{"id":148573,"date":"2026-07-13T11:52:35","date_gmt":"2026-07-13T06:22:35","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=148573"},"modified":"2026-07-13T11:52:36","modified_gmt":"2026-07-13T06:22:36","slug":"powerica-share-price-gujarat-wind-power-project-win","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/","title":{"rendered":"Powerica Share Price Jumps Nearly 3% as Company Wins 50 MW Gujarat Wind Power Project From GUVNL"},"content":{"rendered":"<div class=\"meta-block\"><\/div>\n<p style=\"border-left: 4px solid #1F4E79; background: #EBF3FB; padding: 10px 16px; font-style: italic;\"><em>Powerica wins 50 MW wind power project in GUVNL&#8217;s e-reverse auction for 250 MW grid-connected projects. Discovered tariff Rs 3.51 per unit, a 2.77% variation from the starting tariff. Stock up 2.95%.<\/em><\/p>\n<p>The Powerica share price jumped nearly 3 percent on Monday, 13 July 2026, after the company emerged as a winning bidder in the e-reverse auction conducted by Gujarat Urja Vikas Nigam, or GUVNL, for the procurement of power from 250 MW of grid-connected wind power projects. The competitive win adds another renewable energy project to the company&#8217;s growing portfolio.<\/p>\n<p><a href=\"https:\/\/univest.in\/stocks\/powerica\/powerica-ltd-share-price-today\">Powerica<\/a> has secured a 50 MW allocation out of the total 250 MW tendered by GUVNL, with a discovered tariff of Rs 3.51 per unit, representing a 2.77 percent variation from the tender&#8217;s starting tariff. The Powerica share price responded strongly to the news, quoting at Rs 583.45, up Rs 16.70 or 2.95 percent, having touched an intraday high of Rs 586.55 in early trade.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/user\/log-in\"><strong>Click Here &#8211; Get Free Investment Predictions<\/strong><\/a><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#Powerica_Share_Price_GUVNL_Wind_Project_Details\" title=\"Powerica Share Price: GUVNL Wind Project Details\">Powerica Share Price: GUVNL Wind Project Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#Why_the_Wind_Project_Win_Matters_for_the_Powerica_Share_Price\" title=\"Why the Wind Project Win Matters for the Powerica Share Price\">Why the Wind Project Win Matters for the Powerica Share Price<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#1_Expanding_Renewable_Energy_Portfolio\" title=\"1. Expanding Renewable Energy Portfolio\">1. Expanding Renewable Energy Portfolio<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#2_Competitive_Tariff_Discovery_Signals_Strong_Execution_Capability\" title=\"2. Competitive Tariff Discovery Signals Strong Execution Capability\">2. Competitive Tariff Discovery Signals Strong Execution Capability<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#3_Long-Term_Power_Purchase_Agreement_Visibility\" title=\"3. Long-Term Power Purchase Agreement Visibility\">3. Long-Term Power Purchase Agreement Visibility<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#What_Should_Investors_Watch_in_the_Powerica_Share_Price_Now\" title=\"What Should Investors Watch in the Powerica Share Price Now\">What Should Investors Watch in the Powerica Share Price Now<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#Frequently_Asked_Questions_FAQs\" title=\"Frequently Asked Questions FAQs\">Frequently Asked Questions FAQs<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#Why_is_the_Powerica_share_price_rising_today\" title=\"Why is the Powerica share price rising today?\">Why is the Powerica share price rising today?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#What_tariff_did_Powerica_secure_for_the_wind_power_project\" title=\"What tariff did Powerica secure for the wind power project?\">What tariff did Powerica secure for the wind power project?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#Who_conducted_the_auction_that_Powerica_won\" title=\"Who conducted the auction that Powerica won?\">Who conducted the auction that Powerica won?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#How_much_did_the_Powerica_share_price_gain_after_the_project_win\" title=\"How much did the Powerica share price gain after the project win?\">How much did the Powerica share price gain after the project win?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#How_much_capacity_did_Powerica_secure_out_of_the_total_tender\" title=\"How much capacity did Powerica secure out of the total tender?\">How much capacity did Powerica secure out of the total tender?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/univest.in\/blogs-2\/powerica-share-price-gujarat-wind-power-project-win\/#Should_investors_buy_Powerica_after_this_project_win\" title=\"Should investors buy Powerica after this project win?\">Should investors buy Powerica after this project win?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Powerica_Share_Price_GUVNL_Wind_Project_Details\"><\/span><strong>Powerica Share Price: GUVNL Wind Project Details<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The e-reverse auction process, where bidders compete on tariff to win capacity allocation, has become the standard procurement mechanism for renewable energy in India, and a competitive discovered tariff close to the starting benchmark reflects healthy demand for the allotted capacity.<\/p>\n<table>\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Detail<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Auction conductor<\/td>\n<td>Gujarat Urja Vikas Nigam, GUVNL<\/td>\n<\/tr>\n<tr>\n<td>Total tender size<\/td>\n<td>250 MW grid-connected wind power<\/td>\n<\/tr>\n<tr>\n<td>Capacity secured by Powerica<\/td>\n<td>50 MW<\/td>\n<\/tr>\n<tr>\n<td>Discovered tariff<\/td>\n<td>Rs 3.51 per unit<\/td>\n<\/tr>\n<tr>\n<td>Variation from starting tariff<\/td>\n<td>2.77 percent<\/td>\n<\/tr>\n<tr>\n<td>Current price<\/td>\n<td>Rs 583.45 (+2.95%)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>At Rs 3.51 per unit, the discovered tariff sits within a competitive range for wind power projects in India, suggesting Powerica was able to secure the allocation without needing to bid aggressively low, which would have compressed future project-level returns.