{"id":162256,"date":"2026-07-21T15:57:38","date_gmt":"2026-07-21T10:27:38","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=162256"},"modified":"2026-07-21T15:57:39","modified_gmt":"2026-07-21T10:27:39","slug":"viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/","title":{"rendered":"Viviana Power Tech Share Price in Focus After Commissioning 400 kV Line for 323.4 MW Gujarat Wind Park"},"content":{"rendered":"<div class=\"meta-block\"><\/div>\n<p style=\"border-left: 4px solid #1F4E79; background: #EBF3FB; padding: 10px 16px; font-style: italic;\"><em>Viviana Power Tech share price at Rs 704.85, up 0.27%. Commissioned 400 kV Double-Circuit LILO transmission line for a 323.4 MW wind park in Gujarat. Volume up 34.58% vs 5-day average.<\/em><\/p>\n<p>The Viviana Power Tech share price is in focus on 21 July 2026 after the company announced the successful commissioning of its 400 kV Double Circuit LILO transmission line serving a 323.4 MW wind park in Gujarat. The stock was quoting at Rs 704.85, broadly steady on the day, after touching an intraday high of Rs 707.45 and a low of Rs 675.05.<\/p>\n<p>Trading volumes were notably elevated at 20,187 shares, an increase of 34.58 percent over the stock&#8217;s five day average of 15,000 shares, indicating the commissioning news drew incremental investor attention beyond a typical session.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/user\/log-in\"><strong>Click Here &#8211; Get Free Investment Predictions<\/strong><\/a><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#About_Viviana_Power_Tech\" title=\"About Viviana Power Tech\">About Viviana Power Tech<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#What_the_400_kV_Line_Commissioning_Means_for_Viviana_Power_Tech_Share_Price\" title=\"What the 400 kV Line Commissioning Means for Viviana Power Tech Share Price\">What the 400 kV Line Commissioning Means for Viviana Power Tech Share Price<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#Indias_Renewable_Transmission_Buildout_Context\" title=\"India&#8217;s Renewable Transmission Buildout Context\">India&#8217;s Renewable Transmission Buildout Context<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#FAQs_on_Viviana_Power_Tech_Share_Price\" title=\"FAQs on Viviana Power Tech Share Price\">FAQs on Viviana Power Tech Share Price<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#Why_is_Viviana_Power_Tech_share_price_in_focus_on_21_July_2026\" title=\"Why is Viviana Power Tech share price in focus on 21 July 2026?\">Why is Viviana Power Tech share price in focus on 21 July 2026?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#What_is_a_LILO_transmission_line\" title=\"What is a LILO transmission line?\">What is a LILO transmission line?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#What_is_the_trading_volume_in_Viviana_Power_Tech_share_price_today\" title=\"What is the trading volume in Viviana Power Tech share price today?\">What is the trading volume in Viviana Power Tech share price today?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#What_does_Viviana_Power_Tech_do\" title=\"What does Viviana Power Tech do?\">What does Viviana Power Tech do?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#Why_does_the_400_kV_voltage_class_matter_for_this_project\" title=\"Why does the 400 kV voltage class matter for this project?\">Why does the 400 kV voltage class matter for this project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#Is_Viviana_Power_Tech_share_price_a_buy_after_this_news\" title=\"Is Viviana Power Tech share price a buy after this news?\">Is Viviana Power Tech share price a buy after this news?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/viviana-power-tech-share-price-transmission-line-commissioning-21-july-2026\/#Where_can_I_track_Viviana_Power_Tech_share_price_live\" title=\"Where can I track Viviana Power Tech share price live?\">Where can I track Viviana Power Tech share price live?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"About_Viviana_Power_Tech\"><\/span><strong>About Viviana Power Tech<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><a href=\"https:\/\/univest.in\/stocks\/viviana\/viviana-power-tech-ltd-share-price-today\">Viviana Power Tech<\/a> operates in the power transmission infrastructure space, developing and executing high voltage transmission line projects that connect renewable energy generation capacity, such as wind and solar parks, to the broader electricity grid.<\/p>\n<p>LILO, or Loop-In Loop-Out, transmission lines are a common configuration used to tap an existing high voltage transmission corridor to connect new generation capacity without building an entirely separate line to the nearest substation, making them a capital efficient way to integrate renewable projects into the grid.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/sebi-registered-investment-advisor-india\"><strong>Consult a SEBI Registered Investment Advisor on Univest<\/strong><\/a><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_the_400_kV_Line_Commissioning_Means_for_Viviana_Power_Tech_Share_Price\"><\/span><strong>What the 400 kV Line Commissioning Means for Viviana Power Tech Share Price<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The successful commissioning of a 400 kV double circuit line is a significant capacity milestone, since 400 kV is among the higher voltage classes used in India&#8217;s transmission network, typically reserved for large scale power evacuation projects. Serving a 323.4 MW wind park places this project among the more substantial renewable integration assets the company has delivered.