{"id":147587,"date":"2026-07-10T13:57:39","date_gmt":"2026-07-10T08:27:39","guid":{"rendered":"https:\/\/univest.in\/blogs-2\/?p=147587"},"modified":"2026-07-10T13:57:40","modified_gmt":"2026-07-10T08:27:40","slug":"elecon-engineering-q1-results-fy27-pat-70-crore","status":"publish","type":"post","link":"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/","title":{"rendered":"Elecon Engineering Q1 Results FY27: PAT Falls 59.9% to Rs 70 Crore on High Base, Revenue Up 6.1%"},"content":{"rendered":"<div class=\"meta-block\"><\/div>\n<p style=\"border-left: 4px solid #1F4E79; background: #EBF3FB; padding: 10px 16px; font-style: italic;\"><em>Elecon Engineering Q1 FY27: PAT Rs 70.35 Cr, down 59.90% YoY on a high base. Revenue Rs 520.56 Cr, up 6.11%. Order book Rs 1,518 Cr. Stock fell to a low of Rs 482.30 before recovering.<\/em><\/p>\n<p>Elecon Engineering Q1 results FY27 were announced on Thursday, 9 July 2026, with the Vadodara based industrial gears and material handling equipment maker reporting a consolidated net profit (PAT) of Rs 70.35 crore, down 59.90% from Rs 175.44 crore in Q1 FY26. Revenue from operations in the Elecon Engineering Q1 results FY27 rose 6.11% year on year to Rs 520.56 crore from Rs 490.57 crore, so the headline profit fall sits alongside genuine top line growth.<\/p>\n<p>Shares of <a href=\"https:\/\/univest.in\/stocks\/elecon\/elecon-engineering-company-ltd-share-price-today\">Elecon Engineering<\/a> fell as much as 5.98% intraday to a low of Rs 482.30 on the BSE after the Elecon Engineering Q1 results FY27 were released, before recovering through the session as investors worked through the base effect behind the profit decline. The stock last traded near Rs 512 on the NSE.<\/p>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/user\/log-in?utm_source=blogs&amp;utm_medium=elecon-engineering-q1-fy27-pat\"><strong>Click Here &#8211; Get Free Investment Predictions<\/strong><\/a><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_65 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title \" >Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Elecon_Engineering_Q1_Results_FY27_Financial_Highlights\" title=\"Elecon Engineering Q1 Results FY27 Financial Highlights\">Elecon Engineering Q1 Results FY27 Financial Highlights<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Elecon_Engineering_Q1_Results_FY27_Performance_Analysis\" title=\"Elecon Engineering Q1 Results FY27 Performance Analysis\">Elecon Engineering Q1 Results FY27 Performance Analysis<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Elecon_Engineering_Q1_Results_FY27_Key_Business_Factors\" title=\"Elecon Engineering Q1 Results FY27: Key Business Factors\">Elecon Engineering Q1 Results FY27: Key Business Factors<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#1_Base_Effect_from_Last_Years_Exceptional_Gain\" title=\"1. Base Effect from Last Year&#8217;s Exceptional Gain\">1. Base Effect from Last Year&#8217;s Exceptional Gain<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#2_Gear_Division_Momentum\" title=\"2. Gear Division Momentum\">2. Gear Division Momentum<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#3_Record_Order_Book_Supporting_FY27_Guidance\" title=\"3. Record Order Book Supporting FY27 Guidance\">3. Record Order Book Supporting FY27 Guidance<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Dividend_Details\" title=\"Dividend Details\">Dividend Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Elecon_Engineering_Q1_Results_FY27_Outlook_for_the_Full_Year\" title=\"Elecon Engineering Q1 Results FY27 Outlook for the Full Year\">Elecon Engineering Q1 Results FY27 Outlook for the Full Year<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Elecon_Engineering_Stock_Performance_After_the_Q1_Results\" title=\"Elecon Engineering Stock Performance After the Q1 Results\">Elecon Engineering Stock Performance After the Q1 Results<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Key_Risks\" title=\"Key Risks\">Key Risks<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#1_Margin_Pressure_in_the_Gear_Division\" title=\"1. Margin Pressure in the Gear Division\">1. Margin Pressure in the Gear Division<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#2_Execution_Risk_on_a_Large_Order_Book\" title=\"2. Execution Risk on a Large Order Book\">2. Execution Risk on a Large Order Book<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#3_Cyclicality_in_Capital_Goods_Demand\" title=\"3. Cyclicality in Capital Goods Demand\">3. Cyclicality in Capital Goods Demand<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Conclusion\" title=\"Conclusion\">Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Frequently_Asked_Questions_on_Elecon_Engineering_Q1_Results_FY27\" title=\"Frequently Asked Questions on Elecon Engineering Q1 Results FY27\">Frequently Asked Questions on Elecon Engineering Q1 Results FY27<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#When_were_the_Elecon_Engineering_Q1_results_FY27_announced\" title=\"When were the Elecon Engineering Q1 results FY27 announced?