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Why_the_Wind_Project_Win_Matters_for_the_Powerica_Share_Price\"><\/span><strong>Why the Wind Project Win Matters for the Powerica Share Price<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"1_Expanding_Renewable_Energy_Portfolio\"><\/span><strong>1. Expanding Renewable Energy Portfolio<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Winning a 50 MW allocation adds meaningfully to the company&#8217;s renewable energy generation capacity and diversifies its power generation mix. For companies operating in the power generation and equipment space, a growing project pipeline directly supports future revenue visibility, which is a key driver behind the Powerica share price.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_Competitive_Tariff_Discovery_Signals_Strong_Execution_Capability\"><\/span><strong>2. Competitive Tariff Discovery Signals Strong Execution Capability<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Securing capacity at a tariff with only a 2.77 percent variation from the starting benchmark indicates the company bid competitively without sacrificing project economics excessively. This balance between winning capacity and preserving returns is an important signal for investors assessing the quality of growth behind the Powerica share price, since aggressively low tariff bids can sometimes compromise project-level profitability even when they succeed in winning capacity.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_Long-Term_Power_Purchase_Agreement_Visibility\"><\/span><strong>3. Long-Term Power Purchase Agreement Visibility<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Wind power projects secured through GUVNL auctions typically come with long-term power purchase agreements spanning 20 to 25 years, providing predictable, tariff-linked cash flows once commissioned. This kind of long-duration revenue visibility is often valued favourably by the market in the Powerica share price over time.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/sebi-registered-investment-advisor-india\"><strong>Get Renewable Energy Sector Stock Guidance from a SEBI-Registered Investment Advisor<\/strong><\/a><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_Should_Investors_Watch_in_the_Powerica_Share_Price_Now\"><\/span><strong>What Should Investors Watch in the Powerica Share Price Now<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Investors should track the expected commissioning timeline for the new 50 MW project, along along with the specific project financing structure the company plans to use for this newly won capacity. Renewable energy build-outs typically involve a mix of debt and equity funding, and the balance chosen will A clearer picture on debt-to-equity mix for this specific project should emerge in upcoming investor communications and quarterly disclosures.affect return ratios that ultimately matter for the Powerica share price over the life of the project once it becomes fully operational and starts generating revenue under the long-term power purchase agreement.<\/p>\n<p>Given the sharp volume and price reaction on the day of the announcement, near-term momentum traders may continue to show interest in the counter, but investors with a longer time horizon should focus on how this project win fits into the company&#8217;s broader capacity addition roadmap and order book growth over the coming quarters. Tracking how the pace of new project wins compares with sector peers can also help gauge whether Powerica is gaining share in a fast-expanding renewable procurement market.<\/p>\n<p style=\"margin-top: 24px;\"><em>Download the <a href=\"http:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\">Univest iOS App<\/a> or <a href=\"http:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&amp;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\">Univest Android App<\/a> to track the Powerica share price live and get daily stock recommendations.<\/em><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Powerica&#8217;s win of a 50 MW wind power project in GUVNL&#8217;s competitive e-reverse auction, at a discovered tariff of Rs 3.51 per unit, has lifted the Powerica share price by nearly 3 percent to Rs 583.45. With a healthy tariff discovery and long-term power purchase agreement visibility typically associated with such projects, the win adds to the company&#8217;s renewable energy growth story. Investors should track the commissioning timeline and financing structure, and consult a SEBI-registered advisor before making investment decisions.<\/p>\n<div style=\"background: #CC0000; border-radius: 8px; padding: 16px 20px; margin: 24px 0;\">\n<p style=\"color: #ffffff; font-size: 13px; line-height: 1.7; margin: 0;\"><strong style=\"color: #ffffff;\">Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data with the official NSE (nseindia.com) and BSE (bseindia.com) websites before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).<\/p>\n<\/div>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions_FAQs\"><\/span><strong>Frequently Asked Questions FAQs<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Why_is_the_Powerica_share_price_rising_today\"><\/span><strong>Why is the Powerica share price rising today?