<\/p>\n<p>For the Viviana Power Tech share price, project commissioning milestones are important markers of execution capability, since transmission infrastructure companies are often evaluated on their ability to deliver complex projects on time, which can support their positioning for future order wins in India&#8217;s expanding renewable energy transmission pipeline.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Indias_Renewable_Transmission_Buildout_Context\"><\/span><strong>India&#8217;s Renewable Transmission Buildout Context<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>India&#8217;s renewable energy capacity addition targets continue to require substantial investment in transmission infrastructure to evacuate power from wind and solar generation sites, many of which are located in resource rich but grid distant regions such as Gujarat, Rajasthan, and Tamil Nadu.<\/p>\n<p>Companies like Viviana Power Tech that specialise in this transmission integration work stand to benefit from sustained policy support for renewable capacity addition, since every new gigawatt of wind or solar capacity typically requires proportional investment in evacuation infrastructure, a structural tailwind relevant to the Viviana Power Tech share price outlook.<\/p>\n<p style=\"margin-top: 24px;\"><em>Download the <a href=\"http:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\">Univest iOS App<\/a> or <a href=\"http:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&amp;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\">Univest Android App<\/a> to track Viviana Power Tech share price live and get project execution alerts.<\/em><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Viviana Power Tech&#8217;s commissioning of its 400 kV double circuit LILO transmission line for a 323.4 MW wind park in Gujarat has put the Viviana Power Tech share price in focus on 21 July 2026, with trading volumes running well above the recent average. The milestone reinforces the company&#8217;s execution track record in renewable energy transmission infrastructure. Investors should track further order wins and project delivery updates, and consult a SEBI registered adviser before acting on the Viviana Power Tech share price.<\/p>\n<div style=\"background: #CC0000; border-radius: 8px; padding: 16px 20px; margin: 24px 0;\">\n<p style=\"color: #ffffff; font-size: 13px; line-height: 1.7; margin: 0;\"><strong style=\"color: #ffffff;\">Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data with the official NSE (nseindia.com) and BSE (bseindia.com) websites before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).<\/p>\n<\/div>\n<h2><span class=\"ez-toc-section\" id=\"FAQs_on_Viviana_Power_Tech_Share_Price\"><\/span><strong>FAQs on Viviana Power Tech Share Price<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Why_is_Viviana_Power_Tech_share_price_in_focus_on_21_July_2026\"><\/span><strong>Why is Viviana Power Tech share price in focus on 21 July 2026?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The Viviana Power Tech share price is in focus after the company announced the successful commissioning of its 400 kV Double Circuit LILO transmission line serving a 323.4 MW wind park in Gujarat.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_a_LILO_transmission_line\"><\/span><strong>What is a LILO transmission line?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> LILO, or Loop-In Loop-Out, is a transmission line configuration that taps an existing high voltage corridor to connect new generation capacity to the grid, offering a capital efficient way to integrate renewable projects.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_trading_volume_in_Viviana_Power_Tech_share_price_today\"><\/span><strong>What is the trading volume in Viviana Power Tech share price today?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Trading volume stood at 20,187 shares, an increase of 34.58 percent over the stock&#8217;s five day average of 15,000 shares, reflecting heightened investor interest following the commissioning news.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_does_Viviana_Power_Tech_do\"><\/span><strong>What does Viviana Power Tech do?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Viviana Power Tech operates in power transmission infrastructure, developing and executing high voltage transmission line projects that connect renewable energy generation capacity to the broader electricity grid.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Why_does_the_400_kV_voltage_class_matter_for_this_project\"><\/span><strong>Why does the 400 kV voltage class matter for this project?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> 400 kV is among the higher voltage classes used in India&#8217;s transmission network, typically reserved for large scale power evacuation projects, making this a significant capacity milestone for the company.