\">When were the Elecon Engineering Q1 results FY27 announced?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#What_is_the_PAT_in_Elecon_Engineering_Q1_results_FY27\" title=\"What is the PAT in Elecon Engineering Q1 results FY27?\">What is the PAT in Elecon Engineering Q1 results FY27?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Why_did_Elecon_Engineering_profit_fall_despite_higher_revenue\" title=\"Why did Elecon Engineering profit fall despite higher revenue?\">Why did Elecon Engineering profit fall despite higher revenue?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#What_was_the_revenue_in_Elecon_Engineering_Q1_results_FY27\" title=\"What was the revenue in Elecon Engineering Q1 results FY27?\">What was the revenue in Elecon Engineering Q1 results FY27?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#How_did_Elecon_Engineering_share_price_react_to_the_Q1_results_FY27\" title=\"How did Elecon Engineering share price react to the Q1 results FY27?\">How did Elecon Engineering share price react to the Q1 results FY27?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#What_is_the_order_book_for_Elecon_Engineering_after_the_Q1_results_FY27\" title=\"What is the order book for Elecon Engineering after the Q1 results FY27?\">What is the order book for Elecon Engineering after the Q1 results FY27?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/univest.in\/blogs-2\/elecon-engineering-q1-results-fy27-pat-70-crore\/#Is_Elecon_Engineering_a_good_buy_after_the_Q1_results_FY27\" title=\"Is Elecon Engineering a good buy after the Q1 results FY27?\">Is Elecon Engineering a good buy after the Q1 results FY27?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Elecon_Engineering_Q1_Results_FY27_Financial_Highlights\"><\/span><strong>Elecon Engineering Q1 Results FY27 Financial Highlights<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The June quarter paired a sharp headline profit fall with healthy underlying revenue growth, and untangling that gap is the central task here. The table below summarises the consolidated Elecon Engineering Q1 results FY27 against the year ago quarter.<\/p>\n<table>\n<thead>\n<tr>\n<th>Metric<\/th>\n<th>Q1 FY27<\/th>\n<th>Q1 FY26<\/th>\n<th>YoY Change<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Revenue from Operations<\/td>\n<td>Rs 520.56 Cr<\/td>\n<td>Rs 490.57 Cr<\/td>\n<td>+6.11%<\/td>\n<\/tr>\n<tr>\n<td>Gear Division Revenue<\/td>\n<td>Rs 416 Cr<\/td>\n<td>Rs 357 Cr<\/td>\n<td>+16.3%<\/td>\n<\/tr>\n<tr>\n<td>Net Profit (PAT)<\/td>\n<td>Rs 70.35 Cr<\/td>\n<td>Rs 175.44 Cr<\/td>\n<td>-59.90%<\/td>\n<\/tr>\n<tr>\n<td>One-time Gain in Base Quarter<\/td>\n<td>None<\/td>\n<td>~Rs 80.50 Cr<\/td>\n<td>Not repeated<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The Rs 80.50 crore figure in the base quarter, a key number to understand the Elecon Engineering Q1 results FY27 correctly, combines an Rs 80 crore exceptional gain from reclassifying the company&#8217;s investment in Eimco Elecon India from an associate to a financial asset, plus other income from an arbitration settlement. None of this one-time income recurred this quarter.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Elecon_Engineering_Q1_Results_FY27_Performance_Analysis\"><\/span><strong>Elecon Engineering Q1 Results FY27 Performance Analysis<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"margin-top: 24px;\"><a href=\"https:\/\/univest.in\/sebi-registered-investment-advisor-india\"><strong>Get Personalised Guidance from a SEBI-Registered Investment Advisor<\/strong><\/a><\/p>\n<p>The 59.90% PAT decline looks alarming in isolation, but it is a high base problem rather than a demand problem. Strip out the roughly Rs 80.50 crore of one-time income from Q1 FY26, and adjusted profit in that base quarter was closer to Rs 95 crore, which makes the Elecon Engineering Q1 results FY27 profit of Rs 70.35 crore a more modest, though still real, decline on a like-for-like basis.