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The Powerica share price is rising nearly 3 percent because the company won a 50 MW wind power project in GUVNL&#8217;s competitive e-reverse auction for 250 MW of grid-connected wind power capacity.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_tariff_did_Powerica_secure_for_the_wind_power_project\"><\/span><strong>What tariff did Powerica secure for the wind power project?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Powerica secured the 50 MW project at a discovered tariff of Rs 3.51 per unit, representing a 2.77 percent variation from the tender&#8217;s starting tariff.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Who_conducted_the_auction_that_Powerica_won\"><\/span><strong>Who conducted the auction that Powerica won?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The auction was conducted by Gujarat Urja Vikas Nigam, or GUVNL, for the procurement of power from 250 MW of grid-connected wind power projects.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_much_did_the_Powerica_share_price_gain_after_the_project_win\"><\/span><strong>How much did the Powerica share price gain after the project win?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The Powerica share price gained as much as 2.95 percent to Rs 583.45, touching an intraday high of Rs 586.55.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_much_capacity_did_Powerica_secure_out_of_the_total_tender\"><\/span><strong>How much capacity did Powerica secure out of the total tender?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Powerica secured a 50 MW allocation out of the total 250 MW of grid-connected wind power capacity tendered by GUVNL.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Should_investors_buy_Powerica_after_this_project_win\"><\/span><strong>Should investors buy Powerica after this project win?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The win adds positively to the company&#8217;s renewable energy pipeline, but investors should track commissioning timelines and financing details, and consult a SEBI-registered investment advisor before investing.<\/p>\n<div class=\"faq-schema\"><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Why is the Powerica share price rising today?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Powerica share price is rising nearly 3 percent because the company won a 50 MW wind power project in GUVNL's competitive e-reverse auction for 250 MW of grid-connected wind power capacity.\"}},{\"@type\":\"Question\",\"name\":\"What tariff did Powerica secure for the wind power project?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Powerica secured the 50 MW project at a discovered tariff of Rs 3.51 per unit, representing a 2.77 percent variation from the tender's starting tariff.\"}},{\"@type\":\"Question\",\"name\":\"Who conducted the auction that Powerica won?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The auction was conducted by Gujarat Urja Vikas Nigam, or GUVNL, for the procurement of power from 250 MW of grid-connected wind power projects.\"}},{\"@type\":\"Question\",\"name\":\"How much did the Powerica share price gain after the project win?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Powerica share price gained as much as 2.95 percent to Rs 583.45, touching an intraday high of Rs 586.55.\"}},{\"@type\":\"Question\",\"name\":\"How much capacity did Powerica secure out of the total tender?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Powerica secured a 50 MW allocation out of the total 250 MW of grid-connected wind power capacity tendered by GUVNL.\"}},{\"@type\":\"Question\",\"name\":\"Should investors buy Powerica after this project win?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The win adds positively to the company's renewable energy pipeline, but investors should track commissioning timelines and financing details, and consult a SEBI-registered investment advisor before investing.\"}}]}<\/script><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Powerica share price jumps nearly 3 percent to Rs 583.45 on 13 July 2026 after the company wins a 50 MW wind power project in GUVNL&#8217;s competitive e-reverse auction at a tariff of Rs 3.51 per unit.<\/p>\n","protected":false},"author":34,"featured_media":148583,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[4150],"class_list":["post-148573","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-share-price-jumps"],"metadata":{"rank_math_internal_links_processed":["1"],"_edit_lock":["1783923762:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_primary_category":["842"],"rank_math_seo_score":["77"],"rank_math_title":["Powerica Share Price Jumps 3% as Company Wins 50 MW Wind Project"],"rank_math_description":["Powerica share price jumps nearly 3 percent on 13 July 2026 after winning a 50 MW Gujarat wind power project from GUVNL at a discovered tariff of Rs 3.51 per unit."],"rank_math_focus_keyword":["Powerica share price"],"rank_math_robots":["a:2:{i:0;s:8:\"nofollow\";i:1;s:7:\"noindex\";}"],"_thumbnail_id":["148583"],"_edit_last":["23"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["25628"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/07\/banner-37.png","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/148573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/34"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=148573"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/148573\/revisions"}],"predecessor-version":[{"id":148586,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/148573\/revisions\/148586"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/148583"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=148573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=148573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=148573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}