front: Afcons Infrastructure has a market cap of Rs 10,048 Cr and PE of 40.06x. ROE is 5.29 percent &#8211; thin ROE from the large capital intensity of EPC projects. Afcons is 1.2 times larger than Power Mech Projects.<\/p>\n<p>Power Mech Projects has a market cap of Rs 8,263 Cr and PE of 20.07x. ROE is 14.45 percent &#8211; significantly higher than Afcons. Power Mech is cheaper on PE and more capital-efficient.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/screeners\"><strong>Compare Afcons Infrastructure and Power Mech Projects Fundamentals on the Univest Screener<\/strong><\/a><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Stock_Performance_and_Valuation\"><\/span><strong>Stock Performance and Valuation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Investors tracking the Afcons Infrastructure vs Power Mech Projects comparison should verify current prices on NSE or BSE before trading. The Afcons Infrastructure vs Power Mech Projects stock data below reflects the latest available figures from Groww and public company filings.<\/p>\n<p>Afcons Infrastructure vs Power Mech Projects at current valuations: Afcons trades at Rs 10,048 Cr market cap, PE 40.06x, ROE 5.29 percent. Power Mech trades at Rs 8,263 Cr market cap, PE 20.07x, ROE 14.45 percent. Power Mech is cheaper on PE and has a much higher ROE than Afcons, reflecting its capital-efficient O&amp;M model.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Afcons_Infrastructure_vs_Power_Mech_Projects_Quick_Comparison_Table\"><\/span><strong>Afcons Infrastructure vs Power Mech Projects: Quick Comparison Table<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The comparison table below summarises the key metrics side by side.<\/p>\n<table style=\"border-collapse: collapse; width: 100%;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #ccc; padding: 8px;\">Parameter<\/th>\n<th style=\"border: 1px solid #ccc; padding: 8px;\"><a href=\"https:\/\/univest.in\/user\/stocks\/afcons\/afcons-infrastructure-ltd-share-price-today\">Afcons Infrastructure<\/a><\/th>\n<th style=\"border: 1px solid #ccc; padding: 8px;\"><a href=\"https:\/\/univest.in\/user\/stocks\/powermech\/power-mech-projects-ltd-share-price-today\">Power Mech Projects<\/a><\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Sector<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Marine + underground + transport EPC, international (Shapoorji Pallonji)<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Power plant EPC + BOP + O&amp;M services + civil construction<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Market Cap<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Rs 10,048 Cr<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Rs 8,263 Cr<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">P\/E Ratio<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">40.06x<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">20.07x<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">ROE<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">5.29%<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">14.45%<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Debt to Equity<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">0.67<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">0.26<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Specialty<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Marine, underground metro, hydro, global EPC<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Power plant construction + O&amp;M services<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">Dividend Yield<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">0.73%<\/td>\n<td style=\"border: 1px solid #ccc; padding: 8px;\">0.06%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The Afcons Infrastructure vs Power Mech Projects comparison above covers reach, products, results and valuation. Afcons Infrastructure vs Power Mech Projects covers large civil EPC versus power plant EPC and O&amp;M. Afcons has a prestigious large-project EPC track record including iconic marine and underground projects. Power Mech has a recurring O&amp;M revenue model alongside EPC that supports capital efficiency. Afcons vs Power Mech investors should track order book growth, execution pace and margin sustainability. Consult a SEBI-registered advisor for personalised guidance.<\/p>\n<p style=\"margin-top: 24px;\"><em>Download the <a href=\"https:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\">Univest iOS App<\/a> or <a href=\"https:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&amp;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\">Univest Android App<\/a> to track Afcons Infrastructure and Power Mech Projects live price and get daily stock recommendations.<\/em><\/p>\n<div style=\"background: #CC0000; border-radius: 8px; padding: 16px 20px; margin: 24px 0;\">\n<p style=\"color: #ffffff; font-size: 13px; line-height: 1.7; margin: 0;\"><strong style=\"color: #ffffff;\">Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data with the official NSE (nseindia.com) and BSE (bseindia.com) websites before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).<\/p>\n<\/div>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span><strong>Frequently Asked Questions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"What_does_Afcons_Infrastructure_build\"><\/span><strong>What does Afcons Infrastructure build?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Afcons Infrastructure constructs marine civil works (jetties, ports, sea defence), underground metro stations and tunnels, highways, bridges, cable-stayed bridges, and hydropower projects across India and 12+ countries.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_does_Power_Mech_Projects_do\"><\/span><strong>What does Power Mech Projects do?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Power Mech Projects constructs power plant civil and mechanical infrastructure (boilers, turbines, cooling towers), provides balance of plant (BOP) services and manages operations and maintenance (O&amp;M) contracts at power plants.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Who_owns_Afcons_Infrastructure\"><\/span><strong>Who owns Afcons Infrastructure?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Afcons Infrastructure is part of the Shapoorji Pallonji Group &#8211; one of India&#8217;s largest and oldest construction conglomerates. Afcons listed on Indian exchanges in 2024.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_power_plant_O_M\"><\/span><strong>What is power plant O&amp;M?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Power plant O&amp;M (Operations and Maintenance) involves running and maintaining power generation facilities on contract. Power Mech Projects provides O&amp;M services where it manages a power plant on behalf of the plant owner.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Which_has_higher_financial_metrics_Afcons_or_Power_Mech\"><\/span><strong>Which has higher financial metrics, Afcons or Power Mech?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Power Mech Projects has a higher ROE (14.45% vs 5.29%) and lower PE (20.07x vs 40.06x), reflecting its capital-efficient O&amp;M model. Afcons is in large capital-intensive EPC mode.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Are_Afcons_and_Power_Mech_in_Nifty_50\"><\/span><strong>Are Afcons and Power Mech in Nifty 50?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Neither is in Nifty 50. Both are tracked in smaller indices.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Which_is_larger\"><\/span><strong>Which is larger?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Afcons Infrastructure at Rs 10,048 Cr is approximately 1.2 times larger than Power Mech Projects at Rs 8,263 Cr.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Afcons Infrastructure vs Power Mech Projects compared on large-scale EPC, marine civil, power plant O&#038;M, ROE and valuation. Full data-backed breakdown.<\/p>\n","protected":false},"author":35,"featured_media":198327,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[3802],"class_list":["post-198328","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-news"],"metadata":{"rank_math_internal_links_processed":["1"],"_thumbnail_id":["198327"],"_edit_lock":["1786512412:29"],"_last_editor_used_jetpack":["block-editor"],"rank_math_primary_category":["842"],"rank_math_seo_score":["71"],"rank_math_title":["Afcons Infrastructure vs Power Mech Projects: Which EPC Stock"],"rank_math_description":["Afcons Infrastructure vs Power Mech Projects compared on large-scale EPC, marine civil, power plant O&amp;M, ROE and valuation. Full data-backed breakdown."],"rank_math_focus_keyword":["Afcons Infrastructure vs Power Mech Projects"],"rank_math_robots":["a:2:{i:0;s:8:\"nofollow\";i:1;s:7:\"noindex\";}"],"_edit_last":["29"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["36183"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/08\/afcons-infrastructure-vs-power-mech-projects-comparison.png","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/198328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/35"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=198328"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/198328\/revisions"}],"predecessor-version":[{"id":198360,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/198328\/revisions\/198360"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/198327"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=198328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=198328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=198328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}