<\/p>\n<p>The Gear division carried the quarter. Revenue in the Elecon Engineering Q1 results FY27 grew 16.3% to Rs 416 crore from Rs 357 crore, with management citing improved execution across overseas subsidiaries and healthy domestic demand as the key drivers, with an EBIT margin of 17.9% for the division.<\/p>\n<p>Order momentum stayed strong through the quarter. Consolidated order intake came in at Rs 755 crore, and the open order book stood at Rs 1,518 crore as of 30 June 2026, giving the company clear revenue visibility well beyond the June quarter into the rest of the financial year.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Elecon_Engineering_Q1_Results_FY27_Key_Business_Factors\"><\/span><strong>Elecon Engineering Q1 Results FY27: Key Business Factors<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"1_Base_Effect_from_Last_Years_Exceptional_Gain\"><\/span><strong>1. Base Effect from Last Year&#8217;s Exceptional Gain<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The single biggest factor behind the headline number is arithmetic, not operations, and understanding it is essential to reading the Elecon Engineering Q1 results FY27 correctly. Q1 FY26 profit was inflated by a non-recurring mark-to-market gain on an investment reclassification, and this year&#8217;s comparison naturally looks weak against that unusually high base, a nuance every reader of the Elecon Engineering Q1 results FY27 should keep in mind.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_Gear_Division_Momentum\"><\/span><strong>2. Gear Division Momentum<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Strong execution on export orders and steady domestic demand from power, cement and steel customers powered the 16.3% Gear division growth, the standout positive buried inside the June quarter print.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_Record_Order_Book_Supporting_FY27_Guidance\"><\/span><strong>3. Record Order Book Supporting FY27 Guidance<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The Elecon Engineering Q1 results FY27 leave an open order book of Rs 1,518 crore against management&#8217;s FY27 revenue target of around Rs 2,200 crore to Rs 2,650 crore, which gives reasonable coverage, and this pipeline is the clearest reason to look past the one-off driven optics of the June quarter.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Dividend_Details\"><\/span><strong>Dividend Details<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>No new dividend was announced with the Elecon Engineering Q1 results FY27. The company had earlier declared an interim dividend of Rs 1.50 per share with a record date of 12 June 2026, continuing its practice of paying dividends through the year rather than only at year end, a pattern unrelated to this quarter&#8217;s headline swings.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Elecon_Engineering_Q1_Results_FY27_Outlook_for_the_Full_Year\"><\/span><strong>Elecon Engineering Q1 Results FY27 Outlook for the Full Year<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The June quarter sets a base year comparison that should normalise from the September quarter onward, since Q1 FY26 was the peak quarter for one-time gains, a fact worth remembering when comparing future prints against the Elecon Engineering Q1 results FY27. Investors should track Gear division margin recovery toward the 24% steady state guided by management, MHE division order conversion, and commentary from the 13 July 2026 earnings call. Management continues to target FY27 revenue in the Rs 2,200 crore to Rs 2,650 crore range with EBITDA margins near 24%.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Elecon_Engineering_Stock_Performance_After_the_Q1_Results\"><\/span><strong>Elecon Engineering Stock Performance After the Q1 Results<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"margin-top: 24px;\"><em>Download the <a href=\"http:\/\/apps.apple.com\/in\/app\/univest-stocks-investment\/id6443753518\" rel=\"nofollow noopener\" target=\"_blank\">Univest iOS App<\/a> or <a href=\"http:\/\/play.google.com\/store\/apps\/details?id=com.univest.capp&amp;hl=en_IN\" rel=\"nofollow noopener\" target=\"_blank\">Univest Android App<\/a> to track Elecon Engineering live share price and upcoming quarterly results.