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Is_Viviana_Power_Tech_share_price_a_buy_after_this_news\"><\/span><strong>Is Viviana Power Tech share price a buy after this news?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> This article does not constitute investment advice. Investors should evaluate the company&#8217;s broader order book and execution track record, and consult a SEBI registered adviser before acting on the Viviana Power Tech share price.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Where_can_I_track_Viviana_Power_Tech_share_price_live\"><\/span><strong>Where can I track Viviana Power Tech share price live?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> You can track the Viviana Power Tech share price live on the Univest app and website, along with project execution and corporate action alerts.<\/p>\n<div class=\"faq-schema\"><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Why is Viviana Power Tech share price in focus on 21 July 2026?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Viviana Power Tech share price is in focus after the company announced the successful commissioning of its 400 kV Double Circuit LILO transmission line serving a 323.4 MW wind park in Gujarat.\"}},{\"@type\":\"Question\",\"name\":\"What is a LILO transmission line?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"LILO, or Loop-In Loop-Out, is a transmission line configuration that taps an existing high voltage corridor to connect new generation capacity to the grid, offering a capital efficient way to integrate renewable projects.\"}},{\"@type\":\"Question\",\"name\":\"What is the trading volume in Viviana Power Tech share price today?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Trading volume stood at 20,187 shares, an increase of 34.58 percent over the stock's five day average of 15,000 shares, reflecting heightened investor interest following the commissioning news.\"}},{\"@type\":\"Question\",\"name\":\"What does Viviana Power Tech do?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Viviana Power Tech operates in power transmission infrastructure, developing and executing high voltage transmission line projects that connect renewable energy generation capacity to the broader electricity grid.\"}},{\"@type\":\"Question\",\"name\":\"Why does the 400 kV voltage class matter for this project?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"400 kV is among the higher voltage classes used in India's transmission network, typically reserved for large scale power evacuation projects, making this a significant capacity milestone for the company.\"}},{\"@type\":\"Question\",\"name\":\"Is Viviana Power Tech share price a buy after this news?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"This article does not constitute investment advice. Investors should evaluate the company's broader order book and execution track record, and consult a SEBI registered adviser before acting on the Viviana Power Tech share price.\"}},{\"@type\":\"Question\",\"name\":\"Where can I track Viviana Power Tech share price live?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"You can track the Viviana Power Tech share price live on the Univest app and website, along with project execution and corporate action alerts.\"}}]}<\/script><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Viviana Power Tech share price is in focus after the company commissioned a 400 kV double circuit LILO transmission line serving a 323.4 MW wind park in Gujarat.<\/p>\n","protected":false},"author":35,"featured_media":162306,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[3802],"class_list":["post-162256","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-news"],"metadata":{"rank_math_internal_links_processed":["1"],"_edit_lock":["1784629673:29"],"_last_editor_used_jetpack":["block-editor"],"rank_math_primary_category":["842"],"rank_math_seo_score":["78"],"rank_math_title":["Viviana Power Tech Share Price in Focus on Line Commission"],"rank_math_description":["Viviana Power Tech share price is in focus after the company commissioned a 400 kV double circuit LILO transmission line serving a 323.4 MW wind park in Gujarat."],"rank_math_focus_keyword":["Viviana Power Tech share price"],"rank_math_robots":["a:2:{i:0;s:7:\"noindex\";i:1;s:8:\"nofollow\";}"],"_thumbnail_id":["162306"],"_edit_last":["29"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["28836"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/07\/Viviana-Power-Tech-Share-Price.jpg","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/162256","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/35"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=162256"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/162256\/revisions"}],"predecessor-version":[{"id":162310,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/162256\/revisions\/162310"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/162306"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=162256"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=162256"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=162256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}