<\/em><\/p>\n<p>Elecon Engineering share price fell sharply on results day, touching an intraday low of Rs 482.30 on the BSE, a fall of nearly 6%, before paring losses as the market digested the one-time-gain explanation behind the Elecon Engineering Q1 results FY27. The stock later traded closer to flat levels near Rs 512 on the NSE.<\/p>\n<p>Beyond the Elecon Engineering Q1 results FY27, the stock is down about 22% over the past year even after a strong prior year of 46% profit growth in FY26, and it currently commands a market capitalisation of roughly Rs 11,150 crore. Brokerages that track the counter have generally kept a positive view, with average price targets implying meaningful upside from current levels, framing the Elecon Engineering Q1 results FY27 as a base effect event rather than a change in the investment case.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Key_Risks\"><\/span><strong>Key Risks<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Investors going through the fine print of the Elecon Engineering Q1 results FY27 should also weigh the following risks.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_Margin_Pressure_in_the_Gear_Division\"><\/span><strong>1. Margin Pressure in the Gear Division<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>A recurring theme beyond the Elecon Engineering Q1 results FY27, higher depreciation from new capacity and brand-building costs have weighed on Gear division margins over recent quarters, and a slower than expected recovery could delay the return to steady-state profitability.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_Execution_Risk_on_a_Large_Order_Book\"><\/span><strong>2. Execution Risk on a Large Order Book<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>A theme that will outlast the Elecon Engineering Q1 results FY27, converting the Rs 1,518 crore order book into revenue on schedule is essential. Delays in customer receipts, as seen in past quarters, could push growth into later periods.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_Cyclicality_in_Capital_Goods_Demand\"><\/span><strong>3. Cyclicality in Capital Goods Demand<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Demand for industrial gears and material handling equipment tracks capex cycles in power, cement, steel and mining. A slowdown in any of these sectors would directly affect order inflows, a risk that sits well beyond the scope of the Elecon Engineering Q1 results FY27 but is worth flagging here.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The quarter shows a 59.90% fall in reported PAT to Rs 70.35 crore, but the drop is almost entirely a base effect from last year&#8217;s Rs 80.50 crore one-time gain rather than weak operations. Revenue up 6.11%, Gear division growth of 16.3% and a record Rs 1,518 crore order book are the real takeaways of the Elecon Engineering Q1 results FY27. Investors should watch the 13 July earnings call for margin guidance and consult a SEBI-registered advisor before acting on the numbers.<\/p>\n<div style=\"background: #CC0000; border-radius: 8px; padding: 16px 20px; margin: 24px 0;\">\n<p style=\"color: #ffffff; font-size: 13px; line-height: 1.7; margin: 0;\"><strong style=\"color: #ffffff;\">Disclaimer:<\/strong> Data and figures in this article are sourced from publicly available information. These may or may not be accurate. Please verify all data with the official NSE (nseindia.com) and BSE (bseindia.com) websites before making any investment decision. Investments in securities are subject to market risk. This content is for educational purposes only and is not investment advice by Univest (SEBI RA INH000013776).<\/p>\n<\/div>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions_on_Elecon_Engineering_Q1_Results_FY27\"><\/span><strong>Frequently Asked Questions on Elecon Engineering Q1 Results FY27<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"When_were_the_Elecon_Engineering_Q1_results_FY27_announced\"><\/span><strong>When were the Elecon Engineering Q1 results FY27 announced?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The Elecon Engineering Q1 results FY27 were announced on Thursday, 9 July 2026, after the board approved the consolidated unaudited financial results for the quarter ended 30 June 2026, with the earnings call scheduled for 13 July 2026.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_PAT_in_Elecon_Engineering_Q1_results_FY27\"><\/span><strong>What is the PAT in Elecon Engineering Q1 results FY27?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The PAT in Elecon Engineering Q1 results FY27 stood at Rs 70.35 crore, down 59.90% from Rs 175.44 crore in Q1 FY26. The fall is due to a high year-ago base, since Q1 FY26 included an Rs 80 crore exceptional gain that did not repeat this year.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Why_did_Elecon_Engineering_profit_fall_despite_higher_revenue\"><\/span><strong>Why did Elecon Engineering profit fall despite higher revenue?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Profit in the Elecon Engineering Q1 results FY27 fell because Q1 FY26 included a one-time exceptional gain of around Rs 80.50 crore from the reclassification of its investment in Eimco Elecon India, plus arbitration income. Without that one-time boost, the underlying operating performance behind the Elecon Engineering Q1 results FY27 was healthy, with revenue rising 6.1%.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_was_the_revenue_in_Elecon_Engineering_Q1_results_FY27\"><\/span><strong>What was the revenue in Elecon Engineering Q1 results FY27?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Revenue from operations in the Elecon Engineering Q1 results FY27 rose 6.11% year on year to Rs 520.56 crore from Rs 490.57 crore, led by 16.3% growth in the Gear division to Rs 416 crore, a strong start to the Elecon Engineering Q1 results FY27 season for the company&#8217;s core business.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_did_Elecon_Engineering_share_price_react_to_the_Q1_results_FY27\"><\/span><strong>How did Elecon Engineering share price react to the Q1 results FY27?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Elecon Engineering share price fell as much as 5.98% intraday to a low of Rs 482.30 after the Elecon Engineering Q1 results FY27, before recovering through the session to trade closer to flat, reflecting how quickly the market absorbed the one-time-gain explanation.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_order_book_for_Elecon_Engineering_after_the_Q1_results_FY27\"><\/span><strong>What is the order book for Elecon Engineering after the Q1 results FY27?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> Elecon Engineering reported a consolidated order intake of Rs 755 crore during the quarter, with an open order book of Rs 1,518 crore as of 30 June 2026, giving strong revenue visibility for the rest of FY27.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Is_Elecon_Engineering_a_good_buy_after_the_Q1_results_FY27\"><\/span><strong>Is Elecon Engineering a good buy after the Q1 results FY27?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Ans.<\/strong> The Elecon Engineering Q1 results FY27 show a headline profit fall driven by a high base rather than weak operations, alongside healthy revenue growth and a strong order book. This article is for educational purposes only. Consult a SEBI-registered advisor before investing.<\/p>\n<div class=\"faq-schema\"><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"When were the Elecon Engineering Q1 results FY27 announced?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Elecon Engineering Q1 results FY27 were announced on Thursday, 9 July 2026, after the board approved the consolidated unaudited financial results for the quarter ended 30 June 2026, with the earnings call scheduled for 13 July 2026.\"}},{\"@type\":\"Question\",\"name\":\"What is the PAT in Elecon Engineering Q1 results FY27?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The PAT in Elecon Engineering Q1 results FY27 stood at Rs 70.35 crore, down 59.90% from Rs 175.44 crore in Q1 FY26. The fall is due to a high year-ago base, since Q1 FY26 included an Rs 80 crore exceptional gain that did not repeat this year.\"}},{\"@type\":\"Question\",\"name\":\"Why did Elecon Engineering profit fall despite higher revenue?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Profit in the Elecon Engineering Q1 results FY27 fell because Q1 FY26 included a one-time exceptional gain of around Rs 80.50 crore from the reclassification of its investment in Eimco Elecon India, plus arbitration income. Without that one-time boost, the underlying operating performance behind the Elecon Engineering Q1 results FY27 was healthy, with revenue rising 6.1%.\"}},{\"@type\":\"Question\",\"name\":\"What was the revenue in Elecon Engineering Q1 results FY27?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Revenue from operations in the Elecon Engineering Q1 results FY27 rose 6.11% year on year to Rs 520.56 crore from Rs 490.57 crore, led by 16.3% growth in the Gear division to Rs 416 crore.\"}},{\"@type\":\"Question\",\"name\":\"How did Elecon Engineering share price react to the Q1 results FY27?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Elecon Engineering share price fell as much as 5.98% intraday to a low of Rs 482.30 after the Elecon Engineering Q1 results FY27, before recovering through the session to trade closer to flat, reflecting how quickly the market absorbed the one-time-gain explanation.\"}},{\"@type\":\"Question\",\"name\":\"What is the order book for Elecon Engineering after the Q1 results FY27?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Elecon Engineering reported a consolidated order intake of Rs 755 crore during the quarter, with an open order book of Rs 1,518 crore as of 30 June 2026, giving strong revenue visibility for the rest of FY27.\"}},{\"@type\":\"Question\",\"name\":\"Is Elecon Engineering a good buy after the Q1 results FY27?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Elecon Engineering Q1 results FY27 show a headline profit fall driven by a high base rather than weak operations, alongside healthy revenue growth and a strong order book. This article is for educational purposes only. Consult a SEBI-registered advisor before investing.\"}}]}<\/script><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Elecon Engineering Q1 results FY27: PAT falls 59.90% YoY to Rs 70.35 crore against a high base from last year&#8217;s Rs 80.50 crore one-time gain, while revenue rises 6.11% to Rs 520.56 crore and the order book hits Rs 1,518 crore. Full analysis of the base effect, Gear division momentum and FY27 outlook.<\/p>\n","protected":false},"author":34,"featured_media":147617,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[842],"tags":[4796],"class_list":["post-147587","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-q1-results-fy27"],"metadata":{"rank_math_internal_links_processed":["1"],"_edit_lock":["1783672065:23"],"_last_editor_used_jetpack":["block-editor"],"rank_math_primary_category":["842"],"rank_math_seo_score":["81"],"rank_math_title":["Elecon Engineering Q1 Results FY27: PAT Rs 70 Cr, Down 60%"],"rank_math_description":["Elecon Engineering Q1 results FY27: PAT falls 59.9% YoY to Rs 70.35 Cr on a high one-time-gain base, revenue up 6.1% to Rs 520.56 Cr. Full Q1 FY27 results analysis, stock reaction and FY27 outlook."],"rank_math_focus_keyword":["Elecon Engineering Q1 results FY27"],"rank_math_robots":["a:2:{i:0;s:8:\"nofollow\";i:1;s:7:\"noindex\";}"],"_thumbnail_id":["147617"],"_edit_last":["23"],"_ez-toc-disabled":[""],"_ez-toc-insert":[""],"_ez-toc-header-label":[""],"_ez-toc-alignment":["none"],"_ez-toc-heading-levels":["a:0:{}"],"_ez-toc-alttext":[""],"_ez-toc-visibility_hide_by_default":[""],"_ez-toc-hide_counter":[""],"_ez-toc-exclude":[""],"_ez-toc-position-specific":["before"],"stm_select_gm_zoom":[""],"stm_agenda":[""],"stm_host":[""],"stm_select_approved_denied":[""],"stm_multiselect_approved":[""],"stm_multiselect_denied":[""],"stm_date":[""],"stm_time":[""],"stm_timezone":[""],"stm_duration":[""],"stm_password":[""],"stm_waiting_room":[""],"stm_join_before_host":[""],"stm_host_join_start":[""],"stm_start_after_participants":[""],"stm_mute_participants":[""],"stm_enforce_login":[""],"stm_alternative_hosts":[""],"top_bar_custom_style":[""],"top_bar_bg":[""],"wc_top_bar_cart_custom_style":[""],"wc_top_bar_cart_color":[""],"wc_top_bar_cart_icon_color_hover":[""],"wc_top_bar_cart_counter_color":[""],"wc_top_bar_cart_counter_color_hover":[""],"wc_top_bar_cart_counter_bg":[""],"wc_top_bar_cart_counter_bg_hover":[""],"top_bar_wpml_switcher_custom_style":[""],"wpml_switcher_color":[""],"top_bar_wpml_switcher_bg":[""],"top_bar_wpml_switcher_bg_hover":[""],"top_bar_wpml_switcher_color_hover":[""],"top_bar_socials_custom_style":[""],"top_bar_socials_color":[""],"top_bar_socials_color_hover":[""],"top_bar_search_custom_style":[""],"top_bar_search_color":[""],"top_bar_search_icon_color_hover":[""],"top_bar_contact_info_style":[""],"top_bar_contact_info_color":[""],"top_bar_contact_info_link_color":[""],"top_bar_contact_info_link_color_hover":[""],"top_bar_contact_info_select_bg":[""],"top_bar_contact_info_select_color":[""],"top_bar_contact_info_select_drop_bg":[""],"top_bar_contact_info_select_items_bg":[""],"top_bar_contact_info_select_items_color":[""],"top_bar_contact_info_select_items_hover":[""],"header_inverse":["default"],"enable_header_transparent":["off"],"header_nav_custom_style":[""],"header_bg":[""],"header_shadow":[""],"wc_cart_custom_style":[""],"wc_cart_icon_color":[""],"wc_cart_icon_color_hover":[""],"wc_cart_counter_color":[""],"wc_cart_counter_color_hover":[""],"wc_cart_counter_bg":[""],"wc_cart_counter_bg_hover":[""],"header_wpml_switcher_custom_style":[""],"header_wpml_switcher_color":[""],"header_wpml_switcher_color_hover":[""],"header_wpml_switcher_bg":[""],"header_wpml_switcher_bg_hover":[""],"header_socials_custom_style":[""],"header_socials_color":[""],"header_socials_color_hover":[""],"header_search_custom_style":[""],"header_search_icon_color":[""],"header_search_icon_color_hover":[""],"header_contact_info_style":[""],"header_contact_info_color":[""],"header_contact_info_link_color":[""],"header_contact_info_link_color_hover":[""],"header_button_custom_style":[""],"header_button_color":[""],"header_button_color_hover":[""],"header_button_bg":[""],"header_button_bg_hover":[""],"header_nav_menu_customize":[""],"header_nav_menu_link_color":[""],"header_nav_menu_link_color_hover":[""],"header_nav_menu_link_color_active":[""],"header_nav_menu_link_arrow_color":[""],"header_nav_menu_link_arrow_color_hover":[""],"header_nav_menu_level_1_bg":[""],"header_nav_menu_level_1_link_color":[""],"header_nav_menu_level_1_link_color_hover":[""],"header_nav_menu_level_1_link_bg_hover":[""],"header_nav_menu_level_1_link_arrow_color":[""],"header_nav_menu_level_1_link_arrow_color_hover":[""],"header_nav_menu_level_2_bg":[""],"header_nav_menu_level_2_link_color":[""],"header_nav_menu_level_2_link_color_hover":[""],"header_nav_menu_level_2_link_bg_hover":[""],"header_mega_menu_bg":[""],"header_mega_menu_title_color":[""],"header_mega_menu_title_color_hover":[""],"header_mega_menu_description_color":[""],"header_mega_menu_description_link_color":[""],"header_mega_menu_description_link_color_hover":[""],"header_mega_menu_color":[""],"header_mega_menu_color_hover":[""],"header_mega_menu_border_color":[""],"header_mega_menu_icons_color":[""],"header_nav_menu_customize_end":[""],"hfe_enabled_notice":[""],"disable_title_box":["default"],"hfe_disabled":[""],"enable_transparent":["default"],"title_box_title_bg_color":[""],"title_box_bg_custom_image":["default"],"title_box_bg_image":[""],"title_box_bg_position":["default"],"metabox_title_box_bg_position_x":[""],"metabox_title_box_bg_position_y":[""],"metabox_title_box_bg_attachment":["default"],"title_box_bg_size":["default"],"metabox_title_box_bg_size_slider":[""],"title_box_bg_repeat":["default"],"disable_title":["default"],"title_box_title_color":[""],"title_box_title_line_color":[""],"disable_breadcrumbs":["default"],"metabox_title_box_breadcrumbs_color":[""],"metabox_title_box_links_color":[""],"metabox_title_box_links_color_hover":[""],"content_bg_transparent":[""],"show_popup_single":[""],"popups_single":[""],"popups_single_event":[""],"popup_single_event_open_delay":[""],"popup_single_event_showing_in":[""],"popup_single_event_date_from":[""],"popup_single_event_date_to":[""],"popup_single_event_time_from":[""],"popup_single_event_time_to":[""],"popup_single_animation":[""],"popup_single_responsive":[""],"separator_footer_copyright_border_t":[""],"name":[""],"email":[""],"phone":[""],"company":[""],"memberId":[""],"testimonial_position":[""],"testimonial_company":[""],"testimonial_bg_img":[""],"testimonial_video_url":[""],"popups_width":[""],"popups_height":[""],"popups_image_bg":[""],"popups_color_bg":[""],"popups_border_radius":[""],"popups_template":[""],"rank_math_analytic_object_id":["25429"]},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/univest.in\/blogs-2\/wp-content\/uploads\/2026\/07\/banner-20.png","_links":{"self":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/147587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/users\/34"}],"replies":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/comments?post=147587"}],"version-history":[{"count":1,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/147587\/revisions"}],"predecessor-version":[{"id":147620,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/posts\/147587\/revisions\/147620"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media\/147617"}],"wp:attachment":[{"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/media?parent=147587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/categories?post=147587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/univest.in\/blogs-2\/wp-json\/wp\/v2\/tags?post=147587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}